    Geology and exploration history of the gold mineralization in the star lake area, saskatchewan

    By W. L. Murphy

    The Star Lake property, located 115 km northeast of La Ronge, Saskatchewan is underlain by metamorphosed andesitic tuffs and flows which have been intruded by the dioritic to granitic Star Lake Pluton

    Jan 1, 1986

  • CIM
    On Education ?and the Shortage of Technical and Scientific Manpower

    By F. R. Archibald

    A STATEMENT on this subject by A. D. Turnbull, presented and discussed at the Annual Business Conference of the Metallurgy Division, C.I.M., held in Ottawa on April 22nd 1957, led to creation of a com

    Jan 1, 1958

  • CIM
    Mine Planning

    By G. Scott Zimmer

    Mine planning at Cassiar consists of an annual cycle of projection, control, evaluation and revision following completion of annual diamond drilling during the summer months . The inherent difficulty

    Jan 1, 1978

  • CIM
    Analysis And Enhancement Of Cracking Resistance In Thermal Barrier Coatings By Functionally Graded Layers

    Thermal barrier coating (TBC) systems provide thermal insulation to high temperature for aero¬propulsion. A fracture mechanical model developed earlier for multilayer systems is applied on TBC to real

    Jan 1, 2010

  • CIM
    Some Accident Hazards and Preventive Measures at Mines

    By E. C. Keeley

    Some Safety Measures at Ontario Mines The following safety precautions have of late been taken by several of the Ontario mines: installation of water crossovers; washing clown of faces to show-up mis

    Jan 1, 1931

  • CIM
    Impurity Removal in the Jarosite Precipitation Circuit of the Electrolytic Zinc Plant of Met-Mex, Peñoles S.A C.V

    By C. Rocha R.

    Petioles is a mining group with integrated operations in the smelting and refining of non-ferrous metals, and is also a chemicals producer. Peñoles is the world's foremost producer of refined sil

    Jan 1, 2006

  • CIM
    Athabasca Basin Proterozoic Unconformity Uranium Deposits: Alteration, Deposit Geometry And Lithostructural Setting

    By A. Aubin, H. Yang, G. Zaluski

    The Athabasca Basin of northern Saskatchewan and Alberta is an exceptionally rich metallogenic region, hosting more than 2.8 B lb U3O8, of which over 927 M lb U3O8 have been mined out since extraction

    Jan 1, 2020

  • CIM
    Efficiency of the cylinder test for the evaluation of red mud slurry flocculation and of residual turbidity

    By M. Normandin

    The performance of various polymers and other macromolecules used to flocculate red mud particulate materials in the Bayer process can be evaluated on the basis of their efficiency to achieve adequate

    Jan 1, 2005

  • CIM
    Ashton Mining of Canada Inc. - Foxtrot Property Diamond Project Advanced Evaluation and Bulk Sampling Update

    Presentation Outline Introduction Deposit Characteristics Geology Grade, Value and Tonnage Estimates 2006 Advanced Program Drilling Bulk Sampling DMS Test Facility 2006 Exploration Summary

    May 1, 2006

  • CIM
    Principles of Using Microdiamonds for Resource Estimation: 1—The Impact of Mantle and Kimberlite Processes

    By J. J. Ferreira, M. L. Thurston, I. L. Chinn, D. M. Rose

    "Concerns about using microdiamonds for resource estimation have been raised by workers because multiple diamond populations exist in many parts of the mantle source region, small diamonds in kimberli

    Jan 1, 2016

  • CIM
    Extending the life of INMETCO’s submerged arc furnace lining

    By C. Doyle, D. M. Hoffman, C. Díaz, J. Hrepic, W. J. Koshut, R. H. Hanewald

    "Recently, lining life of the INMETCO submerged arc furnace has been dramatically extended from an average of eleven months in the 1980s to a current record of 34 months. This paper summarizes test wo

    Jan 1, 1997

  • CIM
    Distribution Regularities of In-Situ Stress Field of Asymmetric Valley of Baihetan Hydropower Station

    By Rong. G., T. Q. Lin, W. Du

    Based on analysis of the evolutionary history of the valley in Baihetan, the mechanism of asymmetrical evolution, gradual migration-incision evolved from left bank to the right, is revealed in Baiheta

    Jan 1, 2015

  • CIM
    The Geology and Ore Deposits of the No. 8 Shaft Area, Dome Mine

    By Dean S. Rogers

    "In February 1980, Dome Mines Limited announced a $50 million expansion program which would result in a 50% increase in mill capacity from the present 1,815 tonnes per day to an eventual production ra

    Jan 1, 1982

  • CIM
    Geology of the Athabasca Basin

    By F. F. Langford

    "The Athabasca Basin occupies about 100,000 km2 of the northwest corner of Saskatchewan with its western margin extending about 50 km into Alberta (Fig. 1). The basin is filled with a Helikian sequenc

    Jan 1, 1986

  • CIM
    HPGR Trade-Off Studies and How to Avoid Them

    By C. T. Morley

    The steadily increasing interest in high pressure grinding rolls (HPGR) as a legitimate alternative comminution technology for hard rock applications has led to a proportional increase in the demand f

    Jan 1, 2012

  • CIM
    The Mechanical and-Electrical Aspects of Sinking The Creighton No. 9 Shaft

    By J. S. Redpath, W. R. Dengler

    "A description of the equipment used and the electrical-mechanical problems encountered in sinking a deep shaft is given. This shaft is currently being sunk to a depth of 7,115 feet. Some of the featu

    Jan 1, 1968

  • CIM
    Structure of the Ferderber gold deposit, Belmoral Mines Ltd., Val d'Or, Quebec

    By L. Vu, V. Popov, J. Beland, R. Darling

    "The Ferderber gold deposit is of Archean age. It consists of a series of gold-bearing quartz lenses within a shear zone that crosscuts the central part of the quartz dioritic Bourlamaque batholith. O

    Jan 1, 1987

  • CIM
    The Salt Deposits of Malagash, Nova Scotia

    By A. R. Chambers

    Malagash received its name from the Indians many years ago on acco.unt of its turbid (milky) waters, although,' the red men did not appreciate the significance of this turbidity, and were, of cou

    Jan 1, 1924

  • CIM
    Blind drilling for shaft development

    By James H. Cobbs

    Blind boring of shafts is becoming an increasingly important part of shaft sinking. Blind-bored shafts have reached diameters of 25 It in Europe and 16-1/2 ft in the United States. Much of the technol

    Jan 1, 1979

  • CIM
    Advances in the Use of Polytetrafluoroethylene during Medium Temperature Pressure Oxidation of Chalcopyrite

    "Previous studies on the effect of polytetrafluoroethylene addition during chalcopyrite leaching under conditions similar to those of the CESL process have reportedly resulted in complete leaching of

    Jan 1, 2012