Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Is Truck Queuing Productive?

    By P Malkin, S Thomas, P M. Stone, D Kostyuk

    In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource

    Nov 24, 2014

  • AUSIMM
    Return to Hillgrove

    By C Dell

    Hillgrove, situated on the New England plateau of New South Wales, is an area rich in history and resources. Key resources are predominantly antimony, gold and scheelite and the area surrounding the h

    Jan 1, 2008

  • AUSIMM
    Dredging fine tailings

    By S H. Burgmans, B Anderson

    This paper aims to define the specific challenges relating to dredging fine tailings from an above ground storage facility for transferral to a mined-out pit. In addition, it compares dredging and min

    Jul 1, 2021

  • AUSIMM
    Leading safely doesn’t only mean leading safety

    By A G. Guinea

    Every person in an organisation has what could be called ‘a different take’ on what it means to be a safety leader. The directors will tell you they are ultimately responsible for everyone’s safety an

    May 5, 2022

  • AUSIMM
    Earth Pressure Balanced Tunnelling in a Dense Urban Environment, C917A

    By G Jones

    The Singapore Land Transport Authority (LTA) has been procuring the expansion of their underground mass rapid transit rail network at a prodigious rate since the first line opened in 1987. Four lines

    Sep 17, 2014

  • AUSIMM
    Quality Sampling Using Coiled Tubing Drilling in Deep Mineral Exploration

    By V Rasouli, G Cavanough, A Mokaramian

    The sampling time, the costs and its quality are the three factors that determine the best method of drilling in mineral exploration. The two principal methods of reverse circulation (RC) and diamond

    Aug 21, 2012

  • AUSIMM
    Delineate Three-Dimensional Iron Ore Geology and Resource Models Using the Potential Field Method

    By A Guillen, J-P ChilFs

    Most 3D geological modelling tools were designed for the needs of the oil industry or detailed mine planning and are not suited to the variety of situations encountered in other application domains. M

    Jan 1, 2009

  • AUSIMM
    Regional scale structural influence on the Ernest Henry orebody below current mining levels

    By E Philippa, B Miller

    Material characterisation, ore sequencing and process capability are commonly regarded as the key parameters to consider in designing and operating an effective pit to plant supply chain. Therefore, a

    Mar 22, 2022

  • AUSIMM
    Understanding the causes of dilution in narrow vein stopes

    By S Thomas, S Ricketts, R Hassell

    Northern Star Resources (NSR) operates several operations utilising narrow vein stoping operations in the Kundana area. Stope dilution performance is variable across these operations, with unplanned d

    Mar 15, 2021

  • AUSIMM
    Development of an optical sorting algorithm to utilise digital images for the rapid discrimination of target minerals from gangue

    By E J. Y Koh, G J. McLachlan, E Amini, N Beaton

    Preconcentration greatly reduces the ore mass input to the processing plant while upgrading the grade. One of the commonly used methods of preconcentration is optical sorting. These methods rely on op

    Nov 10, 2020

  • AUSIMM
    Effectively Installing and Commissioning Flotation Equipment

    By B Murphy, J L. Heath

    Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th

    Sep 1, 2014

  • AUSIMM
    Meta incident analysis – an analysis of incident and near miss reporting within a major Australian commodity port

    By A Fern, A Hawkes, o, W Smith, K Mee

    Serious Injury and Fatality (SIF) prevention remains a priority focus within high-risk industries sector. A major mining operation sought to strengthen their approach to the management of high-risk ac

    Apr 16, 2024

  • AUSIMM
    Measuring circular economy through life cycle assessment – challenges and recommendations based on a study on recycling of Al dross, bottom ash and shavings

    By G Tranell, E Pastor-Vallés, A Vallejo-Olivares, J B. Pettersen

    Metals are essential for the sustainability transition and decarbonisation of society. Yet, it will be paramount to produce them sustainably and minimise the affiliated resource and energy use and the

    Aug 21, 2024

  • AUSIMM
    Seismic Design of Upstream-raised Tailings Storage Facilities in a Semi-arid, Low-seismicity Setting

    By D A. Williams, P J. Chapman

    Constructing upstream raises with tailings is an accepted and cost-effective practice in Western Australia, where the climatic conditions are favourable, desiccation (and hence overconsolidation) occu

    Jul 27, 2015

  • AUSIMM
    Mathematical Modelling of Heat Transfer in Flash-Smelting Burners

    By Taylor R. N

    Flow simulations have been performed on the flash-smelting burners currently used at KNS. This paper presents studies of the heat transfer between gas and particles at the burner exit. Gas and parti

    Jan 1, 1992

  • AUSIMM
    Longitudinal and Torsional Displacements of Winding Ropes

    Hoisting ropes are constructed of wires and strands positioned helically around the axis. This helical positioning causes that, in the rope loaded at the end with the weight Q, the longitudinal dis

    Jan 1, 1995

  • AUSIMM
    A Systems Approach for the Application of Eco-Efficiency Indicators for Process Design in the Minerals Industry

    By H von Blottnitz, J L. Broadhurst

    Eco-efficiency has been proposed by the World Business Council on Sustainable Development as an environmental performance indicator framework that contributes to sustainability by assisting corporate

    Jan 1, 2009

  • AUSIMM
    Situational 3D variography – determining the variogram in the context of geology

    By P Gleeson, J Coombes, P Suresh, T McLennan

    The last 20 years have seen a dramatic rise in the use of 3D visualisation and modelling for geological data, but there has been relatively little effort to do the same for the variogram models that u

    Sep 20, 2017

  • AUSIMM
    Managing remediation, and risk of failure, to complete extraction of a short life open pit

    By C E. Woolley, A Hosseini, J Foster

    Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m

    Jun 22, 2022

  • AUSIMM
    Trucking, Rail or Conveyor?

    By R B. Venugopal, P Staples

    The selection of the mode of transport for moving bulk materials is never a simple task as there are various concerns/considerations applied to the selection of the most practical and cost-effective m

    Jan 1, 2005