Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Developments in Geosciences for Overcoming the Constraints on High Production Underground MiningBy Hughson B
At present sane man-made Improvements and natural features are constraints on unlimited underground mining. 7 hey will continue to remain, as constraints on the future high production mining syste
Jan 1, 1988
-
Mining A 100 Million Tonne Orebody Without Subsidence (1eceb353-235c-4b84-8df9-2b3937c9c8f3)The major copper orebody at Mount Isa is being extracted at a rate of four million tonnes per year. The method used requires an equivalent rate of back filling with (mainly) cemented fill. There w
Jan 1, 1980
-
Woodlawn Mine - An Underground Operation ReviewWoodlawn Mines began underground operations in 1986. At the time of going underground it was envisaged that there would be no 'contract' payment to the underground employees. This was a re
Jan 1, 1995
-
Geological Structure of the West Area Pit, State Coal Mines, WonthaggiThis paper is written as a supplement to that of Edwards, Baker and Knight on "The Geology of the Wonthaggi Coalfield" 1, the West Area pit being in an early developmental stage at the time
Jan 1, 1953
-
Optimising Western Australia Magnetite Circuit DesignBy D David
The development of Western Australian magnetite deposits has lead to the design of some of the largest grinding mills and plants in the world. One of the projects demonstrates the efficiency gains po
Aug 8, 2011
-
The development of optimised pulp lifter design for the Ahafo SAG mill using discrete element method modellingBy E Asakpo, S Chaffer, A Heath
Newmont has had continuous production at their Ahafo operations, Ghana, since 2006. In 2013, Ahafo initiated an efficiency programme to improve mill performance and reduce energy consumption. Followin
Aug 29, 2018
-
Morwell Open Cut: Mine SchedulingBy Brimblecombe P
Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres
Jan 1, 1989
-
Introduction of Trackless Haulage at Long Shaft Kambalda Nickel OperationsBy Eyers G. C
Long Shaft was initially developed using a rail haulage system on every working level comprising battery electric locomotives and granby trucks loaded by rail mounted rocker shovels. Production wa
Jan 1, 1988
-
CSAMT Surveys, An Investigative Tool for Detailed Evaluation of Glass EarthÆs Epithermal Gold Targets in the Central Volcanic Region, North Island, New ZealandControlled Source Audio Magnetotelluric (CSAMT) surveys were carried out by Glass Earth (New Zealand) Limited (Glass Earth) in 2006 - 2007 to investigate epithermal gold targets in the central North I
Jan 1, 2007
-
Intragraben Fault Zones, Volcanism, and Geothermal Evolution in the Oregon-Idaho Graben, U.S.A. (cb62322a-c63b-484d-a72f-a99e158b5dcc)The Oregon-Idaho graben evolved after widespread Uwleiitic flood basalt volcanism associated with the arrival of the plume head of the Yellowstone hotspot beneath southeastern Oregon approximately 17
Jan 1, 1995
-
A Method of Predicting Open Cast Backfill Settlement as Applied to an Open Cast Coal Operation in the UKBy Denby B
The ever increasing demand on land use has led to large areas of land being considered for development, which because of past mining activities are covered by substantial depths of fill materials. T
Jan 1, 1995
-
Metalliferous Mining MethodsThis paper covers the key issues such as orebody geometry and grade, geotechnical data and metallurgical response. These must be considered in selecting a mining system for a new orebody. It then
Jan 1, 1997
-
Removal of Iron from BauxiteBy Gardner H. J, Wadsley m. W
Bauxite from the Weipa and Andoom (North Queensland) deposits was treated to provide a low-iron raw material for high- alumina refractories or aluminium chloride manufacture. The operation involved
Jan 1, 1979
-
The Discovery and Evaluation of the Windara Nickel Deposits, Western AustraliaBy Wright R, Stock E. C
The Windarra nickel deposits known to date comprise two sulphide orebodies located at Mount Windarra and South Windarra. These orebodies, which are 15 km apart, lie within an ultramafic complex at
Jan 1, 1973
-
The Use of Blasting Models for the Optimisation of Mine ProductivityBy Paine GG
In coal mining each of the unit operations are interrelated with each preceding operation having an effect on subsequent operations. This presents difficulties for determining when the lowest overa
Jan 1, 1987
-
Geology of Western Australian Tin DepositsWestern Australian tin deposits are similar to those of other Precam- brian terrains in that they are mainly associated with rare-metal pegmatites, in which cassiterite is found with minerals conta
Jan 1, 1973
-
A New Approach for Prediction of Blast Induced Coal FragmentationBy Thornton D, Esterle J, La Rosa D
Control of blast fragmentation has a significant impact on coal mine profitability. Two approaches for the characterisation of coal blastability, particularly in terms of fines, are presented. Both
Jan 1, 1998
-
Definition of Higher Grade Ore and Selective Mining Practices at Olympic DamBy Smith R. N
The Olympic Dam copper-uranium-gold-silver deposit is located approximately 520km north-northwest of Adelaide, South Australia. The deposit was discovered in 1975 by the Exploration Division of Wester
Jan 1, 1990
-
The Installation of a Final Cleaning Column at Ok TediBy Kilgour I
The installation of a final cleaning column at Ok Tedi Mining Limited was carried out to increase final concentrate grade in order to reduce concentrate handling, shipping and treatment charges and
Jan 1, 1991
-
The Upgrade of the Ore Haulage Facilities at Z.C. Mines, Broken HillA Feasibility Study to determine the future of ZC Mines was completed in mid 1987. Early in this study, which lasted two years, it was identified that significant reductions in treatment costs would r
Jan 1, 1988