Introduction of Trackless Haulage at Long Shaft Kambalda Nickel Operations

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 568 KB
- Publication Date:
- Jan 1, 1988
Abstract
Long Shaft was initially developed using a rail haulage system on every working level comprising battery electric locomotives and granby trucks loaded by rail mounted rocker shovels. Production was commenced using conventional hand held cut and fill mining methods. In an effort to improve productivity and reduce operating costs a mechanised cut and fill stoping method evolved to suit the wider sections of the orebody. To further improve productivity and reduce costs the mechanised levels of the mine are progressively being redeveloped to enable the use of trackless diesel haulage equipment. An added benefit of trackless haulage equipment will be the ability to place development mullock into stopes as Fill.
Citation
APA:
(1988) Introduction of Trackless Haulage at Long Shaft Kambalda Nickel OperationsMLA: Introduction of Trackless Haulage at Long Shaft Kambalda Nickel Operations. The Australasian Institute of Mining and Metallurgy, 1988.