Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Gravity Separation of Ultra-fine Iron Ore in the Reflux Classifier

    By J Zhou, D M. Hunter, S M. Iveson, K P. Galvin

    The recovery and concentration of ultra-fine iron ore can provide significant economic benefits. Presently, there are limited options available given the low settling rates achieved by conventional gr

    Jul 13, 2015

  • AUSIMM
    Truck Haulage Using Overhead Electrical Power to Conserve Diesel Fuel and Improve Haulage Economics

    By Brzezniak W

    Conversion to trolley assist is a means of minimizing diesel fuel consumption, which in many mining situations offers a rapid payback of capital investment plus the inherent flexi- bility and maneu

    Jan 1, 1981

  • AUSIMM
    Discovery, Exploration and Investigations of Phosphate Deposits in Queensland

    Broken Hill South Limited's discovery of phosphate deposits in the northwest of Queensland in 1966 prompted intensive exploration which has proved phosphate rock in excess of 2,000 million tons

    Jan 1, 1971

  • AUSIMM
    Weak Claystone Floors and their Implications to Pillar Design and Settlement

    By Gordon N

    The in situ behaviour of claystone floors associated with the Wallarah, Great Northern and Fassifem Seams has been studied using a comprehensive suite of stress and displacement monitors. The inst

    Jan 1, 1992

  • AUSIMM
    Development in Elevated Temperature Ground of the 500 Orebody Mount Isa Mines

    By T Davis

    The 500 orebody in the upper levels of Mt Isa Mines in north-west Queensland was mined by sublevel caving and block caving from 1962 to 1969. The hot and reactive rock mass of this orebody provided si

    Jan 1, 2008

  • AUSIMM
    The Melbourne Underground Rail Loop Overall Tasks and Organisation

    By Watson F. G

    As an introductory paper of a series on the Melbourne (Australia) Underground Rail Loop extension to the extensive electrified suburban railway system the paper outlines the need for the Loop, leg

    Jan 1, 1981

  • AUSIMM
    Direct Force Measurement for Bubble-Particle Detachment

    By R-H Yoon

    Increasing the upper particle size limit of flotation would allow operators to increase mill throughput, save operating costs, simplify flow sheets, and increase rate of return. However, coarse partic

    Jan 1, 2005

  • AUSIMM
    Percolation Leaching of Bornite Ore

    Up to 80 per cent of the copper in a bornite ore can be quickly leached with percolating acidified ferric sulphate solutions. The upper limit for rapid copper extraction is set by the conversion of bo

    Jan 1, 1973

  • AUSIMM
    Pulse Width Modulation Drives and Integrated Motors ù The Ideal Solution for Large Friction Winder Applications

    This paper examines the latest advances in mine drive and motor systems. In the last decade, the drive technology employed for large mine winders has migrated from the traditional dc technology to ac

    Jan 1, 2005

  • AUSIMM
    The Design and Construction of Intersection in Situ Tunnel Openings in the Murl Project

    The four major contracts for the construction of Museum Station are: 1) Installation of Soldier Piles, 2) Structural Contract including the temporary support, 3) Architectural Finishes which include

    Jan 1, 1981

  • AUSIMM
    Short description of the method of discharging and sampling ore received

    By T

    THE Sulphide Corporation's works for the smelting of ores containing lead, gold, and silver are situated close to the Cockle Creek railway station, on the main Northern railway line, and are abou

    Jan 1, 1918

  • AUSIMM
    Tugun Bypass Tunnel Using Top-Down Cut-and-Cover Method

    By M Thomas, S Lambert

    The Tugun Bypass Tunnel in Gold Coast, Australia was constructed using diaphragm walls with the top-down cut-and-cover method to allow simultaneous construction of an airport runway extension above th

    Jan 1, 2008

  • AUSIMM
    The Century Zinc-Lead Deposit, Northwest Queensland

    By Andrews S. J

    Century is a shale hosted zinc, lead, silver deposit developed within gently folded, Proterozoic Lawn Hill Formation shales and siltstones, approximately 250 kilometres north-northwest of Mount Isa, c

    Jan 1, 1993

  • AUSIMM
    Geotechnical Investigation of the South Wall, Mt Whaleback Pit a Case Study - How Goetechnology can Pay its Way

    By Parker RJ, Swindells CF

    The authors have used the geotechnical study for design of the South Wall of Mt. Newman Mining's Mt. Whaleback Mine to illustrate how geotechnical studies can be economically justified. This

    Jan 1, 1986

  • AUSIMM
    Utilisation of Readings Wet High Intensity Magnetic Separators at Richards Bay Minerals

    By James D, Dawson N

    The alternate mineral dressing tech-niques for the production of ilmenite roaster feed from heavy mineral concentrate and the reasons for the selection of wet high intensity magnetic separation (WHIMS

    Jan 1, 1986

  • AUSIMM
    Effect of oxygen on the interfacial phenomena and metal recovery rate in recycling process

    By Y-B Kang, J H. Park, J Park

    In order to understand the effect of oxygen injection into the molten metal on the valuable metals (VM) recovery and interfacial phenomena, several high-temperature experiments were conducted using a

    Aug 21, 2024

  • AUSIMM
    Submerged Combustion Technology* Applied to Copper Slag Treatment

    By Leahy GJ, Wright DJ, Player RI

    The operation of a one tonne submerged combustion pilot plant for the recovery of copper from anode furnace and converter slags is described and the effects of variables discussed. Using coal as r

    Jan 1, 1978

  • AUSIMM
    Comparison of Pyrotechnic and Electronic Initiation Systems at Whitehaven Coal Mine

    Sasol Roche Blasting Services (SRBS) has undertaken a process of trialing and evaluating the use of the SMI electronic initiating system with the specific purpose of being able to fully quantify the b

    Jan 1, 2003

  • AUSIMM
    Influence of Pack Design Upon Gateroad Deformation in Soft Floor Conditions

    By Payne AR

    The high cost of gateroad repairs and maintenance in U.K. longwall coalmining is a clear indication of the failure of permanent support systems to fulfill their prime function, i.e. control of str

    Jan 1, 1986

  • AUSIMM
    Shedding Light and Electrons on Altered Ilmenites and æLeucoxenesÆ

    By E Whiteman, L Reyneke, H Horsch

    Heavy mineral sand deposits are a source for the economically important element titanium, which is contained in minerals such as ilmenite and rutile. In heavy mineral deposits ilmenite displays variou

    Jan 1, 2008