Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Structure Monitoring During Underpinning

    By Barry C. Roth

    A Real Time Automated Remote Reading Electrolytic Tilt Monitoring System was effectively deployed for monitoring an existing five story brick building during underpinning, shoring and excavation opera

    Jan 1, 2007

  • DFI
    Unconventional Solutions For Construction Of A Hybrid Cut-Off Wall At The Dead Sea

    By Karsten Beekhaus, Sander W. Odijk, Rabea Bahlum, Mazin Adnan, Ayman Abdelh Al Nuaimat, Hassan Farhat

    The Arab Potash Company, APC, is one of the 10 largest potash producers of the world. The solar ponds at the Dead Sea, used for the enrichment of the salt content in the brine, are of crucial importan

    May 1, 2022

  • DFI
    Micropiles In Soft Florida Limestone

    By James D. Hussin

    The Florida limestone is a relatively soft rock which presents many challenges to engineers when designing deep foundations. One alternative is micropiles which have grown significantly from their ear

    Jan 1, 2003

  • DFI
    Construction Of The Main Tower Pier Caissons For The Greenville Bridge In Mississippi

    By F. Keith Jacobson

    To be involved in the construction of a deep dredged caisson for a major bridge pier is one of the most rewarding and professionally challenging experiences one can have in the bridge construction bus

    May 11, 2007

  • DFI
    Application of Special Geotechnical Construction Equipment at the Alaskan Way Viaduct Replacement Project

    By Richard Hanke, Franz-Werner Gerressen

    "The twin decked Alaskan Way Viaduct is a passage to Seattle’s downtown waterfront and of great economic importance to the city. In 2001, the Nisqually earthquake damaged the viaduct and led to the re

    Jan 1, 2015

  • DFI
    Newest Developments in Quality Control and Soil Mixing for Actual and Future Demands

    By Franz-Werner Gerressen

    "New developments are required day by day. On the one hand site to improve the actual situation, on the other hand site to create the future and to ensure that future demands can be fulfilled. This re

    Jan 1, 1900

  • DFI
    Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric Project

    By James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford

    "Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock

    Jan 1, 2017

  • DFI
    The Miniaturization Of Diaphragm Wall Technique – The Cube System

    By Leonhard Weixler, Alexander Blatt, Franz-Werner Gerressen

    Diaphragm wall technique is usually used to construct structural elements in the ground, commonly used for retention systems, permanent foundation elements or deep ground-water barriers, named Cut-Off

    Oct 1, 2022

  • DFI
    Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A Ramp

    By Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das

    Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r

    Sep 1, 2022

  • DFI
    Tension Testing of the Grouted Anchorage Assembly for Multistrand Anchors

    By Lucian L. Bogdan

    "SummaryActive loaded strand anchors are often used for slope stabilization, retaining walls or tiedown anchors. Normally, strands are tensioned against the structure and wedges are locked inside the

    Jan 1, 2005

  • DFI
    Post-Katrina Emergency Interim Flood Protection

    By Fred Fuchs

    "Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many

    Jan 1, 2008

  • DFI
    Jet Grouting at the West Toronto Diamond Grade Separation Project

    By Jim Bruce, Naresh Gurpersaud

    "The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co

    Jan 1, 2017

  • DFI
    Electronic Instrumentation in Support of Installation of Special Foundation Projects as Part of the Digital Future - Ensuring Safe Production and Improving Quality Control

    By Franz-Werner Gerressen

    New developments are required each day as our industry becomes more competitive. To improve performance, continue and to ensure future demands can be met. This requires the development of technical su

    Jan 1, 2019

  • DFI
    Cased CFA Pile – An Alternative Piling Method – A Chance for Technical and Economical Solutions

    By John R. Grillo, Gordian Ulrich, Franz-Werner Gerressen

    Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of t

    Jan 1, 2019

  • DFI
    Soil Mixing Treatment of Marginal Soil for Railway Construction and Maintenance (8f2b4a54-c8f3-43f2-a476-24a3cd46424e)

    By Charles M. Wilk

    "Mass stabilization involves mixing binding agents into marginal or contaminated soil to improve the subject material’s physical and/or chemical properties. This paper concentrates on the principles o

    Jan 1, 2015

  • DFI
    Rock Socket Friction In Drilled Shafts - Its Greater Than You Think - Summary.

    By Jorj O. Osterberg

    The practice of using side shear resistance in the design of drilled shafts socketed in rock is discussed. In the absence of field test data for the particular rock involved, the designer often neglec

    Jan 1, 1991

  • DFI
    Partnering for Cutoff Wall Project Success

    By Osvaldo Valdez, Matteo Bertoni, Aem Ragy

    The East St. Louis Deep Cutoff Wall project is located in the area of East St. Louis, Illinois, across the Mississippi River from the city of St. Louis, Missouri, along the left descending bank of the

    Sep 1, 2023

  • DFI
    Session 27 "Grouted Cutoffs"

    By Trent Dreese

    For critical velocities in gravel units we use Bush-Luckner, Sichardt, other empirical equations, and equations derived from laboratory experiments too. On the base of these, we compiled critical velo

    Feb 10, 2003

  • DFI
    Case History: Comparison of CSL Results to Physical Observations

    By David S. Graham, Paul J. Axtell

    Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b

    Jan 1, 2019

  • DFI
    London One New Change - Energy Piles® And Open Loop Wells Used For Ground Source Heating And Cooling

    By Peter Smith

    One New Change is a landmark retail / commercial development in the City of London. Integral to the structure is the three double storey basement from which the building is serviced. The building cons

    Jan 1, 2010