Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Development and Application of a Product Model for Shield TunnelsBy Nobuyoshi Yabuki
Building Information Modeling is a prevailing methodology in the building industry and half (by length) of the world's shield tunnels are in Japan. Accordingly, for shield tunnels from 2005 to 20
Aug 1, 2013
-
Renovation of the drainage system at Ineo's Pipe Open PitBy R. G. Achter, E. Wilson
"This paper describes the work undertaken to renovate the Pipe Open Pit drainage system, incorporating measures to improve effluent quality. It describes the technical feat of drilling an l l-inch-dia
Jan 1, 1980
-
The Development of Pan American Silver’s La Colorada ShaftBy Martin G. Wafforn, George J. Greer
"In early 2014, Pan American Silver Corp. commenced a project to construct a second shaft at its La Colorada underground mine located in Zacatecas State in Mexico. This was the first new shaft develop
Jan 1, 2019
-
Simulation of Drop-Weight Impact on Woven Composite LaminatesBy A. Gakwaya, P. Vachon-Joannette, P. Gagnon, J. Lévesque
"Predictive numerical methods are essential tools for reduced development cost and improved high performance designs of modern aircrafts. Their use leads to savings in terms of design cycle time and e
Jan 1, 2016
-
Project DevelopmentBy Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake
The business objectives of a metallurgical project determine targets and constraints, such as the range of products, production capacities, in-service dates, and capital and operating cost parameters.
Jan 1, 2015
-
Mid-Magnitude-Events: A Quantitative approach for run-out assessment taking fragmentation into accountBy K. Thuro, B. Sellmeier, M. Krautblatter
"Recent rockfall events, like the Tramin rockfall at January 21st, 2014, underline the significance of a comprehensive hazard assessment. A common way of estimating the hazard along infrastructure is
Jan 1, 2015
-
Thermal Fatigue in Rocks- La Roque-Gageac' Case StudyBy D. Virely, M. Gasc-Barbier, J. Guittard
"The valleys of the Dordogne and the Vézère (France) have been inhabited since prehistoric times, as evidenced by the famous site of Lascaux. A few miles away, the village of La Roque-Gageac is also a
Jan 1, 2015
-
Mississippi Valley-type Zn-Pb Mineralization in Northern Cornwallis Fold Belt ? Genetic Relationship between Ore-forming Fluids in Different OccurrencesBy Guoxiang Chi
The Cornwallis Fold Belt in the Canadian Arctic Archipelago contains numerous Mississippi Valley-type (MVT) Zn- Pb occurrences and the world-class Polaris deposit. The occurrences are mainly hosted by
May 1, 2001
-
Development and Improvement of Submerged Lance Converting and Refining Furnace of Fangyuan Two-Step ProcessBy Haibin Wang, Zhiwei Huang, Zhixiang Cui, Wenzhao Cui, Zhi Wang
Fangyuan Two-Step copper smelting process was commercialized in October, 2015 and has been operating for 3 years and 5 months. As the unique continuous copper smelting process with simplified flow in
Jan 1, 2019
-
Background Information on N.B. Reclamation ProjectBy B. B. Meadows
"The Minto-Chipman Strip Mining Reclamation Project was initiated to re-vegetate the spoil piles remaining from strip mining operations.All available information was studied by the team responsible, a
Jan 1, 1970
-
Design for SafetyBy Philip J. Bangerter, Chris Twigge-Molecey
Design for safety is critical to metallurgical plants, due to the inherently dangerous nature of their processes. Two significant areas of concern are: 1. preventing catastrophic process failures that
Jan 1, 2015
-
Development of Buzwagi Mine in Tanzania Feasibility Study, Permitting & Project ExecutionThe Buzwagi Project is owned by Barrick Gold Corporation and located in the Lake Victoria Goldfields of central Tanzania in the District of Kahama in the Region of Shinyanga. The property is 6 km Sou
May 1, 2009
-
Carbon Scout – Automating Carbon Measurement and Control in CIP/CIL CircuitsBy W. Lodge, G. Rasmussen
"The carbon-in-pulp (CIP) process has been the dominant gold recovery technology since the 1980s. During all this time carbon measurement, and control of the carbon transfer pumps has been largely man
Jan 1, 2018
-
Centrifuge model studies for backfill design at Westmin Resources Limited, H.W. MineBy R. J. Mitchell
"Centrifuge modelling of earth structures is a well-proven technique for evaluating the performance of prototype structures using physical models. The applications of this technique have increased dra
Jan 1, 1987
-
Continuous On-Stream X-Ray AnalysisThis paper comprises a description of on-stream analysis instrumentation, including sample handling, X-ray optics and data processing. It also includes a discussion of some typical applications of an
Jan 1, 1965
-
Desulfurization of Coarse Hemo-Ilmenite OreBy Patrice Nadeau, Yuejun Zhang, Dan Chen, Liming Huang, Claude Gagnon
"The traditional Denver flotation cell is generally suitable to process material ranging approximately from 5 µm to 300 µm. For floating over 300 µm material, its efficiency is significantly getting l
Jan 1, 2016
-
New Brunswick ? Last But Not LeastBy R. D. Brown
Ever since British Columbia started the ball rolling in 1974 with the introduction of its now-defunct Mineral Royalties Act, all Canada's resource-based provinces have significantly altered their
Jan 1, 1977
-
Evolution of Grade Control at Falconbridge Kidd Creek MineBy S. D. Tolgyesi
Kidd Creek Background ? Located in Northern Ontario, Canada ? Underground base metal mine ? Operating since 1966 ? Total of 125Mt mined to date (2.43% Cu, 6.60% Zn) ? Current plan at 2.4Mt/Y (657
May 1, 2003
-
The Gap Nickel Mine, Lancaster County, Pennsylvania and the American Nickel Works, Camden, New Jersey -- 1860 - 1890By D. Chadwick, J. W. Matousek
Between 1860 and 1890 -- from the time of the American Civil War to the last decade of the 19th Century -- nickel production in North America was dominated (even monopolized) by the output of the indu
Jan 1, 2005
-
Eskay Creek Flotation MillBy Garry Biles, Ken Major, Raj Anand
"Prime Resources Group Inc. (Prime) commenced the Eskay Creek Mine operations in 1994 in northern British Columbia. The ore from the underground mine is crushed and shipped to smelters in Japan and Ca
Jan 1, 1998