Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Quantifying the quality of cable bolt installation by acoustic testingBy M Hawkes, Z Ji Gang, Z Ming, R Hassell
As underground mines become more geotechnically challenging with increasing depth and excavation size, the requirement for ground support to be installed as per design becomes more critical. The verif
Mar 15, 2021
-
Organic Management Structure – Its Advantages in a Mining ConsultancyBy G Pitkin, D Sorley
The purpose of any consultancy is to provide a superior service for their client. Organisational structure is a key element in providing this service and differentiating between consultants.In an orga
Jun 22, 2016
-
Commissioning New Equipment in Continuously Operating PlantsOver the past 5 years, Bougainville Copper Limited has undertaken a number of major plant expansions to the copper concen- trate production plant at Bougainville in the North Solomons Province of P
Jan 1, 1986
-
Regional Drainage Geochemical Gold Exploration Techniques Used in Queensland, AustraliaBy Towsey C. A
Significant advances in regional geochemical exploration techniques have been made over the last 5 years in the search for gold deposits. This has occurred largely by the development of the bulk
Jan 1, 1989
-
Can the concept of the circular economy help unlock complex orebodies?By G Corder
The aim of the circular economy is to accelerate the transition from a conventional linear take-make-dispose economic model to a circular model. It is restorative and regenerative by design and aims
Nov 21, 2018
-
Process Alternatives to Recover High-Grade Iron Ore Concentrate from the Thickener Underflow Slimes of the Sishen Beneficiation PlantKumba Iron OreÆs Sishen Mine is one of the worldÆs largest iron ore mining operations situated in the Northern Cape, South Africa. It produces 29 million tonnes of iron ore products per annum using a
Jan 1, 2008
-
Geochemical Ore Guides and Techniques in Exploration for TinGeochemical data on Australian granites and pegmatites9 and the.,mineral.components of these rocks, is presented and compared with that obtained in similar studies in.the U.S.òS.R and:.elsewhere.The p
Jan 1, 1963
-
Treatment of Smelter Fume at the Electronic Refining and Smelting Company (ER&S), Port KemblaThe ER&S Company operates a copper sinter plant, blast furnace and converter smelting complex at Port Kembla. Eighty percent of the smelter feed is dirty copper concentrates that contain some lead
Jan 1, 1984
-
Power Resources on the Vatukoula Mining FieldThe Tavua Power Proprietary Ltd. was created in 1936 for the purpose of supplying electric power, compressed air and water to the mining field.The original share capital was subscribed on a two-third:
Jan 1, 1953
-
Arsenic Depression in the Flotation of Broken Hill Lead ConcentratesBy Quast K
A series of laboratory flotation tests were conducted to evaluate the effectiveness of various depressants as arsenic (and zinc) depressants in the lead cleaner stage of the NBHC mill at Broken Hill
Jan 1, 1991
-
No 3. Services and Surface AreaIn the general planning of this area, provision was made for the distribution over the whole area as required of the following services:(a) Power and lighting from the substation distribution boards &
Jan 1, 1957
-
The Effect of Process Variables on Electrowinningt Cadmium and SilverBy Watson K, Pollard D. M
The electrolytic recovery of metals from solution requires an understanding of the characteristics of the particular system employed, and the current efficiency and morphology of the deposit are in
Jan 1, 1989
-
On the Structural Fabric of Victoria and its Relationship to Metal DistributionThe structural pattern of Victoria shows the presence of EW, NW, NE as well as the more readily recognised NNW factors commonly associated with the goldfields. ENE and WNW trends are also present.
Jan 1, 1986
-
The Commissioning of No. 5 Blast Furnace at Port KemblaBy Warner R. E
Present capacity for molten iron production at Port Kembla is an average of 13 000 t/day from five blast furnaces. The most recently installed blast furnace, No.5, was commissioned in March 1972 wi
Jan 1, 1976
-
On the sources of complexity in contemporary and future mining projectsBy J Sykes, W Treasure, A Saleem, A Trench, S Ulrich, R S. Davies
Below-ground technical complexity remains a traditional source of project challenge. Above-ground challenges then augment this complexity, including in the domain of commodity marketing. All challenge
Nov 21, 2018
-
Sulfur loss from the slag during desulfurisation of liquid steelBy S Karosiya, A Sharma, M Jain, N N. Viswanathan, M M. Pande, D Kumar, S Kumar
Desulfurisation of steel during ladle refining is governed by both thermodynamics and kinetics. For effective desulfurisation, thermodynamically, a low partial pressure of oxygen at the steel-slag int
Aug 21, 2024
-
Particle Dissolution in the Chemical Regeneration of the Ceramic Filter Medium used for Magnetite DewateringBy B Ekberg, R Salmimies, T Kinnarinen, A HSkkinen
The regeneration of the ceramic filter medium used in iron ore dewatering is often done by combining backwashing, ultrasonic cleaning and chemical regeneration. Of these three, the first two are appli
Aug 12, 2013
-
Rediscovery and Development of the Kambalda-St Ives Gold DepositsBy Gresham J. J
The rapid and successful development by Western Mining Corporation Limited (WMC) of a gold mining industry based on the deposits of the Kambalda-St Ives group, was the final chapter in a story that
Jan 1, 1991
-
Technical Note on Identification and Removal of Stain from Zircon ConcentratesZircon is extensively used as moulding sand in the production of steel and high-duty iron castings. To achieve a satisfactory grade of zircon concentrate, the zircon particles may need ,to have surfac
Jan 1, 1975
-
The Development of No 2 Ore Shaft as a Surface Hoisting Shaft at Mount Isa Mines LimitedBy Onton W
During the latter part of 1936, conditions encountered in sinking the Main Ore shaft made it impractical and uneconomical to continue deepening it to serve haulage levels below the present No. 5
Jan 1, 1988