Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Application of an Integrated Liberation Leach Model for Process OptimisationBy T D. H McGrath, R Byleveld, W P. Staunton, J J. Eksteen
"The Gold Technology Group at Curtin University through the AMIRA P420 series of projects has recently developed the integrated liberation leach model (ILLM) for optimisation of gold plants. The model
Oct 10, 2016
-
Recent Shaft Development at BallaratBy Zeni J. T
Gold was mined from quartz bodies at Ballarat East from the 1850s until closure of the last mine in 1917. The average depth of mines was about 350 m.Ballarat Goldfields Limited (BGL) carried out diamo
Jan 1, 1992
-
A tailored solution to determine plant capacity using strategic analysisBy J Nortier, J Dray
There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi
Jun 22, 2022
-
Flotation in the Warrego Concentrator of Peko Mines Ltd.By Lynch AJ, Musgrove NH
The behaviour of chalcopyrite and pyrite in the rougher-scavenger and regrind-retreatment circuits in the Warrego concentrator is discussed. The effects of change in xanthate addition on the separ
Jan 1, 1975
-
Mining-Hydrological Characteristics of the Underground Copper Mine of Neves-Corvo, PortugalBy Real F, Carvalho P
During the development of the Neves-Corvo Underground Copper Mine, since 1981, inflow of water has been encountered in the mine workings, which consist of a ramp from surface 5 km long, a shaft 575
Jan 1, 1988
-
Planning for Access to the Deep Copper Orebodies at Mount Isa Mines LimitedBy Slater R
The initial planning and detail design phase leading to the development of a 7.5 m internal shaft to service the deep 3000 and 3500 copper orebodies at Mount Isa, Queensland is well advanced. The
Jan 1, 1982
-
Jameson Cell Test Work on Copper Streams in the Copper Concentrator of Mount Isa Mines LimitedBy Griffin PT, Espinosa-Gomez R, Jameson GJ
Two major issues are to be addressed in the Copper Concentrator of Mount Isa Mines Limited. The first of these is the need to increase concentrator flotation capacity to increase copper recovery, wh
Jan 1, 1993
-
Geoelectrochemical Exploration: Principles, Practice and PerformanceBy Haslam C. O, Los V. L, Abramson G. J
The technology applied by lonex Pty Ltd provides an important breakthrough in geochemical exploration, enabling the discovery of concealed mineral deposits to great depths below surface. Most minera
Jan 1, 1997
-
The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope DesignBy A Muhairini, M Eggers, J Smith, H Baxter
Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au
Jul 13, 2015
-
Sulfide Flotation at the Renison Tin Concentrator, TasmaniaBy Grano S. R, Kilgariff B
The Renisun Tin concentrator treats an ore containing I's per cent till as cassiterite and 22 per cent sulphur in a range of sulphide minerals. predominantly pyrrhotite. The sulphide minerals a
Jan 1, 1997
-
Roof Support of the Wongawilli SystemLegislation up to the early 1950s prevented the mechanical extraction of pillars. The mines operating at that time had formed extensive areas of pillars. When permission for the mechanical extractio
Jan 1, 1974
-
Strain-dependent Stiffness of the Weathered Melbourne FormationBy Z Terzic, M Schult, D Chu, S Macklin
The East West Link road tunnels are proposed to provide a connection between the CityLink toll road and the Eastern Freeway north of the Melbourne CBD. The alignment passes from Moonee Ponds valley be
Sep 17, 2014
-
Ore Quality Control for Process OptimisationBy Sehic O. A
Geology can be the root of evil or a source of bliss; there is a choice; to ignore geology is at a mine's peril.Risk can be minimised and profitability maximised by the application of a detailed
Jan 1, 1993
-
Construction of the Brunswick Street Rail TunnelsThe paper, one of two papers on the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling conference, describes documentation, tendering and construction aspects.Ten
Jan 1, 1993
-
ICP Analysis In Geochemical Prospecting-1In the late 1970's Western Mining Corporation, Exploration Division considered the purchase of a major multi-element spectrometer as an adjunct to our existing atomic absorption spectrophotom
Jan 1, 1987
-
Nickel and Cobalt Losses During Dissolution and Oxidation of Iron Powder in Ammoniacal Medium Using Oxygen over PressuresBy Rath M. C, Das R. P
Studies were carried out on dissolution and oxidation of iron powder in ammonia-ammonium carbonate solution using oxygen over pressures. Cobalt and nickel losses during iron oxidation under differen
Jan 1, 1992
-
Hydrogeological Investigations and Ground Treatment for Shaft Sinking at Asfordby New MineBy Jeffery RI, Pollard CA, Fear NJ
The paper describes the detailed hydrogeological studies carried out prior to the sinking of twin shafts at British Coal's new mine at Asfordby, Leicestershire, UK. The test methods for assessi
Jan 1, 1988
-
Improving crusher throughput using a problematic ore index based on simple, first principles geologyBy T Walton, C Perring, M Pepper, G Gerber
The Yandicoogina Channel Iron Deposit (CID) is an accumulation of iron pisolites cemented by a goethite-rich matrix. The Yandicoogina CID’s are found in a palaeochannel that meanders within a broad st
Mar 22, 2022
-
Design and Ground Support Monitoring of the Brunswick Street Rail Tunnels, BrisbaneBy Baxter D. A
This paper, one of two written about the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling Conference, 1993, describes the design and monitoring aspects of the r
Jan 1, 1993
-
Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer ProjectsBy N Lewis
Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying
Mar 8, 2011