Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Laboratory Experiments to Quantify the Pull-Out Strength of Single Strand Cable Bolts for Large Boreholes

    In high stress mining environments, production drill rigs are often employed for rapid drilling of boreholes for systematic cable bolting. One outcome of this drilling method is the need for larger bo

    Nov 25, 2010

  • AUSIMM
    The Weipa Kaolin Project (37afd6f9-e7cd-4419-b3aa-f6892748e3dc)

    Comalco Limited has recently completed construction of a $50 million kaolin plant at the site of its bauxite mining and industrial minerals operations at Weipa. The plant will produce 100,000 tonnes p

    Jan 1, 1988

  • AUSIMM
    Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade

    "Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even

    Mar 8, 2016

  • AUSIMM
    The Distribution of Pathfinder Elements in Soils at the Favona Deposit, Waihi Region, New Zealand

    By J L. Mauk

    The Favona adularia-sericite epithermal Au-Ag deposit is located at the southern end of the Hauraki Goldfield, about one kilometre southeast of the world-class Martha deposit. The deposit occurs in La

    Jan 1, 2007

  • AUSIMM
    Getting Accurate Mine Information to the Right Teams to Drive Production Improvement

    By T Elms, R Beckman, M Sampson

    "In today’s mining industry, the pressure of reducing costs and increasing production while maintaining high safety standards is at the forefront of operational endeavours. A combination of specific m

    Nov 15, 2016

  • AUSIMM
    Remnants of Ancient Australia in Vanuatu – Implications for South-west Pacific Tectonics and Mineralisation Potential

    By S W. Richards, J Buys

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Magmatic arcs are prime targets for porphyry- and epithermal-style mineral deposits, althou

    Mar 18, 2015

  • AUSIMM
    The Impact of Residence Time on Copper Recovery in Telfer Gold MineÆs Cyanide Recycling Process

    By P Breuer, A Simons

    The sulfidisation, acidification, recycle and thickening (SART) process is currently being used at NewcrestÆs Telfer Gold Mine to recover cyanide and copper from the cyanidation tails of the pyrite co

    Sep 26, 2013

  • AUSIMM
    Modelling of Iron Ore in Materials Handling Applications with a Focus on Wear

    By T Krull, T J. Donohue, D Ilic

    "Problematic issues in materials handling applications are often amplified in the iron ore industry due to the relatively high density of the ore as well as the abrasive nature of the product. One of

    Aug 12, 2013

  • AUSIMM
    Freeport's Fourth Concentrator-A Large Step Towards the 21st Century

    By Napitupulu P

    PT Freeport Indonesia currently operates a concentrating complex capable of milling 127 000 metric tonnes per day of copper and gold hearing ore. The facilities consist of both a conventional crushi

    Jan 1, 1997

  • AUSIMM
    Liability of Technical Professionals in the Mining Industry - The Lawyers' Perspective

    By Low Russell

    Mark Westfield, writing in The Australian on 16 May 1994 stated: The role of the independent expert is crucial to Australia's investment system. When it falls down, there can be very dramatic

    Jan 1, 1995

  • AUSIMM
    How progressive waste rejection should transform your mining business

    By M Pyle, R Ch, T Vizcarra, ramohan, G Lane, G Ballantyne

    Preconcentration, through gravity separation (Wallace et al, 2015), magnetic separation and particle size (Clout, 2013), has been used in many historical projects to convert low grade material into or

    Nov 10, 2020

  • AUSIMM
    Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?

    By E J. Cowan

    Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore

    Aug 22, 2011

  • AUSIMM
    Efficiency of the Detritor Mills at Zinifex Century Mine

    By D P. Obeng, L Reemeyer, R Holmes

    The Zinifex Century Mine employs a large number of Detritor mills for fine and ultra-fine grinding to liberate silica and sphalerite at 80 per cent passing 7.5 microns before final zinc flotation. A j

    Jan 1, 2007

  • AUSIMM
    Fluid Bed Roasting at Mount ISA

    By Casley G. E, Pritchard J

    A single slurry fed fluosolids roaster was chosen to replace six multiple hearth roasters in the Copper Smelter at Mount Isa as part of the overall program to increase production from 100 000 to 15

    Jan 1, 1974

  • AUSIMM
  • AUSIMM
    Is Every Mine a Pilot?

    By G I. Lumley

    ‘Every mine is a pilot’ is an attitude which encourages the mining paradox of optimistic mine plans and equipment under performance; propped up by an environment lacking accountability. The premise th

    Jun 22, 2016

  • AUSIMM
    Longhole Open Stoping Practice in 'B' Lode at New Broken Hill Consolidated Limited

    Longhole open stoping was introduced in the zinc-rich 'B' lode at New Broken Hill Consolidated Limited (NBHC) during 1968. Since then one longitud- inal and a series of transverse longhole

    Jan 1, 1971

  • AUSIMM
    A Three-Dimensional Model of MuckpileFormation and Grade Boundary Movement in Open Pit Blasting

    By Kavetsky A

    In surface mining operations, the ease with which a muckpile may be dug is a dominant factor in mining efficiency. Within broad limits, this is largely dependent on muckpile shape and looseness with

    Jan 1, 1989

  • AUSIMM
    Monitoring of the Performance of a Crushed Waste/Classified Tailings Backfill for Shaft Pillar Pre-Extraction in the South Deep Section, Western Areas Gold Mine (277410f0-6562-47cc-84ec-f0b4e2938751)

    By James JV, Petho SZ

    The South Deep surface shaft system is being sunk to a final depth of 2750 in below surface and on completion will be the deepest single drop haft in the world. The shafts will intersect the target

    Jan 1, 1998

  • AUSIMM
    The Kinetics of the HDO-H2 Isotope Exchange Reaction on Liquid Silica-Saturated Iron Silicates

    By Belton G. R

    The kinetics of the interfacial reaction of H2O on liquid silica-saturated iron silicates has been studied by means of measurement of the HDO-H2 isotope exchange reaction. The apparent first order

    Jan 1, 1987