Search Documents

  • AUSIMM
    The Optimisation Tools for Open Pit Strategic Planning

    By Y Ren

    ?ptim?sgtion t?ols nos ope? 0iu ?ingc s?ch as the cche??ling and?pi? k?(i?isatTon tool{ ?ave bg?ome(?osd-dvfective way? to e?iluata open`¦it mi~e!p?n?ept as w?ll asá?}prmv?ng mine?projecW`value> ?ower

    Aug 12, 2013

  • DFI
    Establishement Of Bearing Capacity And Integrity Of Cast-In-Place Piles By Means Of Dynamic Pile Tests ? Synopsis

    By H. Meseck

    Dynamic pile test methods to establish the bearing capacity of driven piles were developed in the USA more than 20 years ago. In the Federal Republic of Germany, the first dynamic pile tests were carr

    Jan 1, 2010

  • SAIMM
    A model for economic accumulation of zircon, northern KwaZulu-Natal

    By R. Armstrong, C. Ware, P. Sudan, G. Whitmore

    The northern KwaZulu-Natal (KZN) coastal dune cordon, South Africa, extends from north of Durban into Mozambique. The Quaternary dune cordon, which can be up to 2 km wide, comprises a series of stacke

    Jan 1, 2003

  • SME-ICGCM
    Study Of Coal Fragmentation Under Conical Bit Indentation (151fd177-8c94-4b7d-bb78-001df228dd2a)

    By S. J. Jung

    A fundamental study of fragment size distribution and characteristics of fracture pattern is presented for the dynamic penetration of a conical bit into coal block. In this paper, damaged zones during

    Jan 1, 1989

  • SME
    Final Tunnel Liner at Mill Creek 3 Project - Case Study

    By M. Schafer

    The 20 foot diameter cast-in-place tunnel lining for Phase 3 of the Mill Creek Tunnel (MCT-3) has been completed. This paper will summarize aspects of liner design and address the construction approac

    Jan 1, 2008

  • SME
    Urban Resource Issues: Construction Aggregate Assessment

    By M. Rice, M. Stanley, J. Marlow

    Arizona construction aggregate industry remains in the crosshairs of public debate, caught between the need for aggregate-based building materials and alternative, high-value land-uses. To better mana

    Jan 1, 2002

  • CIM
    Safe Rapid Drifting - Support Selection

    By Fidelis T. Suorineni

    Rapid drifting enables quicker access to orebodies, higher production rates and a resultant reduction in production cost. The Mining Innovation, Rehabilitation and Applied Research Corporation (MIRARC

    May 1, 2004

  • NIOSH
    RI 9597 - Reactivity Studies During Drying and Relocation of Lead-Zinc-Gold Tailings - Phase 1: Preliminary Evaluation and Laboratory Testing

    By L. J. Froisland

    The U.S. Bureau of Reclamation requested U.S. Bureau of Mines (USBM) assistance in developing design data for moving lead-zinc-gold tailings from their current location without disrupting the existing

    Jan 1, 2010

  • SAIMM
    The Development And Implementation Of The Lonmin Mechanized Breast Mining

    By K. Moxham, R. G. B. Pickering

    Over the last few years Lonmin Platinum and Sandvik have embarked on a unique partnership of collaboration through a systematic approach to developing equipment to mechanize and automate narrow reef p

    Jan 1, 2006

  • NIOSH
    RI 4189 Cle Elum Iron-Nicke Deposits Kittitas Co., WA

    By S. W. Zoldok

    "ERRATUMFor paragraph 1, page 1, read the following:The Cle Elum nickeliferous iron deposits occur on an unconformable contact between the serpentine and overlying Swauk sandstone formation and extend

    Feb 1, 1948

  • SME
    How the Global Experience and Reach of Tunnelling’s True Multi-Nationals Helped Solve a Difficult Road Tunnel Fit-Out Challenge

    By Simon Strong, Tim Brown, Luis Ignacio Sanz Vivanco

    "One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the pre-stressed preca

    Jan 1, 2016

  • IOM3
    Method for incorporation of shape characterization into cone crusher model

    By A. C. Apling, N. B. Barrett

    Roadstone production requires the generation of non-flaky material, as outlined in British Standard 812 section 105.1; with respect to this criterion, a mathematical model of a cone crusher must be ab

    Apr 1, 1995

  • NIOSH
    OFR-162(2)-81 Interactive Mine-Power-System Analysis - User's Manual

    By Richard A. Rivell

    This document is a users manual intended as a reference for personnel interested in the analysis of coal-mine-electrical-power systems under either normal operating conditions or fault situations. The

    Jan 1, 1980

  • NIOSH
    IC 8832 Automatic Fire Protection Systems For Surface Mining Equipment

    By William H. Pomroy

    Fire on surface mining equipment is a serious hazard to life and property. The Bureau of Mines, through a program of contract and in-house research, has developed and in-mine demonstrated reasonably p

    Jan 1, 1980

  • DFI
    Slurry Wall Design For Hong Kong Station

    By Stephen T. Young

    The construction of Phase 2 of Hong Kong Station, its retail podium and International Finance Centre Two, the tallest building in Hong Kong, will be completed in the middle of 2003. This paper describ

    Jan 1, 2003

  • CIM
    Mocca: A Grinding Circuit Control Application

    By C. Larsen, D. Fragomeni, A. Vien, D. G. Fisher

    "MOCCA is a Multivariable Optimal Constrained Control Algorithm developed specifically for non-square industrial control applications with practical difficulties such as interactions, time delays, con

    Jan 1, 1991

  • AUSIMM
    CRIMM - A New Process for Production of Directly Reduced Iron with Coal-Based Rotary Kiln

    By Sheng-Hui X

    This paper introduces a new coal-based rotary kiln process of DRI production - the CRIMM process, which is developed by Changsha Research Institute of Mining and Metallurgy in the past years. Its ma

    Jan 1, 1999

  • SME-ICGCM
    CISPM-MS: A Tool to Predict Surface Subsidence and to Study Interactions Associated with Multi?Seam Mining Operations

    By Yi Luo

    Multiple-seam mining operations induce surface subsidence basins different from those caused by mining in a single coal seam, and also disturb the mining operations in the other coal seams. A computer

    Jan 1, 2012

  • SME-ICGCM
    Geomechanical Support Of Adaptive Mining Technology

    By I. V. Baklashov

    Geomechanical conditions of mining operation are determined by varying in time and space mechanical properties and initial state of the rock mass, by geological and technological factors. We define ad

    Jan 1, 1996

  • NIOSH
    Bulletin 228 Estimation of Underground Oil reserves by Oil Well Production Curves

    By WILLARD W. CUTLER

    This bulletin reviews, in the light of recent experience, the use of production-decline curves in estimating the future production of oil from wells. It deals with the estimation of the reserves of re

    Jan 1, 1924