How the Global Experience and Reach of Tunnelling’s True Multi-Nationals Helped Solve a Difficult Road Tunnel Fit-Out Challenge

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 1359 KB
- Publication Date:
- Jan 1, 2016
Abstract
"One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the pre-stressed precast concrete slabs to form the smoke duct in the tunnel boring machine (TBM) tunnels. An essential part of the tunnel ventilation system, the smoke duct, extends the full length of the 4.6km long twin, two lane tunnels. The vast majority of the tunnels (approx. 4.3km) were constructed using two 12.4m diameter double shield TBMs. The refurbished Herrenknecht machines broke several world records on the way to completing the tunnel excavation works in just over nine months. With the excavation complete the focus turned to solving the complex civil tunnel fit out challenges. A key component of the civil fit out of the tunnels was constructing the smoke duct in the TBM tunnels which was designed as a precast solution. The slabs which each measure 8.62m long by 2.0m wide by 200mm thick and weigh close to 9 tonne need to be erected above cast in situ corbels whilst other tunnel finishing works continue. The space proofing clearance offered by the design to the support corbels below and the precast segmental lining above was in the order of only 100mm. This paper details the events of how the Transcity JV tunnel fit out team, comprising some of Europe and Australia’s leading tunnel construction specialists, drew upon the global strengths of the existing JV member companies and the global reach of leading TBM manufacturer Herrenknecht to develop an innovative system to solve this challenging problem. This globetrotting story, which starts in Australia, visits Europe and mainland China before returning to Brisbane where it all began."
Citation
APA:
(2016) How the Global Experience and Reach of Tunnelling’s True Multi-Nationals Helped Solve a Difficult Road Tunnel Fit-Out ChallengeMLA: How the Global Experience and Reach of Tunnelling’s True Multi-Nationals Helped Solve a Difficult Road Tunnel Fit-Out Challenge. Society for Mining, Metallurgy & Exploration, 2016.