Search Documents

  • SME
    Bacís Flotation Cell For Gold- And Silver-Beard Pyrite Recovery

    By J. R. Parga

    In mineral processing, poor froth-flotation performance translates into both an enormous loss of revenue and an unnecessary waste of the ore reserve. In this context, Bacís Mining Company developed a

    Jan 1, 2009

  • AUSIMM
    Thermodynamic and Phase Diagram of the Lead-Lead Sulphide Binary System

    The published liquidus data on the Pb-PbS system have been correlated on the basis of one-coefficient Margules equations. Thermodynamic properties of the components of this system have been obtained,

    Jan 1, 1972

  • SAIMM
    The Development Of The Voskhod Chrome Project In Kazakhstan

    By A. J. Van Der Merwe, N. A. Barcza, M. Boyes, N. R. Clarke

    Oriel Resources has with the support of SRK (Cardiff) and DRA and Mintek (South Africa) carried our a Definitive Feasibility Study (DFS) to recover high grade chrome ore from its Voskhod deposit very

    Jan 1, 2007

  • AUSIMM
    The Round Hill Gold-Scheelite Deposit, Macraes Flat, Otago, New Zealand

    The Round Hill gold-scheelite deposit is located three kilometres from Macraes Flat and approximately 60 kilometres due north of Dunedin, New Zealand. A mining feasibility study is currently being und

    Jan 1, 1987

  • SME
    Caterpillar With Tunnel Boom Boosts Productivity On Swiss Project

    A dedicated tunnel construction version of the Caterpillar 328D LCR compact radius excavator is proving highly productive on the A9 Autoroute construction project near Visp, in Switzerland. It is the

    Jan 1, 2009

  • AUSIMM
    Presidential Address, 1970 Men for Minerals

    This evening I would like to speak about men for the mineral industry.It is trite to say that the mining industry is expanding rapidly and that technically trained men are in short supply. How short i

    Jan 1, 1970

  • ISEE
    Proposed Draft of the ISEE Seismograph Performance Specifications and General Guidelines for Seismograph Field Use (23551c26-fab0-471e-a564-2605bfe7a483)

    By Richard R. Brochu

    At the International Society ofExplosives Engineers Annual Conference held in Nashville, Tennessee in February 1995, a Seismograph Standards Committee was established. The purpose of this wmmittee was

    Jan 1, 1998

  • SAIMM
    Analysis of rock avalanches generated by large planar rock slides by means of numerical methods for discontinua

    By R. Ribacchi, P. Tommasi, C. Consorti, P. Campedel

    The runout of dry blocky rock avalanches produced by planar rockslides affecting a limestone formation with clayey interbeds is analysed by means of distinct element modelling. Numerical analyses are

    Jan 1, 2003

  • IOM3
    Knowledge-based system for condition monitoring of cone crushers

    By I. D. Nock, R. M. Parkin

    Paper presented at a meeting on: Artificial intelligence in the minerals sector, held in Nottingham, UK, 20 April 1993 (original title: Knowledge-based condition monitoring of cone crushers). A large

    Apr 1, 1994

  • AUSIMM
    Seismic Interpretation Problems Caused by Miocene Channels in the Central Part of the Gippsland Basin

    By Cadman S. J

    ( The central part of the Gippsland Basin is surrounded by existing major Petroleum accumulations and although six exploration wells have been drilled in the area, none are significant petroleum dis

    Jan 1, 1992

  • SME-ICGCM
    Identification Of Factors Affecting Horizontal Displacement In Subsidence Process

    By Yi Luo

    In the study of the topographical effects on surface movement due to underground longwall mining, the factors that affect the incremental horizontal displacements are identified using 10 collected cas

    Jan 1, 1996

  • CIM
    Architecture of Gold Mineralization at Anomaly A of the Clarence Stream Deposits, Southern New Brunswick

    By A. J. Hynes, Lutes. G. G., Ravenelle. J. -F.

    "The Anomaly A area of the Clarence Stream gold deposits in southwestern New Brunswick contains mineralized structures that bear geometrical relationships to regional folding events. The four minerali

    Jan 1, 2008

  • AUSIMM
    Multi and Synchroblasting – maximising operational productivity

    By G Wyartt

    Systems such as Davey Bickford’s Daveytronic® SP blast initiation system and electronic detonators have been an integral part of drill and blast activities in Australia for over a decade, with th

    Jul 24, 2017

  • AUSIMM
    The Flow of Slurries at Suction Pipe Inlets

    The material presented in this paper describes experimental work to determine the effect of variations in suction nozzle design upon inlet flow conditions. Four entrance profile shapes were examined u

    Jan 1, 1966

  • SME-ICGCM
    Ground Control and the Inundation of the Retsof Mine

    By Vincent A. Scovazzo

    On March 12, 1994, the 1,100-foot deep 2 Yard South panel of the 1l0 year-old Retsof Mine collapsed. At the time of this occurrence, the Retsof Mine was characterized as the world's largest, most

    Jan 1, 1997

  • CIM
    Minage des zones étroites à la Mine Bousquet

    By Paul Gauthier

    Aujourd?hui, avec un faible prix de l?or sur le marché, les opérateurs miniers doivent revoir leur façon de faire. La méthode de minage «Eureka» permet de réduire les coûts de production et d?accélére

    Oct 1, 2001

  • CIM
    Stuck in Traffic and Boiling Over - Why project-level thinking can?t fix portfolio-level problems

    By Stuart Elliot

    Brownfield project portfolios are notoriously hard to manage. Day to day there is a constant stream of changes and challenges within projects and across the whole program. When the budget year is over

    Nov 1, 2011

  • CIM
    Namew Lake Mill Project

    By K. Hoover, G. Labarre, S. Rantanen

    "As part of the Namew Lake project a mill was constructed to treat 1900 tpd of ore grading approximately 0.90% CU and 2.45% Ni to produce copper and nickel concentrates.Nickel occurs mainly as pentlan

    Jan 1, 1990

  • CIM
    Mill Modernization Program at Noranda Minerals Inc. Geco Division

    By L. S. Urbanoski

    This presentation describes a major modernization project at the Geco concentrator. The objectives of the program were to replace obsolete flotation equipment and upgrade process controls.Noranda Mine

    Jan 1, 1987

  • SME-ICGCM
    Determination Of Horizontal Stress Direction By Underground Mine Mapping (2f4eaf66-10ce-4f4d-9f7a-64c6c21e6400)

    By S. E. Phillipson

    Underground mine mapping is a critical component of understanding the controls on ground instability. Many relatively localized examples of ground failure are associated with geologic features, such

    Jan 1, 2009