Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Development and Evaluation of a UWB‑Based Indoor Positioning System for Underground Mine Environments - Mining, Metallurgy & Exploration (2023)

    By AMIR EHSAN KIANFAR, Moritz Ziegler, TOBIAS HARTMANN, ELISABETH CLAUSEN

    Accurate positioning information is a central step in the process of increasing automation and digitalization in the mining industry. Underground mine environments are prime examples for GNSS-denied e

    Jul 7, 2023

  • SME
    Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,

    Jun 13, 2021

  • SME
    Construction And Geological Engineering Of An Underground Ore Bin

    By J. F. T. Agapito, G. P. Bratton

    A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos

    Jan 1, 1985

  • SME
    The Upper Pennsylvanian Pittsburgh Coal Bed: Geology And Mine Models

    By L. F. Ruppert, W. D. Watson, S. J. Tewalt, L. J. Bragg

    The U.S. Geological Survey recently completed a digital coal resource assessment model of the Upper Pennsylvanian Pittsburgh coal bed which indicates that of the original 34 billion short tons [31 bil

    Jan 1, 2000

  • SME
    Evaluation Of Sulfidic Mine Tailings Solidified/Stabilized With Cement Kiln Dust And Fly Ash To Control Acid Mine Drainage

    By M. Nehdi

    Deficient surface disposal systems of sulfidic mine waste often cause severe contamination of surface streams and groundwater reservoirs due to the oxidation of sulfide phases. The subsequent generati

    Jan 1, 2008

  • SME
    Kárahnjúkar Hydroelectric Project, Iceland Extreme Underground Construction

    By Bernhard Leist, William D. Leech, Johann Kröyer, Holger Evers

    Landsvirkjun—the national electric power company of Iceland—is building the Kárahnjúkar Hydroelectric Project in eastern Iceland. Two glacial river systems will be dammed and channeled through a serie

    Jan 1, 2007

  • SME
    Mine Preplanning

    By Christopher J. Bise

    INTRODUCTION Before a mine is planned in detail, a preliminary analysis is often conducted. This preplanning permits the mining engineer to make a rapid assessment as to whether or not a particula

    Jan 1, 1986

  • SME
    Horizontal directional drilling implementation at MIMOSA Mines

    By M. Santillan

    Minerales Monclova S.A. de C.V. (MIMOSA) has applied different methane gas drainage technologies, according to the top industry requirements in order to keep the methane gas at the lowest possible con

    Jan 1, 2009

  • SME
    Suspension Of Apatite Particles In A Self-Aerated Denver Laboratory Flotation Cell

    By O. A. Lima

    Effective solids suspension is a necessary precondition for particle collection, and solids suspension is largely dependent on the hydrodynamics of the flotation cell. This study attempted to correlat

    Jan 1, 2009

  • SME
    The Potential Of GPS Guidance In The Mining Industry

    Recent advances in GPS, machine guidance technology and telemetry allow an unprecedented level of control of surface mining operations. GPS technology can now locate the bucket of a shovel or the blad

    Jan 1, 2004

  • SME
    Mining Lawyers Meet, Mark a Half Century of Work

    By Tim O’Neil

    Question: Looking forward, do we face a future in which energy markets, energy policy and energy conflicts threaten to preoccupy, if not dominate, our concerns over economic growth, national security

    Jan 1, 2004

  • SME
    Case Study in Rock Mass Behavior: TBM versus Drill and Blast

    By Scott Chesman

    Increased TBM performance is leading the way for resurgence in tunneling activity in NYC. Tunnels will be excavated in the same geologic formations as previously excavated D&B tunnels whose constructi

    Jan 1, 2005

  • SME
    Operation of large underground fans at Kidd Mine ? progressing through the challenges

    Kidd Mine in Northern Ontario is now producing from Stage 1 of the Mine D expansion project ? mining between 2100 m and 2700 m below surface. Planning for Stage 2 of the Mine D project is already well

    Jan 1, 2009

  • SME
    Exploration: Both a Boom and Bust Year - 1980 Annual Review

    By Paul Russell, M. M. Kimberley, Erick F. Welland, Louis Cope, C. C. Mosher, William M. Shepard, William C. Larson, Graham Closs

    Exploration activities in 1980 felt the effects of unstable economic conditions and oscillating metal prices. In the cyclical, boom-or-bust precious metals and uranium markets, precious metals activit

    Jan 5, 1981

  • SME
    Cone Beam X-Ray Microtomography – A New Facility For 3d Analysis Of Multiphase Materials

    By J. D. Miller, C. L. Lin

    As the techniques and resolution for 3-D spatial analysis have advanced in the last decade, it is now possible to map in detail the microstructure of multiphase materials in three-dimensional digital

    Jan 1, 2001

  • SME
    Binding Iron Ore Pellets With Fly-Ash – Preprint 97-105

    By D. D. Banerjee, S. K. Kawatra, T. C. Eisele

    A high calcium fluid-bed combustor ash has been shown to be an effective binder at dosages of 1 to 2% of the magnetite concentrate weight. Magnetite pellets 1.3 cm (1/2 inch) in diameter were produced

    Feb 24, 1997

  • SME
    Members See the Latest in Technology at SME Exhibit

    By Georgene Renner, William R. Yernberg, Steve Kral

    ABB provides integrated pro-cess control, optimization and information systems, drives and power-distribution equipment as well as other services and support to the mining industry. ABB also supplies

    Jan 1, 2004

  • SME
    Truth, Judgement, Responsibility, Integrity, Conflict And Resolution In Exploration And Heavy Construction

    By Peter J. Tarkoy

    A great deal of attention has been directed toward the complexities and inadequacies of exploration and pre-bid geotechnical information for heavy construction projects, differing site conditions, and

    Jan 1, 1983

  • SME
    Numerical Analyses Of Stability Of Three-Way And Four-Way Coal Mine Intersections In Illinois

    Roof falls in coal mines typically occur in or around intersections and this has not changed in the last two decades. This research develops an improved scientific understanding of stress distribution

    Feb 27, 2013

  • SME
    Producing a GIS Based Multi Attribute Decision Making for Social and Environmental Sustainability Assessment in a Copper Mine in Iran

    By B. Farshadi, B. Asi, M. J. Habibian

    "Dare-Zereshk deposit is one of the deposits supplies ore for Taft copper Complex in Iran Yazd province. This deposit is situated underneath a village the same name. Prior to mining activities, the vi

    Jan 1, 2011