The effect of slimes content on the rougher spiral circuit in a heavy mineral sands operationBy R. Abela
Heavy mineral sands are usually beneficiated in a spiral concentrator circuit prior to separation of heavy minerals into streams of zircon, rutile and ilmenite. The performance of the spiral concentra
Jan 1, 2003
-
A New Underground Auger Mining SystemBy I. L. Follington
This paper describes the research and development programme to develop a prototype underground auger mining system aimed at developing and demonstrating an underground auger mining system able to prov
Jan 1, 2001
-
Heat capacity measurement of molten NaNO3-NaNO2-KNO3by drop calorimetryBy M. Kawakami, K. Suzuki, T. Takenaka, S. Yokoyama
Molten NaNO3-NaNO2-KNO3mixture is used as a heat transfer medium at high temperature. One of the most important properties of this mixture is the heat capacity. In the present work, the enthalpy chang
Jan 1, 2004
-
Friction Hydro Pillar Process As An Alternative Repair Technology For Creep Evaluation Sites On Thick-Walled 10CrMo910 Creep-Resistant Steel Structures ? SynopsisBy D. L. H. Bulbring
The removal of a cylindrical core from thick-wall sections for creep analysis by the relatively new Weldcore® process represents a very exciting methodology for obtaining more representative creep dam
Jan 1, 2013
-
Survey Slope Stability Monitoring: Lessons From Venetia Diamond MineBy F. T. Cawood, M. A. Jooste
This paper describes the survey monitoring processes at Venetia, which are discussed under visual inspections, ad hoc investigations, system monitoring and slope stability radar monitoring. This is fo
Jan 1, 2006
-
Incorporation Of Ore Grade Uncertainty Into The Push Back Design ProcessBy J. Gholamnejad
In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi
Jan 1, 2007
-
Integrated Furnace Controls: Implementation On A Covered-Arc (Shielded Arc) Furnace At Cerro MatosoBy T. Gerritsen, R. C. Delgado, J. Janzen, E. R. Veloza
The paper describes the components of an Integrated Furnace Control system for covered-arc (shielded arc) smelting with results from the recently started 75 MW Cerro Matoso Line 2 Furnace. The paper s
Jan 1, 2004
-
Rockburst Prediction - Case Studies Using A Kinematics Of Failure ApproachBy W. de Beer
We present aspects of one of several ongoing case studies used in the development of prediction techniques for major seismic instabilities. The current investigation centres on accelerated coseismic d
Jan 1, 1998
-
Simplification Of The Thabazimbi Dense Media Separation Plant Flow Line To Increase Capacity - BackgroundBy E de Villiers
Several methods exist by which the capacity of a dense media separation (DMS) plant can be improved: 1) Increase the feed rate in spite of efficiency 2) Replace with bigger equipment 3) Add wh
Jan 1, 2006
-
Haul Roads Can Make Money!By A. T. Visser
"SynopsisAlmost 20 years have passed since the cutting-edge research by Thompson and Visser on the design and management of opencast mine haul roads was conducted in South Africa. This system is based
Jan 1, 2015
-
Production of Al-Ti master alloys from TiO2 in a DC arc furnace - SynopsisBy M. Abdellatif
The production of a 40% Al-Ti alloy was successfully proven at the lab scale, using pure TiO2, aluminium, and lime. These tests were conducted in an induction furnace maintained at 1600?16250C. The in
Jan 1, 2009
-
Evaluation Of Pre-Beneficiation Options For Upgrading Of Low Grade Ore From Rosh Pinah Zinc-Lead MineBy D Reddy
Rosh Pinah Zinc Corporation is a zinc-lead mine located in southern of Namibia. It is currently considering the development of a low grade ore body containing about 2.8% zinc. This ore can be utilised
Jan 1, 2008
-
Process design of the Phola coal preparation plant - SynopsisBy G. M. Cresswell
The 2 360 t/h two module Phola coal preparation plant represents anew era of large plant in the Witbank coalfield designed to extend its life to 2020 and beyond. The plant uses the optimum processing
Jan 1, 2010
-
Coated Gold - Its Contribution To Gold Losses In Gold Plant ResiduesBy A. H. Mokken
Failed attempts at amalgamation of a gold/osmiridium concentrate, recovered behind pebble mill liners during re-lining, led to the discovery that the gold particles were coated and that nitric acid on
Jan 1, 1999
-
Vertical Integration As A Source Of Competitiveness: The Case Of Ferrochromium In Southern AfricaBy I. A. Mutemererwa
This paper investigates the role of vertical integration between chrome ore mines and ferrochromium smelters in the location of ferrochromium production capacity in South Africa and Zimbabwe. Vertical
Jan 1, 2000
-
Destruction Of Underground Methane At Beatrix Gold Mine - SynopsisBeatrix Gold Mine, a deep-level gold mine in the Free State province of South Africa, has the highest methane emission rate of any gold mine in the country. Methane is emitted from underground sources
Jan 1, 2011
-
Evaluation of some optimum moisture and binder conditions for coal fines briquettingBy P. Venter, N. Naude
"Coal mining is a thriving industry and 53% of the coal mined in South Africa is used for electricity generation. Mechanization has made coal mining more efficient, but fines generation has subsequent
Jan 1, 2015
-
Kell Hydrometallurgical Extraction of Precious and Base Metals from Flotation Concentrates – Piloting, Engineering, and Implementation AdvancesBy K. S. Liddell, L. A. Smith
"Kell is a hydrometallurgical treatment option for the recovery of platinum group metals (PGMs), gold, silver, and base metals from flotation concentrates to refined products on site. The process is c
Jun 1, 2019
-
Multicriteria Selection For An Alumina-Cement Plant Location In East Azerbaijan Province Of IranOne of the most important factors leading to the success of a cement plant is its location. A multicriteria decision-making method is used to rank alternative plant locations. The set of criteria is e
Jan 1, 2005
-
Simulation Of Time-Dependent Crush Pillar Behaviour In Tabular Platinum Mines ? SynopsisBy J. A. L. Napier
It has been established that significant time-dependent stope convergence may occur over time periods of hours and days in certain hard-rock gold and platinum mines. The source of this time-dependent
Jan 1, 2012