Incorporation Of Ore Grade Uncertainty Into The Push Back Design Process

The Southern African Institute of Mining and Metallurgy
J. Gholamnejad
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
9
File Size:
671 KB
Publication Date:
Jan 1, 2007

Abstract

In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possible push backs with regard to the minimum push back width requirements. These nested pits are produced by parameterizing on one economic parameter like commodity price, mining or processing cost, stripping ratio, etc. The most important characterization of these push backs is that the innermost push back has the highest value per ton, the second innermost push back has the second highest value per ton, and so on. These nested pits are generated based on the best estimates of grade within a representation of the orebody in a three-dimensional matrix form. Therefore, the inherent uncertainty associated with reserve estimation (for our discussion, grade uncertainty) is not taken into account when push backs are designed. These methods do not attempt to establish which part of the deposit is likely to be worth most. This paper introduces a new algorithm that incorporates ore grade uncertainty during the pushback design process. The suggested strategy tries to seek to schedule risky blocks later in the extraction sequence. Keywords: open pit mine, push back, ore grade uncertainty.
Citation

APA: J. Gholamnejad  (2007)  Incorporation Of Ore Grade Uncertainty Into The Push Back Design Process

MLA: J. Gholamnejad Incorporation Of Ore Grade Uncertainty Into The Push Back Design Process. The Southern African Institute of Mining and Metallurgy, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account