Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Aluminized Blasting Agents

    By Albert G. Funk, Gary M. Thornley

    The available energy of aluminized ANFO and aluminized slurry blasting agents has been measured by seismic methods, calculated theoretically, and compared. With aluminized ANFO it is concluded that al

    Jan 1, 1981

  • ISEE
    The Origins and Effects of Inter-deck Pressure in Decked Blasts

    By J. A. Rodgers, K. C. Whitaker

    The time domain during which an explosive detonates and causes rock to fragment and displace is on the order of tens of milliseconds. Because of this, the dynamic processes that occur during this time

    Jan 1, 2000

  • ISEE
    Reducing Eyebrow Break Caused by Rock Blasting in Malmberget Mine (86e4ad65-d689-43b3-b42e-a83837151808)

    By Z X. Zhang

    In sublevel caving mines, eyebrow break usually gives rise to lower ore recovery and worse safety in the field. Eyebrow break is caused mainly by two tensile stress waves: one from the front surface o

    Jan 1, 2011

  • ISEE
    Dynamic Mud Flow Effects on Emulsion Explosives in Indonesia

    By Garfiansyah Rayes

    In 2023, an Indonesian coal mine experienced significant contamination of an emulsion blend explosive by dynamic mud and water flow, triggered by flooding due to exceptionally high rainfall. This intr

    Jan 21, 2025

  • ISEE
    Blast Control for the Hydroelectric Project "El Cajón" in the State of Nayarit in Mexico

    By David Yanez

    The hydroelectric project "El Cajón" is currently under construction in the state of Nayarit, on the Santiago River, in western Mexico. This project is comprised of a Concrete Face Rockfill Dam (CFRD)

    Jan 1, 2006

  • ISEE
    Improved Fragmentation and Safety with Proper Borehole Loading Techniques

    By Lars Osen

    Both fragmentation and safety can be improved by following proper procedures in loading boreholes. Proper loading procedures such as primer location, borehole sealing, decking, and stemming along with

    Jan 1, 1985

  • ISEE
    Techniques for the Evaluation of Rock Mass Structure and Strength in Blast Design

    Blast performance is related to rock structure and strength, as well as to factors such as site geometry, drill patterns, explosives loading, firing sequences and delays.

    Jan 1, 1986

  • ISEE
    Rock Stitching Coupled with Controlled Blasting - A Cast Study

    It is a case study of huge rock-mass, loosened out from the parent rock-body, & posing a potential danger to structures down below the slope on which this rock mass was standing. Case was dealt in two

    Jan 1, 1997

  • ISEE
    Blasting as a Method for Abandoned Mine Land Reclamation

    By J Lyall Workman, Larry R. Fletcher

    Blasting methods have been proposed for reclaiming abandoned underground coal mine sites having unstable conditions. The objective of blasting is twofold: the permanent stabilization of an area by the

    Jan 1, 1991

  • ISEE
    Remote Vibration Monitoring as Historic Structions

    By Tom Donnelly, Roger C. Ilsley

    Remote telecommunications seismographs were used to monitor blast vibrations at two historic structures in Cedarburg, Wisconsin during adjacent sewer line construction. The purpose of the vibration mo

    Jan 1, 1991

  • ISEE
    The Challenge of Florida Blasting

    By George Pittman, Dan McCutchen

    When an explosive manufacturer in the USA wants to put a new explosive formula or detonator design in the toughest proving ground in North American, it is Florida. Florida conditions have baffled many

    Jan 1, 1995

  • ISEE
    Bulk Loading of Emulsion Explosives in Shaft Sinking

    By R J. Roach, D Roy

    After months of discussion on ways and means to improve productivity in the shaft sinking process, it was decided to look at those areas where, historically, methods have been stagnant for many years.

    Jan 1, 1997

  • ISEE
    A Review of Airblast-Induced Window Breakage

    By Bruce B. Redpath

    This paper reviews empirical and analytical information about window breakage due to airblast. As is the case with damage to structures caused by ground vibrations, a fixed break/no break threshold is

    Jan 1, 1976

  • ISEE
    Emergency Escapeway Holes Through in Five Shifts

    By Jim Breedlove, Stephen P. Case

    When a major ground subsidence occurred in the AKZO Salt mine at Retsof New York, the company was forced to pick up their production from a lower mine level. Before full production on the lower level

    Jan 1, 1995

  • ISEE
    The Mapping of Vibration Patterns Around a Blast

    By D T. Froedge, Michael J. Nutting

    A system consisting of an unlimited number of biaxial geophones that measure peak particle velocity and frequency has been developed and utilized at surface mines, quarries and construction sites. An

    Jan 1, 1990

  • ISEE
    Blast Vibration Analysis by a Time Series Technique

    By Francis O. Otuonye

    An application of a time series and systems analysis modeling technique to blast vibration data is discussed. The vibration data was taken from a rock support structure and the surrounding rock mass a

    Jan 1, 1994

  • ISEE
    Vertical Crater Retreat Mining. At the Luossavaara Research Mine

    By Bengt Niklasson

    "A test stope at the Luossavaara Research Mine in Kiruna, Sweden,was divided into four different modules in which various hole patterns and explosives were tested in order to evaluate:1. The optimum c

    Jan 1, 1985

  • ISEE
    Numerical Modeling of Oil Shale Fragmentation Experiments

    By J S. Kuszmaul

    The economic development of modified in situ oil shale retorting will benefit from the ability to design a blasting scheme that creates a rubble bed of uniform permeability. Preparing such a design de

    Jan 1, 1985

  • ISEE
    Influence of delay time accuracy on the fracture process in smooth blasting

    By Yoshiharu Tanaka, Keita Morooka, Masaaki Yamamoto, Katsuhiko Kaneko

    Smooth blasting is the standard method for underground rock excavation, to reduce over break and remaining rock damage. We already utilized the high accuracy of the electronic delay detonator to inves

    Jan 1, 1998

  • ISEE
    Developmental Blasting in an Urban Environment

    By Michael A. Barbaglia, Mark William Withey

    The lift shot is an essential blast design in the execution of mine creation and expansion plans. Whether it be opening a new quarry, creating a new level in an existing operation, or for control of w

    Jan 1, 1994