A Brand New Barrier Wall Installed at Wolf Creek DamBy Maurizio Siepi, Fabio Santillan, Lyndon Bedford, Carlo Crippa
"Abstract: Wolf Creek dam, on the Cumberland River in Kentucky, US, operated and maintained by the Nashville District of the USACE, is the Corps' largest reservoir east of the Mississippi river. The 1
Jan 1, 2014
-
Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected PilesBy A. Eslami
In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;
Jan 1, 2008
-
Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York CityBy Willie M. NeSmith
Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp
Jan 1, 2004
-
Short Comparison Of The Determination Of Allowable Loads Of Steel H-Piles Following The Practice Applied In Different European Countries - SynopsisBy L. P. Weber
During the years 1983-1987, a research programme, jointly performed by the steel producers ARBED, British Steel Corporation, Peine-Salzgitter, Unimetal, and co-sponsored by the European Community for
Jan 1, 1991
-
Practical Soil Nail Wall Design And Constructability IssuesBy Walter G. Kutschke
Four significant soil nail wall projects in the eastern United States were recently completed with a combined area of 175,000 square feet of finished shotcrete surface. These projects required the us
Jan 1, 2007
-
Numerical Analysis of CFA Piles for High-Rise Building of Administrative Centre Lakeside Park in BratislavaBy J. Stacho, Frankovská. J.
"Abstract The use of continuous flight auger (CFA) piles in Slovakia has increased significantly in recent decades. High-rise building of administrative centre Lakeside Park in Bratislava is based on
Jan 1, 2014
-
Emplacement Techniques: Impervious And Pervious Wall Construction ? SummaryBy Fred C. Schmednecht
For years, the strategy was to contain waste and in many applications, is still the recommended method. Recently, it has become acceptable to create filters below ground for the in-situ treatment of w
Jan 1, 1999
-
Non-Conventional Practice: Recent Case Histories of the use of Vertical Buttress Piles in Deep Excavation SupportBy Tony Brunger, Abid O. Adekunte, George Munteanu, David Greentree
A number of novel solutions have been proposed in recent years as alternatives to props and tie-backs in deep excavation support e.g. Adekunte (2008), Deschamps et. al. (2008), Adekunte et al. (2010)
Jan 1, 2018
-
Determination Of Design Pile Uplift Capacities Using Dynamic Pile Testing MethodsBy Juan M. Antorena
A pile driving and testing program was undertaken to evaluate installation procedures, assess capacity, particularly in uplift, of 360- and 460-mm (14- and 18-inch) square prestressed concrete piles a
Jan 1, 1995
-
Optimal Subsurface Investigation Approach for Overhead Transmission StructuresBy Haijian Shi, Drew Pizzo
This article focuses on the appropriate application of subsurface investigation methods for transmission structures, which are typically designed to resist lateral rather than vertical loads. Currentl
Jan 1, 2018
-
Critical Evaluation of Indian Standard for the Design of Laterally Loaded PilesBy Sanket Rawat, Ravi Kant Mittal, Vikash Prasad
"The understanding of the response of pile foundations under various types of loads is a necessary prerequisite to analyze and design them properly. Therefore, this paper highlights and compares the p
Jan 1, 2017
-
Roger Bullivant Cone PileBy R. A. Bullivant
Roger Bullivant Piling Limited has started 1992 with the introduction of the CONE PILE into its range of precast concrete foundation techniques. Since the establishment of its Piling Division ten
Jan 1, 1992
-
Session III - Foundation Techniques In The Urban Environment - Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building - SynopsisBy Martin J. Kenwright
Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi
Jan 1, 2000
-
CSM: An Innovative Solution For Mixed-In-Situ Retaining Walls, Cut-Off Walls And Soil ImprovementBy Fabrice Mathieu
The Cutter Soil Mixing (CSM) provides a cost effective solution for the rapid construction of retaining and cut-off walls using new equipment developed from diaphragm wall cutter technology. CSM consi
Jan 1, 2006
-
Axial Load Tests In Drilled Shafts And Piles In A Refinery: Comparison Between Design And Experimental ResultsBy Walter I. Paniagua
Drilled shafts and precast concrete piles were installed for the foundation of several structures in a reconfiguration project of a refinery in Minatitlan, Veracruz, in the Gulf of Mexico. The soils a
Jan 1, 2007
-
Pile Load Test On 1200 Mm Dia Pile In Cemented Soil - Synopsis:By B. Ramanathan
The results of a pile load test on a 1200 mm dia and 25 m long bored Cast-in-situ pile in soft rock is reported. The subsoil has a high N value of above 60 from 7 m to 21 m. The soft rock was observed
Jan 1, 1996
-
Improved Pile Economics: High Design Stresses And Remote Pile TestingBy Jim Frazier
Tradition has often dictated low design load stresses on piles. Such traditions often developed prior to modern static or dynamic pile testing methods and perhaps result from a few limiting situations
Jan 1, 2002
-
Limited Access Underpinning And Re-Leveling Of A Six-Story Office Building Using Jet Grouted MicropilesBy Tom Szynakiewicz
Micropiles are routinely used in the United States for foundation support and underpinning applications. The high capacities achievable with the use of micropiles, combined with specialty rigs for ea
Jan 1, 2008
-
Performance Based Seismic Retrofit Design of Brooklyn Basin WharfBy Sam Yao, Ali Naeem, Sara Barrett
Brooklyn Basin Project is a multi-billion-dollar development of the former Port of Oakland 9th Avenue Terminal located along the Oakland Estuary of California. A centerpiece of the development is the
Jan 1, 2018
-
Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)By Anne Lemnitzer