Lessons Learned From Mitigating Early Project Delays To Deep Foundation WorkBy Jeffery L. Ottesen
Early construction delays can jeopardize timely completion of subsequent work. As an early construction activity, and due to many unforeseen issues, deep foundation work inherently bears great potenti
Jan 1, 2002
-
Completely Automatized Recognition of the Installation Process in Special Foundation ConstructionBy Christian Hoyme, Jochen Maurer, Hans Regler
Up to today, it has been very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. It is becoming more and more important to be
Sep 8, 2021
-
The EFFC/DFI Carbon Calculator: Why and How to Use ItBy Kimberly Martin
The EFFC/DFI Carbon Calculator provides the deep foundations industry the opportunity to be a leader when it comes to carbon reduction. This tool was created 10 years ago in an extensive effort by the
Nov 1, 2022
-
Construction Of Large Drilled Shafts (The 2nd Annual Mike O'Neill Lecture)By Dan Brown
Improvements in construction equipment and techniques in recent years have made possible the use of drilled shaft foundations in diameters and lengths not previously considered practical or feasible.
Jan 1, 2008
-
Earth Pressure Acting On Single Driven Piles In SandBy Adel Hanna
Earth pressure acting on piles driven in sand is playing a major role in estimating pile capacity. In literature, researchers entertained simplifying assumptions in estimating the earth pressure actin
Jan 1, 2003
-
Micropile Performance Variability: A Fundamental Case StudyBy Walter E. Vanderpool
Type 1B micropiles (Bruce and Juran, 1997) can be installed rapidly and efficiently. During an 85-day period, 536 micropiles were installed to depths of 61 meters within a site 41 meters by 43 meters.
Jan 1, 2002
-
Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)By I. D. Dayal, Anil Kumar Jain
"Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat
Jan 1, 2016
-
DFI46 Panel on Foundation ReuseBy Andy Boeckmann
In early 2021, DFI formed a Foundation Reuse Task Force due to concurrent and coincidental discussions of this topic during meetings of the Subsurface Char- acterization for Deep Foundations and Test
Feb 1, 2022
-
Shoring Design of Historic LA Metro StationBy Babak Mamaqani
The Regional Connector Transit Corridor (RCC) is the Los Angeles Metro area's ambitious light rail project, running under the city's main thoroughfares, Flower and 2nd streets. When com- pleted, it wi
Apr 1, 2022
-
Methodology for Drilling Offshore or Onshore in Hard Rock for Deep Foundations with Pile Top Drill Rigs (PBA)By Dinesh Hinduja, Pérez: Miguel
"Large structures are generally exposed to dynamic and structural loading. They require usually either foundation connected to hard rock through sockets or driven foundations, which encounter boulders
Jan 1, 2015
-
Underwater Concrete In Drilled Shafts: The Key Issues And Case HistoriesBy Sam X. Yao
In construction of drilled shafts under water, placing concrete in the shafts is technically demanding and involves complex construction logistics. Past construction experience has demonstrated that h
Jan 1, 2013
-
Design Equations For Laterally Loaded Piles Embedded In SandBy T. G. Davies
The paper presents design equations for singly laterally loaded piles embedded in sand. These equations were obtained from a comprehensive nonlinear analysis of free and fixed head piles subjected to
Jan 1, 2010
-
Using Rigid Inclusions, Helical Piles And Micropiles To Revitalize 1600 Smallman Street.By Melinda J. Hummel, Zachary T. Smith, Nathaniel Witter, Nina F. Carney
The revitalization of Pittsburgh’s historic Strip District has led to the redevelopment of existing properties and the development of new properties. At one time, the Strip was home to wholesale marke
-
Liner Piles Used As Support To Kentledge For Initial Compression Load TestBy Venugopal B, M Kumaran, Thomas John, Vetriselvan A
The initial pile load tests are conducted to ensure the geotechnical capacity of the pile in a particular site condition. Normally kentledge method is adopted for the compression pile load tests. In t
Nov 1, 2022
-
Top-Loaded Bidirectional Test, a New Approach to Deep Foundations Load TestingBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
The Top-Loaded Bi-Directional Test (“TLBT”) is a new method to apply bi-directional loads to a deep foundation element with the loading source located above the foundation head. In the TLBT reusable l
Sep 8, 2021
-
Willow Island Hydroelectric Project: Taming the Ohio River to Create Green EnergyBy James M. Tantalla, Jr. Ellman
"Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff
Jan 1, 2016
-
Application of Triple-Axial CDM Method (Lemni 2/3 Method) for Stabilizing Soft SoilBy Kazuyoshi Kamimura, Masaya Kawata
"It has been 30 years since the cement deep mixing (CDM) method developed in Japan. CDM method has been applied to many structures. While various technical improvements have been implemented in the me
Jan 1, 2015
-
Lateral Response of Pole on Engineered Driven Timber Pile Footing at Ararat Windfarm Terminal StationBy Frank Albrecht, Brian McCarthy
"The Ararat Terminal Station (ARTS) is located 190km to the north-west of Melbourne, approximately 1.7km to the north of Elmhurst Township in the Pyrenees region of western Victoria, Australia. The si
Jan 1, 1900
-
Active Soil Nail Wall Underpinning Solution For The Bruce Museum ProjectBy Martin B. Hudson, Andrew K. Cho, Rolff B. Knobel, Les R. Chernauskas, Jonathan L. Ernst
ABSTRACT The Bruce Museum, located in Greenwich, Connecticut, is home to an extensive display of art and natural history exhibitions. A large addition was designed to be constructed adjacent to the mu
Oct 1, 2022
-
Underpinning And Micropiling To A Four Storey Apartment Building In Hamilton, ScotlandBy Clifford J. Wren
A geotechnical foundation solution was required to halt and prevent further structural distress suffered by a residential four storey apartment building in Hamilton, Scotland. Residents of the ten ye