Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Waste Rock and Tailings Mixtures as a Possible Seal for Potentially Acid Forming Waste Rock

    By G W. Wilson, C Panidis

    Potentially acid forming (PAF) waste rock contained in dumps formed as a result of open cut mining of metalliferous orebodies are conventionally sealed or covered using a near-saturated, low permeabil

    Jan 1, 2003

  • AUSIMM
    Higher Energy Bulk Explosives – Matching Products to Rock Types Using an Energy Map Concept

    By S Thomson, G Rigby, J Norgard, D Wilkinson

    Bulk explosives provide the energy to move a rock mass and reduce it to an optimal size (fragmentation). The intensity of energy needed depends on several factors including a customer’s geology and en

    Aug 24, 2015

  • AUSIMM
    Pushing the boundaries of slag operability – processing of high-MgO nickel concentrates with the Ausmelt TSL process

    By J Coveney, A Rich, D Grimsey, J Wood, S Creedy

    In 2021, BHP and Metso examined processing of high-MgO nickel sulfide concentrates using Metso’s Ausmelt Top-Submerged-Lance (TSL) technology. Test work was conducted in Metso’s pilot test work facili

    Aug 21, 2024

  • AUSIMM
    Impact of Rock Mass Characteristics on Hard Rock Tunnel Boring Machine Performance

    By J Rostami, D Tadic

    While hard rock tunnel boring machines (TBMs) have an established track record in the tunnelling industry, accurate estimation of TBM performance for each specific project remains critical. Machine pe

    Jan 1, 2008

  • AUSIMM
    The Design Of An Incremental Grinding Circuit Expansion At New Broken Hill Consolidated Limited

    By Chilman G. F, Lean P. J

    The New Broken Hill Oonsolidated LImited (NBHC) concentrator was commissioned in 1952 and underwent a number of expansions over the next 25 years. In 1978, the decision was taken to expand further

    Jan 1, 1983

  • AUSIMM
    The Use of Isanol at Roseberry Mine

    The problems encountered with the introduction and use of Isanol underground are described. Significant direct as well as indirect savings have resulted from the use of Isanol. Field studies have s

    Jan 1, 1977

  • AUSIMM
    Groundwater Search Management In Desert and Arid Terrain - A Case History Telfer, Great Sandy Desert, Western Australia

    During the intial two years (1972 - 1974) of exploration at Telfer, water require- ments were limited to supporting a 50 man camp and diamond drilling to verify thickness and grade of the strataboun

    Jan 1, 1988

  • AUSIMM
    Tunnelling in Archaean Rocks of the Darling Range, Western Australia

    The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable

    Jan 1, 1976

  • AUSIMM
    The Torsion Behaviour of Heat Treatment Steel Alloy (AISI 01)

    The torsion test is considered as the best test used when the part is subjected to static or dynamic torque. Many published papers have investigated the torsion of non-heat treated metals. However, ve

    Jan 1, 2003

  • AUSIMM
    Notes on the Estimation of Tungsten in Ores

    THE following notes simply sum up the writer's experience, which extended over a very busy period of some three years, dealing with wolfram ores and concentrates. The three methods for the estima

    Jan 1, 1922

  • AUSIMM
    The Design of Multi-Seam Workings at Shallow Depth Under Tidal Waters

    By Anderson KG

    Multi-seam mining under the western portion of Lake Macquarie NSW commenced in 1982. Up to three seams separated by partings ranging from 10 to 30 metres are mined simultaneously by Newcom Collier

    Jan 1, 1986

  • AUSIMM
    The Lead-Zinc Mineralization at Box Hole Bore, Georgina Basin, Northern Territory

    The common notion that the Box Hole Bore mineralization represents a variant of the Mississippi Valley type, has not been supported by the present investigation. Most of the common characteristics

    Jan 1, 1984

  • AUSIMM
    Comparison of the Generation of Shear Wave with Different Simulation Approaches

    By M Chen, Q D. Gao, Y G. Hu, P Yan, W B. Lu

    The safety and stability of construction structures are often affected by blast-induced waves. Investigating the generation mechanism of shear wave (S-wave) during blasting is important, because it ha

    Aug 24, 2015

  • AUSIMM
    Oxidative Leaching of Chalcopyrite in a Chloride-Sulphate Lixivant

    By Pollard D. M

    Chalcopyrite samples from two different localities were leached in oxygenated mixed chloride-sulphate lixivants at elevated temperatures and atmospheric pressure. The oxidation of chalcopyrite was

    Jan 1, 1987

  • AUSIMM
    Note on the Occurrence of Calaverite and Petzite in the Phantom Lode, Great Boulder Mine, Kalgoorlie

    The report by Baker (1958, p. 27) of krennerite in contact with gold in a specimen from the 2500 ft level, Phantom South lode, Great Boulder mine, Kalgoorlie, led the writer to look into this further,

    Jan 1, 1967

  • AUSIMM
    Mining a Narrow Ore Body - Innovative Mining and Blasting Methods

    By LeJuge G. E, McKenzie C. K

    Innovative mining and blasting techniques were demanded at the Richmont Mines, Francoeur Mine in Quebec, Canada, by a narrow, shallowly dipping high grade gold ore body. The ore body being mined oc

    Jan 1, 1992

  • AUSIMM
    The Outokumpu Lead Flash Smelting Process

    By Sulanto J, Talonen T

    In the mid 1960's Outokumpu considered building a lead Flash Smelter on the basis of Flash Smelting technology developed first in the late 1940s for smelting copper concentrates. Pilot scale t

    Jan 1, 1984

  • AUSIMM
    Material Flow in Acceleration Zone and Throughput of High Pressure Roller Mills

    By Schonert K

    The throughput of a HP-roller mill is determined by the acceleration of the feed material within acceleration zone and introduction into the compression zone. Both processes depend on the internal

    Jan 1, 1993

  • AUSIMM
    SXHD Crusher Developments at the Copper Concentrator, Mount Isa Limited

    By Molloy GR, Eaton RA

    The crusher development programme for 7ft Super Extra Heavy Duty (SXHD) Symons cone crushers commenced in 1984. The main objective of the programme was to run the crushers at maxi- mum power for the

    Jan 1, 1988

  • AUSIMM
    Appraisal of the Jameson Flotation Cell for Recovery of Cyanide Soluble Copper

    By Harbort G. J

    Jameson cell pilot plant trials were conducted in a number of areas in the Red Dome gold/copper flotation plant during 1991. The aim of testwork was to reduce the amount of cyanide soluble copper re

    Jan 1, 1992