Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A novel innovation for reconciliation

    By J R. Ruiseco, D La Rosa, L Julian, W Hunt

    The DeGrussa copper-gold deposit is located 900 km North of Perth. Copper-gold bearing massive sulfide lenses occur in lower greenschist facies meta-sedimentary and mafic volcanics of the Bryah Basin.

    Mar 22, 2022

  • AUSIMM
    Production and Ventilation Management Towards in Integrated Mine Information System

    By Ward M

    The current and future requirements for an underground mine information management system are being met with a flexible, value-engineered approach to mine information/communication infrastructures.

    Jan 1, 1995

  • AUSIMM
    Mineralogy and Geology of the Serpentinite Associated Hitura Ni-Cu Deposit, Finland: Implications for Benefication

    By Penttila V

    The Paleoproterozoic Hitura Ni-Cu deposit in western Finland is in an ultramafic igneous complex composed of two subvertical plug-shaped bodies embedded in intensely migmatised felsic gneisses. The

    Jan 1, 1996

  • AUSIMM
    A Review of Recent Developments in the Process Mineralogy of Gold

    In reviewing recent developments in the process mineralogy of gold it is convenient to distinguish between visible (>0.1 pm) and invisible gold (1 - 2 pm in size in polished section; these can scan

    Jan 1, 1992

  • AUSIMM
    Resource and Reserve category inflation – known rewards, hidden risks

    By M Bond, R R. Hargreaves, G W. Booth

    There are numerous causes of speculative mineral resource and reserve inflation. Traditionally, these are linked to issues of data accuracy or misinterpretation, the use of overly optimistic estimatio

    May 24, 2023

  • AUSIMM
    The Century Discovery, Queensland, Australia - Is Exploration Ever Complete? (c0b4033c-7bcc-4cd7-babd-7aa89f5e67ef)

    The Century zinc-lead-silver deposit has a geological resource of 118 million tonnes averaging 10.2% zinc, 1.5% lead and 36 g/t silver. It lies approximately 250 km NNW of Mt Isa in NW Queensland, Au

    Jan 1, 1995

  • AUSIMM
    Metallurgical Management Tools for Continuous Improvement

    By R Dunne, W McCallum

    Continuous improvement might be defined as seeking incremental improvement over time through improved equipment, processes, technology and the efforts of people. Most people working in ore processing

    Oct 29, 2012

  • AUSIMM
    Analysis of Rock Fragmentation and its Effect on Gravity Flow at the Kiruna Sublevel Caving Mine

    By N Petropoulos and M J Thurley, E Righetti, M Wimmer

    Fragmentation in sublevel caving (SLC) is vitally important. Both gravity flow and any downstream processes are affected. Reasonably coarse fragmentation may lead to larger draw bodies (isolated extra

    Aug 24, 2015

  • AUSIMM
    Structural Geology as a Tool to Reduce Geological Risks at the Mt Whaleback Mine, Western Australia

    Structural geological information is widely used at the Mt Whaleback Mine, Newman, WA. Recent improvements in the structural understanding of Mt Whaleback are providing a very cost-effective way of

    Jan 1, 1994

  • AUSIMM
    Footwall Stability at the LKAB's Kiruna Sublevel Caving Operation, Sweden

    By C DahnTr-Lindqvist

    The Kiruna mine produced about 19 Mt processed iron ore in 1999 using sublevel caving. General failure in the hangingwall has been widely studied and its mechanism is rather well understood. Failure i

    Jan 1, 2000

  • AUSIMM
    Fine-Tuning Raise Bore Stability Assessments and Risk

    By W A. Peck

    Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug

    Mar 21, 2011

  • AUSIMM
    Full-scale Tests on Precast Tunnel Segments Made in Concrete Reinforced with High-strength Steel Fibres

    By A Ross, B De Rivaz

    The results of full-scale tests on precast segment made at University of Roma are presented. The segments were cast using fibre-reinforced concrete produced without any traditional reinforcement, by u

    Sep 17, 2014

  • AUSIMM
    Advanced Design Concept on Largest Diesel-Mechanical Truck-Komatsu HD1600M

    By Kato Y

    As a direct result of the Mining Industries need to improve efficiency and production in Open Pit type operations, the size of haulage units have increased dramatically. This trend has continued su

    Jan 1, 1982

  • AUSIMM
    Remnant Mining at Liddell Open Cut

    The mining of remnant coal reserves at the Liddell Open Cut is subject to a number of risks. These risks are of both a technical and financial nature. Liddell Open Cut is principally a conventional

    Jan 1, 1994

  • AUSIMM
    Optimisation of cemented rock fill strength for open stope support

    By J Player, R de Vries, E Villaescusa, H Saw, R Hassell

    The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s

    Oct 16, 2017

  • AUSIMM
    Use of Anchored Gaskets in Segmented Bored Tunnels

    By A Roseman, T Gruber

    Traditional methods for installing gaskets for segmented bored tunnels have relied upon different bonding procedures with adhesives that carry a series of disadvantages to segment producers. Fixation

    Sep 17, 2014

  • AUSIMM
    Opening Address

    Mining is a global industry. The conference is a good example of this, as itÆs jointly organised by professional associations from Canada, Australia and South Africa, and has attracted speakers and de

    Jan 1, 2006

  • AUSIMM
    Developments in Mineral Processing Technology

    By Greenhalgh L. P H

    The opportunities offered by an increasingly volatile world invite the international consultant or engineering services contractor to broaden attitudes, diversify interests, expand capabilities, retai

    Jan 1, 1993

  • AUSIMM
    The Eight Millisecond Time Window Myth

    By A B. Richards

    Time window analysis that limits the explosive mass fired within a specified time window (commonly eight milliseconds) has been used for many years in blast design by explosives engineers. Despite sev

    Jan 1, 2003

  • AUSIMM
    Rock Mass Classification as an Aid to Estimating the Strength of Coal Pillars

    By Tyler DB, Thin LGT

    Coal mass strength properties must be estimated to obtain realistic estimates of coal pillar strength. The limitations of existing techniques for approximating these properties are discussed. The c

    Jan 1, 1992