Full-scale Tests on Precast Tunnel Segments Made in Concrete Reinforced with High-strength Steel Fibres

The Australasian Institute of Mining and Metallurgy
B De Rivaz A Ross
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
2498 KB
Publication Date:
Sep 17, 2014

Abstract

The results of full-scale tests on precast segment made at University of Roma are presented. The segments were cast using fibre-reinforced concrete produced without any traditional reinforcement, by using fiber made in high-strength steel and a new type of anchorage.Bending tests were performed in order to check the bearing capacity of the segments under the flexural actions; these occur during de-moulding, handling, storage phases as well as in the in situ condition (due to asymmetric soil pressure). Furthermore, point load tests simulating the TBM thrust were performed, in order to study the construction phase (excavation).The results show that the segment response largely respects the material testing and design advice according to the Fib Model Code 2010. Providing engineers, precast operators and builders confidence in material strengths and design methodology.CITATION:De Rivaz, B and Ross, A, 2014. Full-scale tests on precast tunnel segments made in concrete reinforced with high-strength steel fibres, in Proceedings 15th Australasian Tunnelling Conference 2014 , pp 469–476 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation

APA: B De Rivaz A Ross  (2014)  Full-scale Tests on Precast Tunnel Segments Made in Concrete Reinforced with High-strength Steel Fibres

MLA: B De Rivaz A Ross Full-scale Tests on Precast Tunnel Segments Made in Concrete Reinforced with High-strength Steel Fibres. The Australasian Institute of Mining and Metallurgy, 2014.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account