Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Characterization Of Overburden Response To Longwall Mining In The Western United StatesBy Khamis Y. Haramy
The U.S. Bureau of Mines installed surface and subsurface instruments at a mine site in Colorado to monitor and characterize the overburden response to longwall mining. Instrumentation included a time
Jan 1, 1992
-
Application Of Mechanical And Groundwater-Flow Models To Predict The Hydrogeologic Effects Of Longwall Subsidence - A Case StudyBy Danny J. Van Roosendaal
An investigation was undertaken to determine hydrogeological effects of subsidence over a longwall coal mine in the Illinois Basin. At this mine, approximately 200 ft of bedrock overburden is overlain
Jan 1, 1995
-
The Use of the Area of Main Influence to Fix a Relevant Boundary for Mining Damages in GermanyBy Denise Mueller, Axel Preusse
"In 2010, the fracking discussion in Germany caused a number of changes in German law, which came into force in 2016. Especially the production of gas had to be regulated. With the legislation amendme
Jan 1, 2017
-
Monitoring Consolidation Settlement Deformation in Deep Borehole of Unconsolidated Strata USing Fiber Bragg Grating SensingBy Liang Dong, Jinxuan Liu, Biao Qiu, Jing Chai
"The Cenozoic unconsolidated strata in the east area of China are composed of clay, sandy clay, fine sand, hardpan, etc. Numerous shafts of the coal mines in these areas have been damaged in various d
Jan 1, 2010
-
Geotechnical Risk Management to Prevent Coal Outburst in Room and Pillar MiningBy Peter Zhang, Dan Neilans, Scott Peterson, Scott Wade, Joe Pugh, Ryan Mcgrady
"A coal outburst is a severe safety hazard in room-and-pillar mining under deep cover. It is more likely to occur during pillar retreating. Multi-seam mining dramatically increases the risk of coal ou
Jan 1, 2015
-
Non-Destructive Testing Method for Determining the Characteristic Length and Initial Axial Bolt Load and Its ApplicationBy Houquan Zhang, Yu Wu, Yanlong Chen, Zhenfu Luo, Aihong Lu
"A non-destructive detection scheme for bolt installation quality was designed by adopting the method of non-destructive detection on bolt installation quality. Based on the field measurements, a rand
Jan 1, 2016
-
Remote Control Roof BoltingBy Cosmo P. Fazio
Remote control roof bolting is approaching reality with the continued improvement of a number of components and subsystems being developed by The Bendix Corporation under sponsorship of the U.S. Burea
Jan 1, 1982
-
Roklok Polyurethane Binder: A Chemical Injection System For The Consolidation Of Severe In-Mine Ground ConditionsBy Kirk W. McCabe
RokLok binder is a two-component polyurethane system consisting of a polymeric isocyanate (Component A) and a polyol resin (Component B). The two chemicals are mixed and injected into the mine rock un
Jan 1, 1981
-
Comparative Case Study Of Yielding And Critical Coal Pillar Designs In Bump-Prone StrataBy J. R. Koehler
The failure of yield pillar-based gate mad designs to provide adequate ground control performance is primarily related to the use of "critically" sized chain pillars. A "critical" pillar is one that f
Jan 1, 1995
-
A Review of the Geomechanics Aspects of a Double Fatality Coal Burst at Austar Colliery in NSW, Australia in April 2014By Bruce Hebblewhite, Jim Galvin
"A coal burst occurred on 15 April, 2014 at the Austar Coal Mine, located west of Newcastle, NSW, Australia. The burst resulted in fatal injuries to two men working as part of the mining crew at the d
Jan 1, 2016
-
Cross Well Acoustic Tomography To Locate Abandoned Underground Mines And Subsidence FailureBy Linda K. Killoran
The U.S. Bureau of Mines has developed a prototype cross well acoustic logging system and complementary tomographic image reconstruction software for the detection and delineation of abandoned undergr
Jan 1, 1992
-
Case Study of the Barro Branco Coal Mine Pillar BurstBy Fernando O. L. Xavier
"The Barro Branco coal mine was located in the southern region of Brazil, in the state of Santa Catarina. In 2002, an incident occurred at the mine, leading to a violent, massive pillar failure, resul
Jan 1, 2017
-
Roof-Pillar Interface Affecting the Pillar BehaviorBy Andre Cezar Zingano
"The empirical approach for pillar design assumes that geological conditions should be perfect, such as horizontal seams, and that pillar strength and behavior will only depend on the coal seam streng
Jan 1, 2016
-
Options to Control Groundwater-Based Georisks along Geological Faults in the Large Scale Area of Influence of an Open Pit MineBy Markus Papst, Denise Millier, Daniel Beckers, Axel Preusse
"At an open-pit lignite extraction mine in Germany, groundwater has to be pumped over a large area, which leads to subsidence at the surface. As long as the geology of the area of influence is homogen
Jan 1, 2016
-
SOMA: A New Method to Calculate the Operative Stress Field: Results from the Laurel Mountain Mine, Russell Co., VirginiaBy Craig Byington
The stress-field orientation mapping and analysis (SOMA) technique for determining the operative stress field near mine workings and its relationship to various fracture sets is described using Dicken
Jan 1, 2004
-
Investigation Of Seam Thickness And Seam Splitting Within A Longwall Panel By An In-Seam Seismic SurveyBy Wolfgang Schott
The propagation velocity of in-seam seismic (ISS ) waves depends on frequency which is also known as dispersion. This dispersion is not only determined by the thickness of the coal seam and its dirt h
Jan 1, 2003
-
Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded HaliteBy Liane J. Terrill
A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted
Jan 1, 1997
-
Assessment of Roadway and Yielding-pillar Performance During Retreat Longwall Extraction at a United Kingdom Deep MineBy Leigh Sharpe
Dunng the last 5 years a United Kingdom colliery has utilised a yielding-pillar configuration to extract a relatively thick coal seam at a depth of 640 m. As part of ongoing research into the siting o
Jan 1, 1998
-
A Case Study Of Abandoned Mine Subsidence At Dominion, Nova Scotia, Canada, 2002-2003By Dave Forrester
Mining subsidence over shallow abandoned coal mine workings is unfortunately not an uncommon experience in the coalfields of North America and there is a significant knowledge and literature base addr
Jan 1, 2004
-
Numerical Simulation of Overburden and Surface Movements for Wongawilli Strip Pillar MiningBy Guo Wenbing
"INTRODUCTIONThere is a great amount of coal (about 140 billions tons) left unmined under the surface structures, water bodies, railways (referred to as the “three-body”). Coal mining under “threebody
Jan 1, 2015