Non-Destructive Testing Method for Determining the Characteristic Length and Initial Axial Bolt Load and Its Application

- Organization:
- International Conference on Ground Control in Mining
- Pages:
- 6
- File Size:
- 694 KB
- Publication Date:
- Jan 1, 2016
Abstract
"A non-destructive detection scheme for bolt installation quality was designed by adopting the method of non-destructive detection on bolt installation quality. Based on the field measurements, a random non-destructive detection method for determining the characteristic length including anchoring length, free segment length and initial axial load of bolt was discussed, and the characteristics of increasing bolt axial load in the initial stable stage was obtained. The results show that the bolt axial load and deformation of surrounding rocks correlate each other. Compared with the traditional detection technique for bolt installation quality, the non-destructive detection method has obvious advantages such as random, accuracy, and economic. The method provides a reliable basis for bolt support optimization and stability control of surrounding rocks.INTRODUCTIONBolt support in roadway can make the surrounding rocks and bolt form a structure in the early stage of roadway development through the bolt pre-tension, which can maximize the self-bearing capacity of surrounding rocks. Thus it is a form of active support (Kang, 2007). In order to make the bolt play an active supporting role, it needs to ensure the installation quality of bolting. Thus the bolts can supply a high initial anchoring force and control the deformation of surrounding rocks (Shan, 2009; Wei, 2012). Moreover, bolt supporting is a concealed work. Once installation quality problems appear; it will be difficult for effective detection and screening (Xie, 2008).THE PROBLEMS OF BOLT INSTALLATION QUALITY IN COAL MINE AND ITS DETECTIONThe Problems of the In Situ Bolt InstallationDue to the problems in installation environment, machine, and technique, and workers proficiency (Li, 2003), there are many problems exist in bolt installation. If the borehole depth is too long, the anchoring agent will accumulate at the bottom of the bore, which reduces the anchoring length. Furthermore, if the borehole depth is short due to the poor geological condition, the exposed part of the bolt will be too Jong and the pallet cannot cling to the rock face, which prevent the pre-tension from being applied. The pre-tension is very important for bolt installation. If pre-tension is insufficient the rock bolt cannot control the deformation of surrounding rock efficiently and the bolt anchoring force will decrease considerably. The bolt length is another important parameter for anchoring quality, which will affect the control area of bolt supporting. In addition, the cleanness of drill hole has a great influence on the effective anchorage length of bolt. If the drill hole cleaning is not enough, it will directly affect the anchoring agent and the contact area of surrounding rocks, which will decrease the effective anchorage length and initial anchor-force."
Citation
APA:
(2016) Non-Destructive Testing Method for Determining the Characteristic Length and Initial Axial Bolt Load and Its ApplicationMLA: Non-Destructive Testing Method for Determining the Characteristic Length and Initial Axial Bolt Load and Its Application. International Conference on Ground Control in Mining, 2016.