Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Use Of Rim- To Detect Geologic Anomalies In The Clarion Seam

    By M. Craig Miller

    As the trend continues in the U. S. toward inceased capital investment in longwall mining equipment and wider panels. the risk also increases for gotential financial and production loses due to undete

    Jan 1, 1990

  • SME-ICGCM
    Numerical simulation of coal pillar loading with the aid of a strain-softening finite difference model

    By A. T. Iannacchione

    Numerical simulation of coal pi1lar loading has traditionally been a difficult task due to the unique and highly variable properties of coal and the inability of numerical procedures to duplicate thes

    Jan 1, 1989

  • SME-ICGCM
    Planning And Design For Barrier Pillar Recovery Three Case Histories

    By David A. Newman

    Barrier pillars created during mine development provide additional reserves during mine closure and can be the sole access to reserves previously abandoned because of mining height or out of seam dilu

    Jan 1, 1995

  • SME-ICGCM
    Support selection of mine roadways by means of a computer program

    By Erdal Ünal

    The computer program introduced in this paper is based on design guidelines developed for selection of support systems used in mine roadways. The support types considered include rock bolts as well as

    Jan 1, 1989

  • SME-ICGCM
    Comparison Of Empirical, Analytical, And Numerical Methods Of Pillar Design And The Development Of A Site Specific Pillar Formula

    By Vincent A. Scovazzo

    Many accepted and useful methods have been developed and used for pillar design. Each method has its own particular strengths and weaknesses. Three methods addressed in this paper are; empirical, anal

    Jan 1, 1995

  • SME-ICGCM
    Progressive Failure Of The V-Day Mine And A Comparison With Other Similar Failures In Illinois

    By G. C. Marino

    The performance of the V-Day Mine near Danville, Illinois has been evaluated from data extending over about a 20 year period. The area included in this study involves over 16 acres. Essentially this e

    Jan 1, 1990

  • SME-ICGCM
    Moranbah North Tests the Critical Caving Theories Every Geotech Engineer?s Dream, the Ability to Get More than Two Points on a Curve

    By Chris Strawson

    Moranbah North is a modern longwall operation mining premium coking coal in the Northern Bowen Basin, Central Queensland. Australia Moranbah North Coal (MNC) is owned and operated by Anglo Coal Austr

    Jan 1, 2007

  • SME-ICGCM
    The Effect of Immediate Strata on Pillar Behavior in Retreat Pillaring-- A Case Study

    By A. W. Khair

    This paper deals with the analysis of pillar failure in a room and pillar mining operation of a deep underground coal mine. The incident here involved the failure of more than 100 pillars. The mechan

    Jan 1, 1986

  • SME-ICGCM
    Mine Layout Deign for Coal Bump Control

    By Hamid Maleki

    A comprehensive study consisting of stress determinations, core logging, laboratory testing, and numerical analyses was conducted to investigate the cause and potential alternatives to the coal bump c

    Jan 1, 1987

  • SME-ICGCM
    A Troubleshooting Guide for Roof Support Systems

    By Raymond A. Mazzoni

    Over the last twenty years, roof support technology has made numerous advances since the original wedge and slotted bolts of the 1950's. By comparison, the roof supports used today are more compl

    Jan 1, 1997

  • SME-ICGCM
    Monitoring Mobile Roof Supports

    By Kenneth E. Hay

    Researchers from the U.S. Bureau of Mines conducted a field study to assess the safety of remotely controlled mobile roof supports (MRS) in a retreat pillar mining operation, Data were collected to pr

    Jan 1, 1995

  • SME-ICGCM
    Analysis Of Multiple-Seam Interaction In A Bump-Prone Western Coal Mine Using MULSIM/PC

    By D. A. Donato

    It is often necessary for a mining company to extract coal from a seam underlying a previously mined coal seam. The impact of the overlying mine workings on the stress distribution within the underlyi

    Jan 1, 1996

  • SME-ICGCM
    Major Hazard Risk Assessment Applied To Pillar Recovery Operations (ad413764-c947-4465-9ec3-62ea91281168)

    By A. T. Iannacchione

    Recent fatal injuries occurring during pillar retreat coal mining call for better identification of the hazards and recognition of risks. Ground control hazards associated with room-and-pillar retrea

    Jan 1, 2009

  • SME-ICGCM
    State-Of-The-Art Room-And-Pillar Retreat Mining In The Kittanning Coalbed (6805422e-8080-42ac-9a3a-30ed4eeda62f)

    By Alan A. Campoli

    The U.S Bureau of Mines is conducting research to develop improved guidelines for selecting the type and pattern of roof support in different geologic environments (Mucho, et al., 1995). As a part of

    Jan 1, 1996

  • SME-ICGCM
    Pillar Stability Issues Based on a Survey of Pillar Performance in Underground Limestone Mines (08bccb54-5d4b-443a-860e-90b5a6841ec3)

    By Gabriel S. Esterhuizen

    A survey of pillar conditions was carried out at 21 operating limestone mines that use the room-and-pillar method. The surveyed pillars were all located in rock that was classified as ?Good? to ?Very

    Jan 1, 2006

  • SME-ICGCM
    Monitoring Indices For The Support And Surrounding Strata System On A Longwall Face (d3af3b40-bd2b-43ab-adc6-f4c445bf5433)

    By Ming-Gao Qian

    How to monitor and control the support and surrounding strata system on a longwall face effectively is one of the major research problems in ground control. Based on observations on movements of the s

    Jan 1, 1992

  • SME-ICGCM
    The Response Of A High Order Stream To Shallow Cover Longwall Mining In The Northern Appalachian Coalfield

    By John A. Owsiany

    The effect of longwall mining on streams and shallow aquifers has been the subject of numerous research studies for more than twenty years. As a result of these studies, it has become common to consid

    Jan 1, 2001

  • SME-ICGCM
    Improved Source Location And Evaluation Of Seismic Events Over A Deep Coal Mine

    By D. S. Choi

    This paper describes an improved source location technique for microseismic events related to coal mining. A system of non- linear distance equations is solved with the use of the Newton-Raphson metho

    Jan 1, 1990

  • SME-ICGCM
    Three-Seam Interaction: A Case Study

    By N. P. Kripakov

    Results of a complex three-seam interaction analysis in a western U.S. coal mine are presented. The physical situation simulated by the models represents the development of a set of entries underneath

    Jan 1, 1996

  • SME-ICGCM
    Geotechnical Factors Influencing A Time-Dependent Deformation Mechanism Around An Entry In A Dipping Seam

    By M. K. Larson

    The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms in strata around a longwall gate road system at two sites in an underground coal mine near Ham, WY.

    Jan 1, 1996