Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
TBM Data and Performance Monitoring on Large Diameter TBM Tunnels Lined with Shotcrete in the Himalayas—A Case Study - RETC2021By Gary Peach, Peter Mason
Planning and estimating progress rates and costs for tunnelling is always best done based on experience and historic precedent. Much precedent is available but the use of data monitoring, data mining
Jun 13, 2021
-
Small Mines Development in China's Gold Mining IndustryBy Xie Longshui
INTRODUCTION The gold production is from the state-owned gold mines, the local gold mines and the by-product of metal mines. Since 1975, the small gold mines have developed in rapid strides. Curre
Jan 1, 1987
-
Truck/Shovel Dispatching Rules Assessment Using SimulationBy Y. Lizotte
The purpose of this paper is to describe a stochastic simulation program used to assess several dispatching rules applicable to small scale computerized systems for optimizing truck/shovel productivit
Jan 1, 1986
-
Discussion - Tailings Dam Performance From USCOLD Incident-Survey Data - Technical Papers, Mining Engineering, March 2001, Vol. 53, No. 3, pp. 49-53- Strachan, C.By A. F. Agnew
Discussion by A.E Agnew Strachan's paper summarizes a wealth of data on water-storage dam "incidents" published by USCOLD and ASCE in 1988, together with a review of tailings-dam incidents pub
Jan 1, 2003
-
Subsidence Experiences In The Room-And-Pillar Mines Of The Northern Appalachian CoalfieldBy Kewal K. Kohli, Richard E. Thill, Syd S. Peng
The results of unpublished investigations into surface subsidence from coal mining in the Northern Appalachian Coalfield are summarized. These investigations were carried out by various coal companies
Jan 1, 1982
-
Evaluation of the Rock Burst Intensity of a Cloud Model Based on the CRITIC Method and the Order Relation Analysis Method - Mining, Metallurgy & Exploration (2023)By Yongheng Jiang, Wentong Wang, Haoming Luo, Chuanju Liu, Qianjun Zhang, Sha Guo
Rock burst has always been a major problem in deep underground engineering with high stress, and rock burst strength evaluation has become an important research topic. To effectively predict the rock
Sep 1, 2023
-
Smart Transmitter TechnologyBy A. Johnson
When are SMART transmitters the smartest choice? To answer this question requires a closer look at SMART transmitter technology. It is necessary to understand this technology in order to recognize how
Jan 1, 1988
-
World Record Set In Poland: Cat Plow System Sets Mark From Single FaceOn Feb. 16, 2012, the Polish coal mining company Lubelski Wegiel Bogdanka S.A. set the world record for daily production from a plow-equipped longwall, with an output of 24.4 kt (26,900 st) of coal fr
Jan 1, 2012
-
Invensys’ User Conference Discusses Plant Automation and ControlBy Steve Kral
Invensys is a London-based supplier of automation and control systems to a variety of manufacturing and processing industries. Through its global subsidiaries, Invensys provides customized, advanced
Jan 1, 2002
-
Advanced Froth Flotation -A Cost Effective Tool for Reducing An Acid Rain Precursor?By K. E. Harrison
Acid rain legislation as proposed by President Bush [1], if enacted, will immediately refocus current thinking on the economic decision-making as related to coal preparation facilities. Unit operation
Jan 1, 1990
-
New integer programming models for tactical and strategic underground production schedulingBy A. Newman, M. Goycoolea
"In this paper, we consider an underground production scheduling problem consisting of determining the proper time interval or intervals in which to complete each mining activity so as to maximize a m
Mar 1, 2017
-
Assessing the Feasibility of Automated Data Monitoring and Control Stratiges for Chemical Treatment of NPDES Outlets: Bench-Scale StudiesBy C. Vass, A. Noble
"The chemical treatment of mine-influenced waters is a longstanding environmental challenge for many coal operators, particularly in Central Appalachia. Mining conditions in this region present severa
Jan 1, 2016
-
Direct Cyanidation and Roasting Combination of a Semi-Refractory Massive Sulfide OreBy P. Karimi, A. Akcil, A. Amini, H. Abdollahi
"In this study, cyanidation experiments were carried out on a massive sulfide ore sample, whose grades of the precious metals gold and silver were found to be 4.2 g/t and 311.9 g/t, respectively. Othe
Jan 1, 2015
-
Potential Development of the Underground Science City in Rock Caverns at Kent Ridge in SingaporeBy K. W. Lee, C. Pound, J. Carmody, L. Petersen, C. Nelson, J. G. Cai
The feasibility of developing the Underground Science City below the Kent Ridge Park has been investigated. The primary aim of the study has been to explore the possibility of creating underground spa
Jan 1, 2001
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
Dynamic Response Of The Continuous Mechanical Froth Flotation CellBy Leon Y. Sadler
Equations which predict the unsteady-state response of the continuous froth flotation cell to changes in operating conditions are necessary for the rational design of an automatic flotation cell contr
Jan 1, 1972
-
Research And Development On Coal Mining Health And Safety Problems In The United States ? IntroductionBy Robert L. Marovelli
The major mining health and safety problems of concern to United States Government and private industry researchers in 1981 included the difficulty experienced by longwall operators in complying with
Jan 1, 1982
-
Stability Prediction And Performance Of Highwall Steepening In Weak RockBy D. R. Brox, J. Levell
The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit
Jan 1, 2001
-
TBM Data Management And Quality Assurance For The Brightwater Conveyance ProjectBy Jeffrey Mitsopoulos
King County?s (KC) Brightwater Conveyance Project in Seattle, Washington involves the construction of approximately 21 kilometers (13 miles) of bored tunnel, in three contracts, with four TBM?s which
-
A Computer Program For Solving Complex Auxiliary Ventilation SystemsBy F. Calizaya
This paper explains and discusses a computer program developed to determine the ventilation design parameters for complex auxiliary ventilation systems such as those found in the construction of long
Jan 1, 1994