Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 174 KB
- Publication Date:
- Jun 13, 2023
Abstract
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction
of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the
features and benefits of lump-sum, design-build that led NBC to select it as the project
delivery method. The use of a design-build contracting process that included proprietary
meetings to discuss and obtain feedback on Alternative Technical Concepts
as well as to facilitate reaching consensus on modifications to the GBR-B is also
described. The discussion includes features and benefits of design-build process that
not only addressed NBC’s desired outcomes, but also allowed the Design-Builder to
propose several innovative changes to the Base Technical Concepts included in the
bid documents, and to develop a GBR-C that was compatible with their proposed
means and methods of construction and addressed what they believed to be the more
significant subsurface risks on the project.
Citation
APA:
(2023) Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023MLA: Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023 . Society for Mining, Metallurgy & Exploration, 2023.