Design and Construction of the New VDOT Midtown TunnelBy Rick Ellman, Ian Chaney
"The Hampton Roads area encompassing the Norfolk, Virginia Beach and Newport News metropolitan region experiences some of the worst traffic congestion in Virginia. With continued growth of the ports a
Jan 1, 2014
-
Three Mass Stabilization Phases in the West Harbor of Helsinki, Finland – Geotechnical and Environmental Properties of Mass Stabilized Dredged Sediments as Construction MaterialBy Leena Korkiala-Tanttu, Noora Lindroos, Juha Forsman
"Construction works at the Helsinki city sea shoreline requires dredging and handling of contaminated sediments. Most of these soft dredged sediments are regarded as too poor quality material for eart
Jan 1, 2015
-
A Case Study Of Deep Shaft Excavation In River Channel Soil Deposit In KolkataBy Kaustuv Bhattacharya, Manish Kumar, Nirbhay Singh, Prodyot Kr. Ray, Praveen Soin
This paper highlights salient features of an excavation 38 m (Length) by 10 m (Width) by 24 m (Depth) carried out in Central Kolkata. Secant pile wall (SPW) formed using a combination of alternating 1
Sep 1, 2022
-
Construction Of Two Microtunnel Access Shafts Using The Cutter Soil Mix (CSM) Method In The San Joaquin Delta, CaliforniaBy Eric S. Lindquist
Two microtunnel access shafts were constructed using the Cutter Soil Mixing (CSM) method in the San Joaquin Delta region of California, east of San Francisco. Unlike conventional slurry walls and diap
Jan 1, 2010
-
Rock Excavation and Underpinning below a 19-Story BuildingBy Kevin P. Gleckler, Steven C. Highfill
"Escalators to access platforms for the Second Avenue Subway Station at 72nd Street in Manhattan are to be installed in the basement of an existing 19-Story residential building. The escalators, which
Jan 1, 2016
-
Innovative Design for Retaining Structures using Combined ProductsBy Clifford Taylor, Alexander Zöhrer
"The execution of deep basement excavations under narrow conditions is one of the most challenging tasks in geotechnics. The vicinity of neighbouring buildings, roads, and underground structures such
Jan 1, 1900
-
Installation Of Augered Cast-In-Place Piles - Equipment (b596934a-6910-4dd1-8c4a-72745306d21b)By Tracy Brettmann
? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2001
-
The Emerging Technology of EHDEBy Jerold Bishop, Grant Bearss, Aleksey Egorov
"When a shock wave is released in the bottom of a drill hole filled with wet concrete slurry, the result is called an electrohydrodynamic effect, or EHDE. The energy is carried through the fluid with
Jan 1, 2009
-
A Digital Twin For Deep Vibro Ground ImprovementBy Negin Khalili-Motlagh-Kasmaei, Paul O'Leary, Christopher J. Rothsiedl, Dimitar Ninesvski, Alexander Zöhrer, Vincent Winter
This paper presents the implementation of a digital twin for the vibro-replacement ground improvement process, as part of a digital construction site. The goal is to implement an evidence-based qualit
May 1, 2022
-
Design Of Laterally Loaded Single Pile In Sand Near Slope - A Proposal For Subgrade Reaction FactorsBy Salim Mezazigh
Usually different methods for designing a single pile submitted to a lateral loading are available. They are based on theory of elasticity with the parameters E,v or subgrade reaction method using the
Jan 1, 2002
-
Detecting Cement Mixing Pile with Cone Penetration Test in the Reserved HoleBy Wu Jian-tao, LI Guo-wei
"The Cement Mixing Pile (CMP) quality assurance assessment is an important programme in evaluating the efficiency of foundation improvement. Coring is the current specified method of quality assessmen
Jan 1, 2015
-
Pressure Injected Footings Mobile Convention Centre - IntroductionBy D. G. Bishop
This paper is intended as a review and update of the use of Pressure Injected Footings as deep foundation units in North America. We will discuss various aspects of this pile and then discuss a partic
Jan 1, 1992
-
Definition of Drilling-Activity Patterns Based on Production Data ProfilesBy Diego Bellato
Production data recorded by special foundation rigs during construction activities at the site are commonly used for quality assurance / quality control procedures and, in particular, to prove that th
Jan 1, 2019
-
Direct Power Compaction - a New Deep Vibro-Compaction Method for Liquefaction Mitigation of Hydraulically Placed Sand Layers in San Francisco BayBy Nozomu Kotake, Rakshya Shrestha, Ralph Griffin, Stefanos Papadopulos, Jeff Fippin, Sushil Kafle
Direct Power Compaction (DPC) is a deep Vibro-compaction method used for liquefaction mitigation. In DPC, H-beams are used as vibrating rods penetrating deep into the ground, and a vibrating force is
Sep 8, 2021
-
Failure Analysis and Strengthening of Tailing Pond Embankment by Prefabricated Vertical Drains and GeogridBy Anup Kumar Mandal, Sanjoy Chowdhury, Biswajit Das
"Tailing pond of an iron ore mine necessitated raising the height of its embankment to create additional storage capacity. The tailing pond is located in eastern India and raising the height of embank
Jan 1, 2015
-
Session 24 "Compaction Grouting and Consensus Guide"By Richard Berry
The spacing of grout injections is typically about 2 to 2 V½ meters if the purpose of the grouting is densification of the in-situ soils. Hole spacing will vary with the in-situ soil properties and th
Feb 10, 2003
-
Ground Improvement for New Jersey Turnpike Interchange 14A: A Case StudyBy Sarah Ramp, Daniel V. Cacciola, Justin Labrozzi, Shafiq I. Siddiqui, Faisal Ahmed
"Construction of embankments up to 34 ft in height for twelve ramps and roadways needed for the New Jersey Turnpike Interchange 14A project required ground improvement. The subsurface conditions, cons
Jan 1, 2017
-
High Capacity Piles In The Hamilton Bayfront AreaBy C. D. Thompson
Pile load test programs were carried out in 1984 and 1985 at Stelco's and Dofasco's Steel Making Plants in the Hamilton Bayfront area. 323.9 mm outside diameter by 9.5 mm wall thickness Grad
Jan 1, 1987
-
Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case StudyBy Carl-Oscar Nilsson, Åke B. Nilsson
"The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the
Jan 1, 2016
-
Open Well Caissons Of A 1917 Railroad Bridge: How 19th Century Construction Can Influence 21st Century ConstructionBy Alan D. Fisher
Amtrak made a decision to replace an aging bascule bridge with a vertical lift bridge for their crossing of the Thames River in New London, Connecticut. The new lift bridge occupies the same alignmen
Jan 1, 2013