  • CIM
    Numeric Model of a Cemented Rockfill Span Test at the Turquoise Ridge Mine, Golconda, Nevada, USA

    By D. R. Tesarik

    Researchers from the National Institute for Occupational Safety and Health (NIOSH)1 and engineers from Placer Dome, Inc.2, conducted an underground rockfill span test at the Turquoise Ridge Mine near

    May 1, 2007

  • CIM
    Development of a Two-Stage Middlings Circuit at Inco's Clarabelle Mill PART 2: On-Site Pilot plant Testwork and Full Plant Implementation

    By A. Bouchard

    "Based on laboratory testwork, a two-stage cleaner / re-cleaner circuit with feed regrind was proposed to replace an existing single-stage middling circuit treating a scavenger concentrate at Inco’s C

    Jan 1, 2001

  • CIM
    Column Flotation Experience at the Sarcheshmeh Copper Mine

    By S. Banisi, M Nesari, J. A. Finch, N. Nobari, H. Javani

    "The flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. Mechanical flotation cells are used in all sta

    Jan 1, 2000

  • CIM
    The Precipitation of Copper from Mine Waters at Britannia Mines, B.C.

    By F. Ebbutt

    The copper-bearing waters now treated successfully at Britannia for the recovery of their copper content are almost entirely derived from what is known as the Fairview mine; this was the first extensi

    Jan 1, 1928

  • CIM
    Hazard Map Approach Using Space-time Clustering Analysis of Mining-induced Microseismicity

    By Pavel Vasak

    Microseismic monitoring has become standard practice in the mining industry as a ground control monitoring tool at depth. Translating the information into practical hazard assessment tools for the roc

    May 1, 2004

  • CIM
    Model of Rock Mass Destruction in Conditions of Exploitation of a Copper Ore Deposit

    By J. Dubinski

    Underground mining of copper ore in the Legnicko-Glogowski Copper District basin generates a number of seismic events, whose energy often exceeds 108 J (Butra, 2010). The number of tremors and their l

    Aug 1, 2013

  • CIM
    Development of the Twin Metals Minnesota Flowsheet Incorporating the Platsol™ Process

    By G. Barr

    "The Polymetallic Twin Metals Project deposits in Northern Minnesota are being developed by Twin Metals Minnesota. Amongst the flowsheet alternatives being examined at a prefeasibility study level is

    Jan 1, 2012

  • CIM
    Numerical Investigation of Seismic Events Associated With Hydraulic Fracturing

    By M. B. Dusseault, A. Pirayehgar

    "There is concern that hydraulic fracturing (HF) near an existing critically stressed fault could trigger slip and generate a seismic event of significance. To this end, a mathematical discontinuum mo

    Jan 1, 2015

  • CIM
    High resolution magnetic anomaly maps from ERLIS compilation: An example from Kirkland Lake

    By S. Manning, W. Morris

    Mineral exploration assessment file information has long been considered a useful resource for developing mineral exploration strategies, and one of the most common data sets fled in assessment report

    Jan 1, 1997

  • CIM
    Accounting for Risks in Economic Evaluation of Gold Mining Projects in Ghana ? A Case Study

    By Peter A. Eshun

    This paper studies two methods that account for risks associated with gold mining projects such as mineral risks and country risks. The first method is sensitivity analysis, which investigates the eff

    May 1, 2004

  • CIM
    Cyanide Analysis for Complex Cyanide Solutions (CIM Journal | Vol. 4, No. 2)

    By W. van der Merwe

    ABSTRACT With the gold industry processing more complex ores, the online measurement and control of cyanide addition to the gold leaching circuit has become more critical. This paper compares the two

    Jan 1, 2013

  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • CIM
    Stochastic Simulation Model for a Long Distance Sand Transportation Process

    By J. Kang

    Large-scale land reclamation has been undertaken in Singapore since the 1960s. In the early years, the fill materials excavated from the hills. In recent years, sea sand is the main source of the fill

    Aug 1, 2013

  • CIM
    Pugging-curing Process: Uranium Recovery Model In Orano Mining Somaïr Plant

    By V. Bruned, K. Mohamed, A. Michaut

    Orano Mining Somaïr uranium treatment plant (Niger) uses a pugging-curing process to leach uranium. Sulfuric acid, nitrates and water are added to the finely grinded ore in a rotary drum to leach uran

    Jan 1, 2020

  • CIM
    Carbothermal Upgrading of the Awaso Bauxite Ore using Waste Polypropylene as Reducing Agent

    By F. Awotwe-Appiah, P. Koshy, A. Y. Fosu, J. Dankwah, J. R. Dankwah

    Ghana currently exports its bauxite raw without any value addition. Gradual depletion of high grade bauxite (with high alumina content) and the emergence of low grade bauxite (with high iron oxide con

    Jan 1, 2015

  • CIM
    CANMET'S thermodynamic ventilation network program

    By M. K. Gangal, M. A. Stoakes, A. E. Hall

    "The major features of the CANMET thermodynamic mine ventilation network program, developed by the Mining and Mineral Process Engineering Department of the University of British Columbia for the Canad

    Jan 1, 1982

  • CIM
    Zinc Electrowinning - Operating Data

    By M. Moats, J. A. Gonzalez

    A review of operating practices in zinc electrowinning plants is presented in this paper. Surveys were sent to several zinc electrowinning plants and data provided by some of these plants was compiled

    Jan 1, 2008

  • CIM
    CO Oxidation Activity and Temperature-Programmed Reduction Study of Au/CuZnOx Catalysts

    By Stephen J. Roberts

    Gold catalysts were prepared on co-precipitated, calcined copper oxide - zinc oxide support by an inverse deposition-precipitation method. These catalysts were characterised by X-ray diffraction (XRD)

    Oct 1, 2003

  • CIM
    Suggested Criteria for the Custody Transfer Design of Automatic Installations

    By K. H. Kretzschmar, M. A. Smith

    A brief review of the rapid growth of ACT in Western Canada is presented. It is remarked that this rap-id growth has been accompanied by a heterogeneous approach to design. A more rational and consist

    Jan 1, 1960