Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Roscommon Quarry - An Upgrade of the Comminution Circuit: The Installation of a Nordberg 7ft Symons and HP 300 Cone Crusher

    In line with DML Resources continual forward management policies, the Roscommon Quarry operation has recently installed and commissioned a Nordberg 7 ft Symons cone crusher and a HP 300 cone crusher.

    Jan 1, 1994

  • AUSIMM
    High Speed Development Work at Emperor Mine, Vatukoula, Fiji

    With the exhaustion of orebodies close to the main haulage shaft of the Emperor mine, an increased rate of development, aimed at earlier investigation of values disclosed by exploration drill holes ha

    Jan 1, 1966

  • AUSIMM
    Boddington Gold Mine - An Example of Sustaining Gold Production for 30 Years

    By G Veillette, B Parker, S Hart

    This paper provides a history of the challenges that were experienced while treating both the clayey oxide gold ores and the supergene copper-gold ores at the Boddington Gold Mine during the period 19

    Jan 1, 2007

  • AUSIMM
    Development of a Froth Dropback Measurement Device

    Development of a Froth Dropback Measurement Device

    Sep 13, 2010

  • AUSIMM
    Blast Design and Vibration Control at Kayad Lead-Zinc Underground Mine

    By P S. Jaitawat, M Sarim, M P. Roy, P K. Singh, A Joshi

    Mining is being carried out using the sublevel open stoping method at the Kayad underground mine. The mine will ultimately reach a depth of 390 m. Kayad village is only 100 m (horizontally) from the u

    Aug 24, 2015

  • AUSIMM
    Transcending the Mining Discipline Divide – Multidisciplinary, Interdisciplinary or Transdisciplinary?

    By J Coombes

    "In today’s challenging climate of reduced staffing, limited funding and uncertain markets, we are called on to operate more productively and ‘be more innovative’. As an industry, we are quick to iden

    Mar 8, 2016

  • AUSIMM
    Case Study Assessing Alternative Data Collection Techniques and Analysis Methods to Assist with Geotechnical Slope Design

    By C Bellia, A Maldonado, S Strong, H Baxter

    This paper discusses the technical and cost benefits of alternative data collection techniques used to collect lithological information, obtain laboratory testing samples and perform in situ testing.

    Jul 13, 2015

  • AUSIMM
    Design of the Second Block Cave at Northparkes E26 Mine

    The pressure of low commodity prices forced the design process for the second lift of Northparkes E26 Mine to adopt a continuous improvement philosophy. The emphasis was to minimise capital expenditur

    Jan 1, 2001

  • AUSIMM
    Description of the Shear Stree Distribution around and Excavation at WIPP

    The estimation of the shear stress distribution around an excavation is important to the design of the excavation since shear stresses can generate cracks, loosen grain boundaries or otherwise degrade

    Jan 1, 1998

  • AUSIMM
    Sand Mining Restoration on the Swan Coastal Plain using Topsoil – Learning from Monitoring of Previous Rehabilitation Attempts

    By E J. B van Etten

    This paper reports on the results of several years of monitoring rehabilitation at a silica sand mine on the Swan Coastal Plain, south of Perth. Mining here occurs below the regional watertable and le

    Oct 5, 2011

  • AUSIMM
    Geophysical blasthole sampling

    By C Simpson, J Market

    The process of sampling blasthole cones utilising personnel to manually shovel material into sample bags is a long-standing industry accepted process. However, this method has several drawbacks, inclu

    Nov 8, 2021

  • AUSIMM
    The Action of Soda on Aluminosilicate Refractories

    The corrosion of aluminosilicate refractories by soda from three different sources has been studied by microscopic methods. Sodium sulphate from oil ash, sodium chloride used in glazing structural cla

    Jan 1, 1964

  • AUSIMM
    Nyrstar Port Pirie Redevelopment

    By B Kretschmer, G Bartel, B de Villiers, W Watt

    "The Nyrstar Port Pirie Smelter, located on the eastern shore of the Upper Spencer Gulf in South Australia 230km north of Adelaide, began operation in 1889 to process lead concentrate from the Broken

    Sep 7, 2015

  • AUSIMM
    A Non-Linear Programming Model for Open Pit Mine Equipment Selection

    In mining industries, materials loading and handling costs represent a significant component of the total (capital and operation) costs. A variety of methods have been applied in surface mine equipmen

    Dec 6, 2010

  • AUSIMM
    Investigating the Sensitivity of Different Estimation Techniques over Block Dimensions

    It cannot be said that accurate and reliable ore reserve estimation is the fundamental of any mining operation success. Estimation techniques which are used to estimate the grade distribution of an or

    Dec 6, 2010

  • AUSIMM
    Findings from a transient electromagnetic trial for heat-affected coal

    By H J. Stedman

    A Transient Electromagnetic (TEM) geophysical survey was trialled in Bowen Basin Permian coal measures overprinted by Cretaceous intrusion. The trial’s intention was to compare whether TEM could asses

    Sep 20, 2017

  • AUSIMM
    Cost Model of the Leigh Creek Coalfield

    The Leigh Creek Coalfield is owned and operated by the Electricity Trust of South Australia to supply fuel to the Northern Power Station. To supply electricity at lowest cost, a costing and decision

    Jan 1, 1990

  • AUSIMM
    The Tifalmin Porphyry Copper Gold District, Star Mountains, Western Papua New Guinea

    By L D. Queen

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Tifalmin porphyry copper district is located in the Star Mountains roughly 35 km north-

    Mar 18, 2015

  • AUSIMM
    Low pH Trial in the Ernest Henry Mining Copper Rougher Flotation Circuit

    By H Sofatzis, J Kinal, J Siliezar, B Kirkwood

    Ernest Henry Mining (EHM) is a copper, gold and magnetite mining and processing operation located 38 kilometres north east of Cloncurry in the Mount Isa - Cloncurry mineral district of north west Quee

    Jul 15, 2013

  • AUSIMM
    Quantification and Controls on as Distribution in Westland, NZ

    By D Craw, J Pope

    The Greenland Group, Westland, can be characterised with respect to environmental issues by the application of a GIS database (DAME), and specific sampling campaigns. Waters draining gold mineralised

    Jan 1, 2006