Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mid Sampling and Reserve Estimation Practice in the Base Metal Orebodies

    The Mount Isa mine in North West Queens- land produces a total of nearly 10 million t/yr from separate copper and silver lead zinc orebodies. Sampling information is mainly obtained from diamond dr

    Jan 1, 1987

  • AUSIMM
    MMG Century Mine, A Case Study – Maximising Project Net Present Value Through Targeted Capital Expenditure and Process Optimisation Against a Backdrop of Falling Metal Prices and Feed Grades

    By R Wynn, T J. Akroyd, C Costa

    In an environment of lower zinc prices, falling revenues and reducing zinc feed grades, Century mine implemented a fast-tracked capital upgrade program in less than 15 months. The program was designed

    Sep 1, 2014

  • AUSIMM
    Geological Modelling of a Stoping Block at BHP's Cannington Ag-Pb-Zn Mine

    Production of oic at BHP Minerals Pty Ltd's Cannington Mine commenced in May 1997. The initial sloping blocks at the [nine are located in the upper part of the Footwall Lead lode, and the Hangi

    Jan 1, 1997

  • AUSIMM
    Pressure Filtration of Hellyer Concentrates

    By Francis R. S, Campbell J. J

    Aberfoyle's Hellyer Division has filtered very fine flotation concentrates using two different makes of pressure filter. At the Luina concentrator a Larox pressure filter was used to treat a c

    Jan 1, 1989

  • AUSIMM
    Sampling Surficial Sediments of a River Receiving Minewater Discharges

    By Adeloju S, McQuade CV, Riley SJ

    Metal contamination of sediments can be an issue for minesites discharging water. Water sampling of receiving waters is frequently undertaken. Sampling and analysis of sediment is less common. The var

    Jan 1, 1998

  • AUSIMM
    Understanding ore heterogeneity and effective bulk ore sorting using PGNAA/PFTNA

    By S Ferguson, G Noble

    The mining industry is facing economic pressures to treat more challenging and lower grade ore types, as well as pressure relating to environmental impact and social license to operate. Preconcentrati

    Nov 10, 2020

  • AUSIMM
    Ground support in strongly foliated and faulted rocks at Woodlawn Mines, NSW

    The Woodlawn base metal sulphide deposit, located 50km S of Goulbum, New South Wales, was mined as an open pit operation for 10 years from 1977, producing 8 million tonnes of ore. Underground developm

    Jan 1, 1990

  • AUSIMM
    Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground Mine

    By L Sandery, S Light

    Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w

    Mar 24, 2014

  • AUSIMM
    The Kinetics of Ilmenite Leaching in Hydrochloric Acid

    The production of synthetic rutile from ilmenite using hydrochloric acid leaching is investigated. Previously published data is used to comment on the optimum process conditions. It is shown that the

    Jan 1, 2001

  • AUSIMM
    The Iron Ores of Yampi Sound, Western Australia

    By Edwards A. B

    Yampi Sound is a small channel in the Buccaneer Archapelago (latitude 16° 10' S.; longitude 123° 40' E.), on the northern coast of Western Australia (Fig. 1), about 90 miles north

    Jan 1, 1938

  • AUSIMM
    A Study of Floor Heave in the Mines of the Southern Coalfield of New South Wales by Two Dimensional Finite Element Modelling

    By Seneviratne SP

    The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. A

    Jan 1, 1992

  • AUSIMM
    Application of Computer Graphics in Mine Design

    By Van Barnefield J G

    This paper is based on an evaluation project engaged upon jointly by Mount Isa Mines Limited nnd" IBM Austra]ia Limited. Mount Isa Mines Limited produces most of its copper from large underground o

    Jan 1, 1977

  • AUSIMM
    Implementation of a New Leaching Approach for the Treatment

    By S Ellis, J McMullen, M Habner

    A new leaching regime was implemented at Kalgoorlie Consolidated Gold MinesÆ (KCGM) Gidji plant on a cyanide leach of ultra-fine ground sulfide concentrate. High lime concentration and lead nitrate we

    Jan 1, 2005

  • AUSIMM
    From Target Generation to Two Billion Tonnes in 18 Months ù The Re-Invention of the Chichester Range

    By D A. Kepert, D Clark

    During early 2004, Fortescue Metals Group (FMG) began an aggressive exploration and drilling program in the Chichester Range, targeting iron enrichment developed in the Nammuldi Member at the base of

    Jan 1, 2005

  • AUSIMM
    International Mining Investment - Factors Affecting Country Selection\

    By Smele J. S, Dawes W. D

    In recent years there has been a trend among mining companies to diversify exploration and development away from the countries that have dominated mining activity for the latter half of this centur

    Jan 1, 1997

  • AUSIMM
    Modular SAG mill discharge trommel for maintenance flexibility and performance

    By K Katov, S T. Ciutina, J D. Pyke

    The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s

    Aug 29, 2018

  • AUSIMM
    Application of High-resolution Seismic Reflection Surveys to Exploration for Blind Vein Systems at the Cracow Low-sulfidation Epithermal Field

    By J Cook, S Pike, D Pridmore

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The application of high-resolution seismic reflection to map structure and/or mineralisatio

    Mar 18, 2015

  • AUSIMM
    Aluminosilicate Inorganic Polymers from Waste Materials

    By D S. Perera, P Wal, D C. Southam, J L. Lowe

    The Cooperative Research Centre for Sustainable Resource Processing (CSRP) is undertaking a large research project involving partners from industry, universities and government, which aims to develop

    Jan 1, 2006

  • AUSIMM
    Durability Planning for Underground Infrastructure

    By D Wimpenny

    Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur

    Mar 8, 2011

  • AUSIMM
    Hydromechanical Processes During In Situ Coal Gasification

    By J Liu

    In situ coal gasification is a method of extracting a high proportion of the energy value from coal without the need for mining. In situ conversion of coal to combustible gases is achieved by drilling

    Jan 1, 2004