Implementation of a New Leaching Approach for the Treatment

The Australasian Institute of Mining and Metallurgy
S Ellis J McMullen M Habner
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
5
File Size:
190 KB
Publication Date:
Jan 1, 2005

Abstract

A new leaching regime was implemented at Kalgoorlie Consolidated Gold MinesÆ (KCGM) Gidji plant on a cyanide leach of ultra-fine ground sulfide concentrate. High lime concentration and lead nitrate were used to overcome the refractoriness of the fine sulfides (high reactivity of fine sulfides with the presence of gold tellurides). The leach pretreatment stage was shown to be detrimental and was shut down. Lime titration was introduced as part of the process control. It was shown that the leach could be performed at low dissolved oxygen, (ie 3 - 5 ppm) to avoid sulfide oxidation and the associated high cyanide and lime consumption. Plant results showed reduced cyanide consumption (40 per cent) and an accelerated leaching rate, whereby most of the gold was dissolved in 24 hours compared to 72 hours used previously. Similar work was performed at KCGMÆs Fimiston plant, which leached a combined ultra-fine ground sulfide concentrate along with the slimes fraction from hydrocycloning the bulk flotation concentrate. The use of lead nitrate, high lime and carbon-in-leach generated a faster leaching rate and minimised adsorption of gold on fine pyrite particles. The grind, previously controlled with a P80, was replaced by a P98 to give a better operational indication of top size hydrocyclone performance. Before the implementation of the changes, average leach residues for slimes and UFG were respectively 4.0 g/t and 5.5 g/t. With the modifications to the leaching regime, average leach residues were lower by 1.5 - 2.0 g/t. Whilst significant improvements have been demonstrated, further work is progressing at KCGM to further reduce ultra-fine concentrate leach tail grades, and also to improve the understanding of concentrate refractoriness and the factors responsible for differences between laboratory and plant leach results. Estimated profits since the implementation of the new approach are in the range of $A3.5 million per year.
Citation

APA: S Ellis J McMullen M Habner  (2005)  Implementation of a New Leaching Approach for the Treatment

MLA: S Ellis J McMullen M Habner Implementation of a New Leaching Approach for the Treatment. The Australasian Institute of Mining and Metallurgy, 2005.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account