Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Updating the Lucky Friday Mill – Experiences in Revamping a Historic Milling OperationBy Dale Dean, Bill Hancock, Raul Mondragon, Carlos Aguilar, Chris Martin
"In 1942, commercial mining operations began in what is now the Lucky Friday Ag/Pb/Zn mine in Idaho’s Silver Valley. Wholly owned since 1962 by Hecla Mining Company, the mine has produced more than 14
Jan 1, 2011
-
Managing SOE Construction Risk through Design-Build SystemsBy Rob Jameson
"The demand for commercial and residential construction has continued to evolve across the United States over the last decade. Our markets demand larger, deeper and inherently more complex structures,
Jan 1, 2017
-
Risk-based approach to setting of flyrock danger zones for blast sitesBy P. A. Davies
Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 11pp., 15 refs. Hazards s
Aug 1, 1995
-
Successful Treatment of Complex Feeds through the Isasmelt™ and Albion Process™By S. Nikolic, G. M. Stieper, D. P. Mallah, B. J. Hogg, P. B. Voigt
Copper feed materials processing is becoming more challenging, due to an incremental increase in the mineralogical and compositional complexity of these feeds. These complex and polymetallic feeds are
Jan 1, 2019
-
Water Treatment Upgrade at Sepon MineBy D McClelland, R Whittering
Minerals and Metals Group (MMG) subsidiary Lane Xang Minerals Ltd operates a single site copper and gold mine near Sepon in Lao PDR. Gold production commenced in 2002 and first cathode copper producti
Jan 1, 2009
-
Time-dependent behaviour of Tournemire argillites (France)By A. Rejeb
ABSTRACT: This paper contributes to the study of underground structures in argillaceous media, especially Tournemire argillites (Aveyron, France). The basic results obtained over six years in two expe
Jan 1, 2003
-
Large Scale Lateral Testing Of Pile Foundations (Young Professor Paper Competition 2010)By Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Improvements in Flotation Cell Maintenance, Power Consumption and Operation at South32 CanningtonBy M Bird, B Oats, M Sganzerla
Mining operations are continually aiming to reduce operating costs to improve plant profitability. One way in which the Cannington operation sought to achieve this was by increasing the wear life and
Sep 7, 2015
-
Design of Merensky Reef Crush PillarsBy B. P. Watson
The Bushveld platinum group metal deposits are two distinct, shallow-dipping stratiform tabular orebodies which strike for many hundreds of kilometres. Mining is extensive, with depths ranging from cl
Jan 1, 2010
-
Steel H-Section Piles Support 2,120-Foot Long Cable Stayed Bridge Verona Island And Prospect, MaineBy James W. Weaver
The 2,120-foot long cable stayed Penobscot Narrows Bridge that carries US Route 1 over the Penobscot River between Verona Island and Prospect, Maine is supported on four foundation units, one below ea
Jan 1, 2011
-
Subsidence Prediction Using a Laminated, Boundary-Element ProgramBy Keith A. Heasley, Timotlly M. Barton
Historically, the surface subsidence over underground coal mines has been predicted using empirical profile or influence functions which have little or no connection to the actual mechanics of the sub
-
Kinetics and Mechanism of Reduction in Composite Iron Ore - Reductant PelletsA composite iron ore-reductant pellet is a mixture of fine iron ore and fines of coal/char/coke, bonded at essentially room temperature with sufficient green strength for subsequent handling. In iro
Jan 1, 1999
-
Case History - Augered Cast-In-Place Piling Installed Into Weathered SandstoneBy Edwin W. Meyer
The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560
Jan 1, 2006
-
Contamination of Samples for Analysis When Using Ring Grinder MillsOre samples generally require preparation before analysis. Serious problems can occur with contamination degradation and particle size effects. Both grinding element contammation and sample cross cont
Jan 1, 1978
-
Design & Construction Of Pile Foundations For A Building Complex - A Case HistoryBy S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
Commissioning and Ramp-up of the Albion Process at the GPM Gold ProjectBy M Hourn, D Turner, P Voigt, D Mallah
The GPM Gold Project is located in Armenia, and consists of an open cut mine at Zod, near the Azerbaijan border, and a CIL processing plant at Ararat near the Turkish border. Mining at Zod commenced i
Sep 7, 2015
-
Disc Cutter Performance in Boulder-Laden Ground ? IntroductionBy D. S. Kieffer
Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl
Jan 1, 2008
-
Observations on the 2005 PDAC ConventionBy Bruce Geller
The 2005 Prospectors and Developers Association of Canada (PDAC) convention continued the upbeat mood found in 2004. The global mining industry is booming due to higher commodity prices in nearly eve
Jan 1, 2005
-
Quality Dimensions of Mining’s Best Practice Hearing Protection DefinedBy Johan F. W. Kock
"Hearing loss due to excessive noise exposure is the most prevalent industrial disease. It is ranked on the World Health Organization’s (WHO) priority list for major work related injuries. Uncontrolle
Jan 1, 2003
-
Performance Of A Soft Ground Tunnel On The Washington MetroBy Edward J. Cording, William H. Hansmire
INTRODUCTION The Washington Metro, a rapid transit system that will serve the District of Columbia, Virginia, and Maryland, has been under construction for about two years. Construction of the Metr
Jan 1, 1997