Commissioning and Ramp-up of the Albion Process at the GPM Gold Project

The Australasian Institute of Mining and Metallurgy
P Voigt M Hourn D Mallah D Turner
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
13
File Size:
1059 KB
Publication Date:
Sep 7, 2015

Abstract

The GPM Gold Project is located in Armenia, and consists of an open cut mine at Zod, near the Azerbaijan border, and a CIL processing plant at Ararat near the Turkish border. Mining at Zod commenced in 1976, and focused on near surface oxide ores, which overlay deeper refractory sulphides. Historical mining has now almost depleted the oxide ores, and the sulphide content of ore delivered to the processing plant at Ararat is increasing. Gold and silver recoveries through the Ararat plant were declining steadily.GeoProMining, the owners of the project, have expanded the Ararat facility to deal with the increasing sulphide content in the ore. In 2014, GeoProMining refurbished an existing concentrator on site to recover a sulphide concentrate from the ore, and have constructed an Albion ProcessTM plant to oxidize the refractory concentrate. Glencore Technology (GT) provided the Albion ProcessTM plant as a technology package.In July 2014, the progress of the GPM Gold Project Albion ProcessTM Plant was reported (Hourn, Voigt and Turner, 2014). At the time of writing, the construction of the plant was nearly complete. This paper presents an update of project progress, covering commissioning and ramp up of the GPM Gold Project.The commissioning phase occurred over June to August 2014, which included an M3,000 IsaMillTM fine grinding plant, a 6 tph limestone milling plant, a 60 tpd vacuum pressure swing adsorption oxygen plant, a 10 m residue thickener and a 12 tph Albion ProcessTM oxidative leach plant. Since commissioning was completed, ramp up occurred over the following three months with downstream gold recoveries from cyanide leaching reaching over 98%.CITATION:Voigt, P, Hourn, M, Mallah, D and Turner, D, 2015. Commissioning and ramp-up of the Albion Process at the GPM Gold Project, in Proceedings MetPlant 2015, pp 207–219 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation

APA: P Voigt M Hourn D Mallah D Turner  (2015)  Commissioning and Ramp-up of the Albion Process at the GPM Gold Project

MLA: P Voigt M Hourn D Mallah D Turner Commissioning and Ramp-up of the Albion Process at the GPM Gold Project. The Australasian Institute of Mining and Metallurgy, 2015.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account