Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Oil Shale Mining (2ba3ecf3-0cd7-4a79-b839-209bf44d1da9)By Clifford B. Farris
Introduction Shale Mining Problems The mining problems an oil shale operator will face are largely determined by the process. Candidate oil recovery processes are surface (above ground processin
Jan 1, 1980
-
Special Shotcrete to Improve Open-Type TBM Performance Under Difficult ConditionsBy Sohta Takatsu, Hachiroh Mizubata, Shigeki Kudoh, Kazuya Takekuni, Yoshinori Yamada
A special type of shotcrete is used to improve the performance of open-type TBM in difficult situations. The Hakamagoshi and Johana tunnels are expressway evacuation tunnels of 3.2 km and 5.1 km in le
Jan 1, 2001
-
Geotechnical And Structural Design Challenges Of The Fremont Central PARK Subway For The Bart WARM Springs ExtensionBy Mitchell L. Fong
The Bay Area Rapid Transit (BART) District will be extending BART service south along an 8.7-km (5.4-mile) -long corridor in the city of Fremont, California as part of the Warm Springs Extension (WSX)
-
The Utilization Of Coarse Pre-Concentration Rejects In The Preparation Of Underground Backfills At Xstrata Nickel?s Ontario OperationsBy T. Weatherwax
As part of a strategic research initiative at UBC to design and evaluate integrated underground mining and mineral processing systems, work has been done to determine how to utilize the coarse rejects
Jan 1, 2008
-
Inability to communicate : How technical professionals cut short their management careersBy H. Richard Eisenbeis, Donna M. Watkins
Many technical professionals (tp)* desire to occupy upper level management positions. But career paths for most scientists and engineers do not extend beyond their specific disciplines. This is unfort
Jan 8, 1987
-
An Underground Concept For Oil Field Development In Offshore AreasBy Cherie H. Tilley
The possibility of drilling oil wells from underground locations is not a new concept. It bas not been cost effective for the oil industry in the past and therefore disregarded. Today's state of
Jan 1, 1983
-
Engineering Geology Of The Mica Underground PowerplantBy Douglas D. Campbell, Alan S. Imrie
INTRODUCTION Mica Dam is located on the Columbia River just downstream of the "big bend" of the Columbia, where it leaves the Rocky Mountain Trench and begins to flow southwards, approximately 85 m
Jan 1, 1976
-
Design of Large and Shallow Caverns of New York Second Avenue SubwayBy Verya Nasri
The proposed Second Avenue Subway Project in New York City is approximately 8.5 miles long, up to a depth of 120 feet beneath grade and runs the length of the eastern side of the island of Manhattan f
Jan 1, 2008
-
Treating Refractory Gold OresBy Lane White
Refractory gold ores are those from which a significant percentage of the gold cannot be recovered by conventional cyanidation. Historically, roasting has been the primary method for rendering such or
Jan 1, 1990
-
Successful Tunneling for Water Tunnel No. 3, New York City, New YorkBy Thomas P. Kwiatkowski, Joginder S. Bhore, Christopher D. Orlandi, Jose Velez
Three case histories of successful TBM tunneling for New York City Water Tunnel No. 3 are presented. The tunnels, costing about one billion dollars total, are the 5-milelong, 18'-11" OD Brooklyn
Jan 1, 2007
-
Numerical Analysis for the Prediction of Bump Prone Conditions: A Southern Appalachian Pillar Coal Bump Case StudyTwo miners were fatally injured when a pillar bump occurred during retreat mining in a southern West Virginia coal mine. The mine was operating in the Eagle seam with overmining in the No. 2 Gas and P
Jan 7, 2020
-
Rock Mass Mechanical Behavior Assessment at the Porce III Underground Powerhouse Complex, ColombiaBy Ludger Suarez-Burgoa
At the Porce III Underground Powerhouse Complex in Colombia, the observational method (Peck, 1969), was used to provide information to an underground wedge and a 2D Finite Element Method numerical mod
Jan 1, 2008
-
Brightwater Conveyance System: Ground Freezing For Access Shaft Excavation Through Soft GroundBy Joseph M. McCann
The Brightwater regional wastewater treatment facility, under construction in King County, WA, includes an extensive conveyance system that will feature deep, soft-ground tunnels and shafts. Excavatio
-
The Development And Commercialization of The Hicom High Intensity Grinding MillBy T. A. E. Breen
A new high intensity grinding technology has been developed and is now being commercialized by Hicom International of Australia. This has led to the development and manufacture of Hicom 120 grinding m
Jan 1, 1999
-
Estimation Of Incremental Haulage Costs By Mining Historical Data And Their Influence In The Final Pit Limit DefinitionBy R. Benito
This paper describes the application of modern data-analysis tools, such as data mining, to determine a representative cost driver for haulage activity. This cost driver was subsequently used to trace
Jan 1, 2008
-
Carbon Black Production From Waste TiresBy B. P. Faulkner, M. Weinecke
Svedala started a development program in 1997 to develop a process to convert waste tires into valuable commodities. A review of numerous approaches revealed short-comings in the various approaches
Jan 1, 2001
-
Technical And Commercial Benefits Of Gearless Mill Drives For Grinding ApplicationsBy M. Ahrens, J. Gonser
Gearless mill drives are a well established solution for grinding applications in the minerals and mining industries. The paper describes the functionality and technical features of such drive systems
Jan 1, 2007
-
Shaft Construction in Toronto Using Slurry WallsBy Vince Luongo
PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located just north of Toronto, Ontario, Canada will see the construction of a tunnel extending a
Jan 1, 2007
-
UK Seabed Resources - Sustainably Developing Deep Sea MineralsBy Ralph Spickermann
UK Seabed Resources (UKSR) signed a manganese nodule exploration contract with the International Seabed Authority on 8 February 2013 for a 58,000 km2 tract on the eastern edge of the Clarion Clipperto
Sep 1, 2014
-
Effect of mine water on the stability of underground coal mine roadwaysBy H. Takamoto, M. Ichinose
"The basic objectives of mine roadways are to provide sufficient cross sections in order to meet the needs of accommodation of equipment, transport, personnel travel and ventilation. However, many roa
Jan 1, 2011