Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    North 27th Street ISS Extension: Unique Owner/Contractor Agreement Settles Major Disputes

    By Donald J. Olson

    The North 27th St. ISS Extension tunnel will, under present plans, be the last constructed section of Milwaukee Metropolitan Sewerage District?s (MMSD?s) existing deep tunnel system. The 6.5 m (21 ft)

  • SME
    Toward a Mine-Wide, Real-Time, and Autonomous Geotechnical Change Detection, Monitoring, and Prediction Framework for Underground Mines

    Adverse ground behavior events, such as convergence and falls of ground, are some of the most significant challenges and hazards in underground mines. Our goal is to work toward mine-wide, digital, an

    Jul 28, 2020

  • SME
    Annual Review 2004 – Mining Review

    By P. A. Plunkert, D. E. Morse, L. McCartan, J. F. Papp

    The mineral sector is a fundamental part of the U.S. economy. It contributes to the real gross domestic product (GDP) at several levels — basic (mining), intermediate processing, manufacturing of fin

    Jan 1, 2005

  • SME
    San Vicente Pipeline Tunnel?Reach 4W, 3, And 2: Case History

    By Michael Jatczak

    The San Vicente Tunnel Project is an 11-mile water tunnel constructed for the San Diego County Water Authority. One of the many challenges of the project included tunneling a 22,000-foot single-headin

  • SME
    Design And Development Of The Northeast Layback Of The Betze-Post Open Pit

    By Nick Rose, Robert Sharon, Mark Rantapaa

    Development of the Northeast Layback of Barrick’s Betze-Post open pit commenced in June 2000 and was successfully completed to a height of 400m (1,300 ft) in January 2003. Following a brief exploratio

    Jan 1, 2005

  • SME
    Butte: A World Class Ore Deposit

    By Steve J. Czehura

    The Butte quartz monzonite is the host rock for early porphyry copper style mineralization and subsequent mesothermal-epithermal, enargite-gold style veining that transects the district. The east-west

    Jan 1, 2006

  • SME
    Professional Project Management in Mine Construction

    By F. G. Crack, R. V. Ramani, R. L. Frantz

    Management for mine construction and development differs from that needed for routine mine production and maintenance. An integrated approach to managing mine development projects must consider contra

    Jan 7, 1982

  • SME
    The Significance Of Filter Cake Pore Structure As Determined By Micro-Ct In The Analysis Of Filtration Phenomena

    By J. D. Miller, C. L. Lin

    Filtration of fine particles involves filter cake formation and removal of surface moisture by drawing air through the porous structure. Accurate assessment of the transport properties of porous medi

    Jan 1, 2002

  • SME
    Reflected Light Microscopic Study Of The Mineralogy And Textures Of Experimental Nickel Concentrate Reactions With Slag (87248e93-6ecf-4234-acf7-380e66deeac9)

    By H. Y. Sohn, R. D. Hagni, M. K. Kojo

    Reflected light microscopy was used to study the mineralogy and textures of experimental reactions of a nickel concentrate with a slag. Such an interaction is an important step in the bath smelting o

    Jan 1, 2001

  • SME
    The application of vertically-mounted jet fans in ventilation shafts for a rail overbuild

    By R. E. Ray

    Compared to conventional fully ducted axial and centrifugal fan systems, jet fans can offer a number of advantages for control of smoke during fire emergencies and dilution of diesel engine exhaust pr

    Jan 1, 2009

  • SME
    Feasibility And Implementation Of Shield Machine Tunnel Passing Through An Operating Airport Runway

    By Hongjie Yang

    The No. 10 metro line of Shanghai city is 36 kilometers in length and will pass through the operating airport runway by using tunnel boring machine with earth pres-sure balance mode. Although there ar

  • SME
    The circumstances, events and politics leading the closure of the U.S. Bureau of Mines ? was it the correct decision?

    By J. Harrison Daniel

    Were the legislators and politicians responsible for the closing of the U.S. Department of the Interior?s Bureau of Mines (Bureau) in March 1996 fully aware of what they were doing? Throughout the Uni

    Jan 4, 2010

  • SME
    Roof Stability Studies In The Bear Mine, Somerset, Colorado; A Case History

    By Daryl E. Radcliffe, Raymond M. Stateham

    The Bureau of Mines, under a Cooperative Agreement with the Bear Coal Company, Somerset, Colorado, conducted a large scale evaluation of the effect of time lapse on roof stability. Time lapse in this

    Jan 1, 1982

  • SME
    Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel Project

    By Stephen M. Smading

    Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w

  • SME
    The Importance Of Geologic And Geotechnical Monitoring For Improving Stability In Deep Two-Seam Longwall Layouts

    By K. Fleck

    Energy West Mining Company (EWMC) has implemented a geologic program for improving stability and support requirements along deep two-entry longwall gateroads at its Deer Creek Mine operations located

    Jan 1, 2012

  • SME
    Up-to-date Excavation, Support, and Lining Solutions Meet Timing Requirements for the First Two Tunnels of the 2006 Winter Olympic Games

    By Georgios Kalamaras, Chiaia Dinu, Platania Paolo, Alessio Carlo, Giampiero Cirvegna, Claudio Santucci

    The Project alignment initiates north of Pinerolo, along the State Road 23[S.S. 23] that is one of the principal arteries to the northwestern Alps where a number of Olympic events for the 2006 Winter

    Jan 1, 2005

  • SME
    Twin TBM with Four Cutters for Subway Station (RoppongiStation in the Tokyo Metro Line 12)

    By Susumu Uchiyama

    This machine was manufactured for excavation of the Roppongi station of the Tokyo Metro Line 12. This machine can excavate both the platform and the rail track at the same time in locations where t

    Jan 1, 1999

  • SME
    San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger Shield

    By Brett Campbell

    The San Vicente to 2nd Aqueduct Pipeline?Tunnel project is a raw water conveyance tunnel linking the San Vicente Reservoir (SVR) to the 2nd Aqueduct Pipeline via Rancho Penasquitos Pressure Control Fa

    Jan 1, 2008

  • SME
    Construction Of The North Dorchester BAY Cso Storage Tunnel In Boston

    By J. Davies

    This paper describes the successful management and construction of the 5.18 m (17 ft) diameter, segmentally lined, North Dorchester Bay CSO storage tunnel in Boston, MA. This 3,300 m (10,830 ft) long

  • SME
    Raleigh-Durham International Airport, Westside Storm Water Management Facility Project

    By L. M. Lenahan, J. D. Sheets

    INTRODUCTION The Raleigh-Durham International Airport (RDU) in North Carolina is the fourth largest airport in the southeast region of the United States. The Raleigh-Durham Airport Authority is cur

    Jan 1, 2005