Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
CSM-USBM Rotary Cutting Machine: Research Capabilities And Trials For Improving The Performance Of Tunnel, Shaft And Raise Boring MachinesBy Levent Ozdemir, Robert J. Evans, Russell J. Miller, William Sharp
This paper describes the specifications and capabilities of a 6 ft (1.83 m) diameter laboratory rotary cutting machine which was designed and fabricated under a Bureau of Mines (USBM) contract awarded
Jan 1, 1983
-
Chemical And Biological Cyanide Destruction And Selenium Removal From Precious Metals Tailings Pond WaterBy K. R. Gardner, P. B. Altringer, R. H. Lien, B. E. Dinsdale
The Bureau of Mines, U.S. Department of the Interior, is investigating chemical and biological decontamination of complex wastewaters such as tailings pond water containing 280 ppm CN and 5 ppm Se as
Jan 1, 1990
-
Technical Papers - Estimating Excavator Teeth Consumption RatesBy C. J. Roos
Ground-engaging tools are used to prevent damage to the main components of earth-moving equipment. These tools consist of everything from shovel teeth to replaceable drill bits to dozer wear plates. T
Jan 1, 2010
-
The Minnesota Experience — A Harbinger Of The Future For U.S. Metals Mining And Minerals Education?By W. Hustrulid
In the mid-to-late 1800’s the U.S. mining industry was on the threshold of nearly a century of golden times. Nearly every state had a prosperous and growing mining sector. The importance of the indust
Jan 1, 2004
-
Use Of Mimo Models In Spreadsheets For Control Of A Column Flotation CircuitBy K. Terhaar, K. Prisbrey
The objective was to determine operating protocols for a lead and silver column flotation cleaner, being considered for installation at Sunshine Mining & Refining Co.’s Kellogg mill in Northern Idaho.
Jan 1, 1999
-
Exploration: Both a Boom and Bust Year - 1980 Annual ReviewBy Paul Russell, M. M. Kimberley, Erick F. Welland, Louis Cope, C. C. Mosher, William M. Shepard, William C. Larson, Graham Closs
Exploration activities in 1980 felt the effects of unstable economic conditions and oscillating metal prices. In the cyclical, boom-or-bust precious metals and uranium markets, precious metals activit
Jan 5, 1981
-
Methods For Removing Arsenic From Aqueous SystemsBy L. R. Moore
Arsenic is among the list of major contaminants in mining aqueous waste streams. Though the elemental form is toxic, the aqueous oxyanions are more so. The most common forms of arsenic released duri
Jan 1, 2012
-
Evinos-Mornos Tunnel – Greece Construction of a 30 Km Long Hydraulic Tunnel in Less Than Three Years Under the Most Adverse Geological ConditionsBy Remo Grandori, Manfred Jaeger, Fabrizio Antonini, Luis Vigl
The EVINOS-MORNOS tunnel project with its 30 km of length is one of the longest hydraulic tunnel in the world realised with TBM method. The adverse geological conditions, the high cover and the sho
Jan 1, 1995
-
Preliminary Seismic Design Considerations for a Highway Tunnel in Coronado, CaliforniaBy David Young
This paper presents tunnel design considerations for the SR75/282 Transportation Corridor Project in Coronado, California. The project is managed by the City of Coronado in cooperation with Caltrans a
Jan 1, 2008
-
Micro-Price Optimization of Coal Processing OperationsBy Luttrell. G.
The profitability of coal mining operations is highly dependent on the performance of the coal blending and processing facilities. Many companies have recognized this fact and have instituted optimiza
Feb 23, 2014
-
Problems Encountered on the Upper Reach of the Northeast Interceptor Sewer ProjectBy Rajni Patel, John McDonald, Steve Dubnewych, Michael McKenna
The Upper Reach segment of the Northeast Interceptor Sewer (NEIS) is a3.2-km-long tunnel excavated in interbedded marine sedimentary deposits with approximately 40 m of cover. The tunnel was initially
Jan 1, 2005
-
Using Rock Geomechanical Characteristics to Estimate Bond Work Index for Mining Production Blocks - Mining, Metallurgy & Exploration (2021)By Omid Asghari, Amin Mousavi, Arshad Ranjbar
Geometallurgical modeling of the production benches is an attempt to estimate the geometallurgical variables of the different ore domains, which leads to a better understanding of the ore and its prop
Oct 28, 2021
-
Regional and Environmental Variability of Manganese Nodules in the Central South PacificBy David Cronan
"Most of the recent renewed interest in manganese nodule mining has been focused in the Clarion-Clipperton Zone (CCZ) in the NE tropical Pacific where nodules are rich in Mn, Ni and Cu. However, equal
Sep 1, 2014
-
Scheduling Fast-Track Tunnel Construction Projects - IntroductionBy Valerie (Wollet) Rebar
Successful execution of fast-track projects is an arduous task at best. Effective and organized management, a comprehensive technical design with an independent check-and-balance system, and optimal s
Jan 1, 2008
-
Industrial applications of the CrossFlow separatorBy P. Venkatraman
Laboratory and pilot-scale test data have shown that the innovative feed presentation of the CrossFlow separator provides improved metallurgy when compared to traditional hindered-bed or teeter-bed cl
Jan 1, 2005
-
Role Of The Tunneling MachineBy William H. Hamilton
INTRODUCTION It was not very many years ago that tunneling machine manufacturers spent considerable time trying to convince contractors and mine operators of the advantages of mechanical tunnel bor
Jan 1, 1997
-
Inpro’s Bearing Isolators Improve Bearing ProtectionA bearing isolator is a noncontact, nonwearing, permanent bearing protection device. It has a rotor and a stator, and the two are unitized, so that they do not separate from one another while in use.
Jan 1, 2004
-
New XRF Analyzer For Elemental Analysis Of Sample StreamsBy C. Bachmann, M. J. Laurila, A. J. Widenman, A. Klein
Elemental analysis of slurry streams using X-ray fluorescence (XRF) has long been employed. However, detector technology has limited the application of XRF devices. Using detector technology employed
Jan 1, 1999
-
Measurement of Overburden Failure Zones in Close Multiple-Seam Coal MiningBecause of its small interburden thickness, concentrated stress distributions, high coal seam metamorphism, and complex geological conditions, mining the five coal seams (Nos. 5, 7, 8, 9 and 12) of Ka
Jan 7, 2020
-
DREYER AWARD - How Orebodies are FoundBy J. David Lowell
The first part of this article is a review of industry techniques and styles during the past 50 years. It is followed by my career history during the same period. The second part covers my ideas abo
Jan 1, 2000