Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Practical Application Of Pile Reuse At Bow Bells House, City Of LondonBy Justin Phillips
The redevelopment of Bow Bells House in London has thrown up a number of challenges that will increasingly be faced by developers of congested sites. In the context of pile reuse this paper examin
Jan 1, 2008
-
Session 21 "Grouting in Karst"By Jim Henry
I would say mainly the cost. I showed only 3 cases. One of them was the one that Allen just described and there were two other cases. In those cases it was fairly easy to develop a solution using limi
Feb 10, 2003
-
Army Corps Megaprojects: The Benefits of Innovative FoundationsBy Dale Berner, Michael O’Sullivan
"This article focuses on lessons learned from innovative designs including in-the-wet construction methodology and modified foundation conditions, for two United States Army Corps of Engineers (USACE)
Jan 1, 2016
-
Corroboration and Remediation Options"After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga
Jan 1, 2004
-
A New Low-Cost Bi-Directional Load Test Technique for Drilled ShaftsBy Sherif Elfass, Gary Norris
Bi-directional load testing of drilled shafts has been widely adopted as a means to evaluate their load carrying capacity. However, in order to reach failure, most of these tests are carried out on s
Sep 8, 2021
-
Pile Settlement Design Using Continuous Surface Wave Testing And Modulus DegradationBy Hennie F. T. Barnard
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
-
S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From AboveBy Grischa Dette, Thomas Schröder, Holger Merski
For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b
May 1, 2022
-
Pile Settlement Design Using Continuous Surface Wave Testing and Modulus Degradation (9593f752-8bd1-4766-938c-27b4baad33f2)By Hennie F. T. Barnard, Theodore E. B. Vorster
Where geotechnical designs are governed by settlement requirements, soil and rock moduli are important parameters for design. This paper reports on a method that was used to utilize dynamic modulus me
Jan 1, 2017
-
Presentation #3 - Cross-Hole Sonic Logging And Single-Hole Sonic Logging - OutlineBy Les R. Chernauskas
? What is Integrity Testing? ? Cross-Hole Sonic Logging (CSL) ? Single-Hole Sonic Logging (SSL) ? Typical Specifications ? Case Histories ? Observations and Conclusions WHAT IS INTEGRITY T
Jan 1, 2001
-
The Bow, Encana: Design, Monitoring, And Results Of A Deep Excavation In Downtown CalgaryBy Matthew Janes
The new Bow office complex will become the new headquarters of EnCana Corporation, a leading Canadian oil and gas company. The shoring system, encompassing nearly two city blocks and excavated to a d
Jan 1, 2008
-
Bluestone Dam Safety Assurance Program: An OPA Runner UpBy Jeff Hopple
"Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en
Jan 1, 2014
-
Effect of Installation Method on the Ratio of Tensile to Compressive Unit Shaft Resistance of Piles in Dense SandBy A. C. Galvis-Castro, R. Salgado, M. Prezzi, E. Ganju, R. D. Tovar-Valencia
It is generally accepted that the unit shaft resistance of piles in sands is lower for tensile loading than for compressive loading. So far, very little attention has been paid to the influence of the
Jan 1, 2019
-
Design for Installation of Suction Piles in Sand Deposits for Mooring of Floating Offshore StructuresBy Chul Soo Park, Juhyung Lee, Duhyun Baek
"In this study the preliminary design of suction pile as the supporting system of the concrete floating structures was performed at the offshore pilot project area in Korea. The suction pile of the fl
Jan 1, 2017
-
Vibrations Caused by Pile DrivingBy K. Rainer Massarsch
"Part 2 of 2 (Continued from Summer 2004 edition) By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenVibrations, which are caused by the installation of piles in dry or permeable soils, can
Jan 1, 2004
-
Effect of Sand Density on Load Sharing Mechanism of Piled Raft FoundationBy Rouzbeh Vakili, Adel M. Hanna
"The application of piled raft foundations has significantly increased during the last few years. In this system, the raft and the pile group collectively transfer the applied building load to the und
Jan 1, 2017
-
Development Of Vertical-Horizontal Yield Envelopes Of Pile Group Supported Bridges Subjected To ScourBy Aditi Sharma, Sumanta Haldar
Scouring of soil is the major concern forthe various hydraulic structures built in the flowing rivers since scouring impacts the bearing capacity of foundations. Hence, consideration of scouring in th
Sep 1, 2022
-
Cost Analysis Of Multiline Ring Anchor Systems For Offshore Wind FarmBy Junho Lee, Leopoldo Bello, Mohammad Khan
Multiline ring anchor (MRA) was developed as a cost-effective solution for securing floating offshore wind turbines (FOWTs) to the seabed. Since FOWTs are placed in arrays compared to conventional oil
-
The Realities Of Resolving Conflicts During Construction ? SynopsisBy J. S. Ward
In a well-written set of contract documents, the probability of conflicts arising during the course of construction is minimized. However, no matter how complete may be the technical language in the c
Jan 1, 2010
-
Non-Destructive Testing Of Piles - A Case History - SummaryBy Manish Kumar
One of the recent advances in the field of testing of concrete piles is the Non-Destructive testing (NDT) of piles. This paper deals with a specific project where this technique was employed along wit
Jan 1, 1996
-
St. Anthony Falls I-35W Bridge - Deep Foundation Monitoring Methods And Equipment For Bridge ConstructionBy Bryan C. Field
The proposed construction schedule for the St. Anthony Falls I-35W Bride challenged the abilities of the design-build teams to utilize the best and most efficient methods to meet Minnesota Department
Jan 1, 2009