Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Wolf Creek Dam Foundation Remediation – An Innovative SolutionBy Fabio Santillan, Lyndon Bedford
"This paper presents the main features of the Wolf Creek Dam Foundation Remediation Project, highlighting the innovative construction approach and stressing on how the collaboration between the contra
Jan 1, 2015
-
Dynamic Load Testing Of Non-Uniform PilesBy Thai Nguyen Ph. D
Dynamic Load Test (DLT) on driven piles has been performed routinely all over the world. In several recent projects, even 100% testing has become a norm where every single pile is dynamically load tes
Oct 1, 2022
-
Pile Design Using Cpt Results: The “Lpc Method”By Frederic A. Verheyde
The CPT pile design method of the ‘Laboratoire des Ponts et Chaussées’ (LPC) uses the cone resistance (qc) for the design of axially loaded piles. It was originally proposed in 1982 and was revised in
Nov 1, 2022
-
Evaluating Bending Failure Of Floating Soil-cement (Sc) Columns Under Road Embankments Using 3d FeaBy Sailesh S. Author
The current design method for soil-cement (SC) columns improved soft clayey ground under the highway embankments assumes a slip circle failure surface shearing through the columns and the soils using
-
Time-Dependent Increase In Load Capacity Of Tapered PilesBy Jeongbok Seo
This paper describes successful application of driven tapered-steel-pipe piles for two large-scale projects in the New York metropolitan area: Rego Park Mall, Rego Park, N.Y. and 164 Kent Avenue, Broo
Jan 1, 2008
-
Behavior Of Piled Raft Foundation Systems Under A Combined Set Of LoadingsBy Renato P. Cunha
The paper explores a parametric analysis of a four-pile group in contact (hence piled raft) and without contact (hence standard pile group) with the superficial soil layer, under a combined set of loa
Jan 1, 2006
-
Jet Grouting for Echo Dam Seismic RehabilitationBy Tara Schenk-McFarland, Mark Bliss
Echo Dam, located near Coalville, Utah, is a facility that provides storage for irrigation and municipal use. Original construction of the dam was completed in 1931. Because of seismic concerns, the s
Jan 1, 2017
-
Full Waveform Inversion of Cross-Hole Stress Waves for Structural Integrity Testing of Drilled ShaftsBy Joseph T. Coe, Alireza Kordjazi, Michael Afanasiev
Cross-hole sonic logging (CSL) is a common quality assurance measure for the evaluation of the structural integrity of drilled shafts. The results of CSL can be supplemented by a set of tomographic im
Jan 1, 2019
-
Meadowlands Megaproject: 9,000 Piles and CountingBy Ronald D. Boyer
"Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,
Jan 1, 2009
-
Bi-Directional Load Testing Of A Pile Bored Using Bentonite Mud In Guinea BissauBy Frédéric Rocher-Lacoste
On July 2nd, 2007, LCPC and LOADTEST performed a static loading test with an Osterberg-cell on a bored pile of 1600 mm diameter. The 56.50 meters deep test pile constructed by Trevi Spa for Soares da
Jan 1, 2008
-
A Soil Quake Davisson Offset Method For Drilled FoundationsBy Michael Perlow Jr
A modification of the original Davisson Offset Limit (DOL) is presented for drilled foundations using soil quake (QDOL) factors ranging from 2 to 6. A further modification of the Davisson Offset Limit
-
Ultimate Lateral Resistance of Piles in Cohesive SoilBy Lassaad Hazzar
The ultimate lateral resistance of piles in cohesive soil is studied using the well-known finite difference code, FLAC2D. The Modified Cam Clay (MCC) constitutive relation is adopted in the analyses t
Aug 1, 2013
-
Dynamic and Static Load Tests on Tapered Piles in Soils Exhibiting Time-Dependent Capacity GainBy Terrence M. Carroll, Chu E. Ho
"A pile installation and load testing program on driven tapered piles was undertaken at John F. Kennedy International Airport in New York City for the extension of the existing Terminal 4. As part of
Jan 1, 2015
-
Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth TransitionsBy Michael Hughes, Selva Selvamohan, Ray Costa
"Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back
Jan 1, 2015
-
Retaining Wall Installation Beneath An Existing StructureBy Kenton W. Braun
Concourse B at the Anchorage, Alaska International Airport is currently being renovated while retaining the original building structure and foundations. Part of the renovation includes the installati
Jan 1, 2008
-
Open Cell Sheet Pile® Dock In Remote Alaska Provides Innovative And Cost-Effective SolutionBy Dempsey S. Thieman
Innovative marine bulkhead design and construction techniques were used in the fast-track design and construction of a high-capacity, deep-water dock in the highly seismic region of Alaska?s Aleutian
Jan 1, 2008
-
Foundation Innovations Ensure Successful Bridge ReplacementBy Mark S. Greenleaf, Alec D. Smith, Mary Vittoria-Bertrand, Heather B. Scranton, Jean Louis Z. Locsin
"Rhode Island’s new $163.7 million, 2,265 ft (690 m) long, four-lane Sakonnet River Bridge sits just south of the existing bridge in Portsmouth/Tiverton. The bridge, a critical transportation system l
Jan 1, 2015
-
Performance Of Cast-In-Place Piles Installed With A Fixed Mast Drilling Platform In Claystone ? Glenrock WYBy Brent Wilkins
The project team was tasked with the design and installation of a deep foundation system to support an expansion to a power generating station in Glenrock WY. Cast-in-place piles installed by a fixed
Jan 1, 2009
-
PSC Piles Overcome Challenges for $650m Power PlantBy Tim Siegel, III Fondren, Billy Camp
"INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic
Jan 1, 2004
-
Drilled Shaft Design Optimization by Means of Static Load TestingBy Riad Diab
In 2018 the Caisse de Dépôt et Placement du Québec (CDPQ) awarded a $6.3 billion (U.S. dollars) design-build contract to the Joint Venture (JV) team NouvLR for the design and construction of one of th
May 1, 2022