Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Austin Gold Venture Bioleaching: Project Summary

    By J. Kuipers, R. W. Lawrence, P. B. Marchant, W. Brooks, J. T. Chapman

    "Bioleach testing and piloting was conducted on refractory gold sulphide concentrate from Austin Gold Venture in Nevada during 1988. The objective of the test programme was to determine the technical

    Jan 1, 1989

  • CIM
    Volcanological Reconstruction of the Corbet Breccia Pile, and Cu-Zn Massive Sulfide Deposit, Noranda, Quebec (4e04e1fb-2588-4997-8220-6f15481d7d28)

    By M. Labrie, H. L. Gibson, G. Doiron, J. J. Watkins, D. H. Watkinson

    The Corbet deposit is one of 17 proximal Cu-Zn massive sulfide deposits located. within the Noranda Cauldron which occurs within the core of the Noranda Volcanic Complex. The deposit is located at the

    Jan 1, 1993

  • CIM
    Design of liner plate culverts for underground mining environment

    By Roy EI. Durr, Glen R. Davidge

    "This paper presents the results of structural analyses and full-scale destructive tests conducted on liner plate culverts. The purpose of this work was to establish a design method and evaluate the s

    Jan 1, 1995

  • CIM
    Transputer and its application in the mining and process industries – a multiprocessing perspective

    By J. L. Chakravarty, S. K. Dutta, S. Banerjee, D. Putatunda

    "General purpose uniprocessor systems used in control applications, however fast they may be, at a certain stage attain saturation, forcing the user or designer to consider other avenues for solving t

    Jan 1, 1994

  • CIM
    Capping and Outlier Restriction: State-of-Art

    By Rodrigo A. Marinho

    Erratic high grade values are as common in Nature as they are a source of problems for resource estimators. In some highly erratic metal deposits, less than 2% of the drilling samples can represent mo

    Oct 1, 2009

  • CIM
    Pyrometallurgical operations at Hudson Bay Mining and Smelting Co. Ltd.

    By Anthony McDonald, Dominic Verhelst

    "Hudson Bay Mining and Smelting Co. Ltd. (HBM&S) started up a zinc plant and smelter in late 1930, employing technology of that period. The zinc plant has since converted from a roast/leach operation

    Jan 1, 1994

  • CIM
    Study of Flotation Process Variables Combining Metallurgical and Pentlandite Liberation Data

    By G. Heinrich

    Size by size recoveries and pentlandite liberation data from image analysis were used to evaluate plant tests of pentlandite flotation and pentlandite/pyrrhotite middlings flotation from pyrrhotite in

    Jan 1, 1993

  • CIM
    Assessment Methodologies For Girth Weld Defects In Pipelines

    By W. R. Tyson

    Imperfections such as lack-of-fusion and undercut are inevitable in field welding of pipelines. Above a certain size, such defects must be removed or repaired. In the present state of the art, determi

    Jan 1, 2010

  • CIM
    Use of Oxyfuel Based In-Plant Recycling Of Dust and Sludge

    By Joachim von Scheele

    An oxyfuel-based technology - OXYFINES - has been introduced for in-plant recycling. It provides fines, dust, sludge (without any drying-step) and other by-products arising in the steel and metal prod

    Jan 1, 2004

  • CIM
    Fuzzy Scheduling of Repetitive Construction Projects

    By I. Bakry

    Uncertainty is an inherent characteristic of construction projects. Neglecting uncertainties associated with different input parameters in the planning stage could well lead to misleading and/or unach

    Aug 1, 2013

  • CIM
    Testing of Pyromag TM for Energy Efficient Hot Magnetic Seperation

    By Ian Sherrell, Michael Pirie, Riddhika Jain

    "Conventionally, direct reduced iron (DRI) mixed with char from rotary furnace discharge is cooled down before separating the char via magnetic separator. The DRI must then be reheated for further dow

    Jan 1, 2016

  • CIM
    15th Supplement to Bibliography of Canadian Contributions in the Field of Rock Mechanics

    By P. E. Weidmark

    Allard, M., Hucka, V.J., Das, B., and Borchtch-Komponietz, V.I., "Investigation of seismic vibration due to large blasts in Gaspe Copper Mines"; (in Russ); The Industry of Chemical Raw Materials; Refe

    Jan 1, 1979

  • CIM
    Evidence for a Feeder Pipe and Associated Alteration at the Brunswick No. 12 Massive-Sulfide Deposit (6ba284c3-b619-4b87-9743-c3aba495d77c)

    By Wayne D. Goodfellow, William M. Luff, Steven J. Juras

    Brunswick No. 12 is a vent-proximal massive sulfide deposit that formed above a feeder pipe with associated hydrothermal alteration. Because of the replacement of bedded sulfides deposited above the h

    Jan 1, 1992

  • CIM
    New federal tax hits mining companies

    By Robert B. Parsons

    "It is quite likely that more than a handful of junior exploration companies will receive some startling news from their accountants this spring when 1989s tax returns are being prepared. These compan

    Jan 1, 1990

  • CIM
    Cross-border shopping in mining?

    By Robert B. Parsons

    "It is generally acknowledged that Canadian and foreign-based mining companies are spending relatively fewer dollars in Canada and more dollars abroad than was the case not many years ago. It is commo

    Jan 1, 1992

  • CIM
    Sequential Acid Leaching of Nickel Laterites with Iron Precipitation

    By J. D. Gillaspie, D. T. White

    "Sulphuric acid atmospheric leaching of nickel saprolite / garnierite ores was proposed in the early twentieth century, prior to the development of the pressure acid leaching process for limonite ores

    Jan 1, 2016

  • CIM
    Car benefits: fasten your seatbelts

    By Robert B. Parsons

    "One of the disadvantages of the federal government's idea of ""taxation by consultation"" is that it seems to take longer to enact new legislation. The proposed new rules for taxing automobile b

    Jan 1, 1988

  • CIM
    Effect of Core Diameter on the Bond Impact Crushing Work Index Test (Phillips Enterprises LLC, DJB Consultants, Inc, Alex G. Doll Consulting Ltd )

    By R. Phillips, A. G. Doll, D. J. Barratt

    "The Bond low energy impact (crushing) work index test is specified to be performed on rock specimens between 50 mm and 75 mm in effective diameter. NQ-diameter drill core, frequently used in mineral

    Jan 1, 2012

  • CIM
    Characterization and Reactivity in CO oxidation of Gold Nanoparticles Supported on TiO2 Prepared by Deposition-Precipitation with NaOH and Urea

    By Rodolfo Zanella

    Au/TiO2 catalysts were prepared by deposition-precipitation using NaOH (DPN) (~3 wt % Au) and urea (DPU) (~8 wt % Au), and calcined at various temperatures between 100 and 400 °C. They were characteri

    Oct 1, 2003

  • CIM
    Application of Advanced Mining Technology in Open Pit Mines for Optimizing Waste Dumping and Concurrent Land Reclamation

    By A. K. Debnath

    Mining being a site specific activity, land becomes the prime requirement for starting, successful execution and closure of any mining project. Many important mining projects are not progressing satis

    Aug 1, 2013