Recycling 'Scrap' Alumina at Alcan Arvida Works - CanadaBy H. Vermette, J. Demers, R. Leclerc, P. Bergeron, P. Hudon, A. Lessard
The Arvida Smelter marked its 80th anniversary in 2006. Arvida currently operates 6 potrooms equipped with prebaked side-feeding pots producing 160 000t of aluminum per year, requiring the supply of 3
Jan 1, 2006
-
Tax Incentives-Or Tax Problems?By R. D. Brown
"AbstractOver the past five years, tax rates in the Canadian mining industry have skyrocketed upward across Canada, as both federal and provincial governments have sought to increase their share of mi
Jan 1, 1977
-
Applying Web and Information Integration Technologies for Intensified Construction Process ControlBy E. Viljamaa
In this research, earlier developed information integration method and novel web technologies are applied to intensify infrastructure construction process control. The applied method uses semantic met
Aug 1, 2013
-
Sinking Operation at McIntyre No. 11 Shaft, Porcupine District, Northern OntarioBy H. A. Kee
In the mining industry, as in other business, one of the more satisfactory results of sincere but cheerful effort lies in the proper completion of undertakings and problems, which, to be successful, m
Jan 1, 1928
-
Study of Gold-activated Carbon Electrodes for the Production of Hydrogen PeroxideBy Philippe V. Scheers
Polycrystalline gold, glassy carbon and gold-activated glassy carbon electrodes were compared for the production of hydrogen peroxide by the cathodic reduction of dissolved oxygen. Gold was deposited
Oct 1, 2003
-
Geotechnical Analysis and Design of Leaching Heap No. 2, Meydook Copper Mine, IranBy Z. Abbasloo, A. Masoomi, L. Ebrahimi, A. Mortazavi, A. Keshavarz
"Investigation and 3D analysis of Heap no. 2 of Meydook copper complex was the subject of this study. In this project all geological and geotechnical investigations conducted in the mine were evaluate
Jan 1, 2015
-
Deformation Characteristic of a Deep-Seated Rockslide Interacting with a ReservoirBy C. Zangerl, W. Fellin, M. Holzmann, B. Hofer, S. Perzlmaier
"Four deep-seated rockslide systems were investigated and are under surveillance by TIWAG (Tyrolean hydro-electric Company) since the mid-1960s after impoundment of Gepatsch reservoir began. These roc
Jan 1, 2015
-
Collectorless and Collector-Induced Flotation of Chalcopyrite in Stockpiled Ni-Cu OresBy B. Nanthakumar
The impact of stockpile oxidation on chalcopyrite was studied through collectorless and collector-induced flotation conditions. In both cases, the Cu grade-recovery performance of stockpiled ore showe
Jan 1, 2007
-
Thermal-Mechanical FEA Modeling of Furnace Hearth Refractory for Design and Campaign Life ImprovementBy K. Chomyn, R. Veenstra, P. Zangeneh, Hatch Ltd., C. Van der Woude, H. Ghorbani
"The furnace is the heart of smelting operations, and therefore the performance, reliability, and campaign life of the furnace are critical considerations. Furnace refractory is exposed to high tempe
Jan 1, 2016
-
The Railway's Part In Coal MiningBy D. W. McDonald
Coal mining and railway transportation are so closely en-twined and so dependent one upon the other that the failure of one would mean the total collapse of the other. With this indisputable fact in m
Jan 1, 1924
-
Practical Considerations for the Use of Microseismic Systems at Mining OperationsBy Ian S. Leslie
Seismic monitoring systems for mining operations are being utilized more than ever before in the characterization of rock mass response to underground and open pit mining. This paper provides a review
Jun 1, 2012
-
Increasing Paste and Hydraulic Backfilling Efficiency Through InstrumentationBy B. D. Thompson
Many mines adopt necessarily conservative backfilling strategies due to a lack of understanding of their backfill behaviour. In the past five years, extensive instrumentation campaigns have focused on
Aug 1, 2013
-
Weathering and Degradation of Shales and MudrocksBy K. J. Aglias, M. Jeffery, J. V. Simmons, J. A. Johnston, S. G. Fityus
"Shales and mudrocks undergo weathering in the near-surface geological environment, and degradation when directly exposed at the surface. Despite having superficially similar appearances, many shales
Jan 1, 2015
-
Alternative to Improve the Traditional Chinese Copper SmelterBy S. Demetrio
China has a traditional segment of Copper Smelters with its own Chinese technology, typically small in size from 20.000 to 50.000 tCu/a, and they are responsible for the processing and production of m
Jan 1, 2007
-
McKenzie Red Lake MineBy H. Clare Horwood
"Three types of structures, the main shear zone, the north shear zone, and a series of hanging-wall fractures, contain all the orebodies so far discovered at the McKenzie Red Lake mine. Lenses and vei
Jan 1, 1954
-
Effect of Impurity and Pretreatment Conditions on the Catalytic Activity of Au Powder for CO OxidationBy Yasuo Iizuka
We have had studied CO oxidation on unsupported Au powder (mean particle size, ca.100nm) manufactured by evaporating ultra high purity gold metal (>99.99%) in inert gas and reported that it showed som
Oct 1, 2003
-
Characterizing Pitting Corrosion of 90/10 Cupro-Nickel Chiller TubesBy G. P. Gu
The in-service 90/10 cupro-nickel tubes in a water-chiller system suffered from severe corrosion damage during their relatively short service life causing unexpected down time. In addition to downtime
Jan 1, 2005
-
Fire-retardant conveyor belts: Testing and standardsBy K. J. Mintz
Conveyor belts installed in an underground mine can be a potential source of a major fire, thus the need for fife-retardant belting. A Canadian Standard, CAN/CSA-M422-M87, incorporating a small-scale
Jan 1, 1992
-
Adding Value To Lix / Sx / Ew Operations By Recovering Copper From Bleed, Raffinate And Other Plant StreamsBy E. R. Dixon
Copper SX/EW plants often bleed part of their electrowinning electrolyte to control impurities and maintain consistent cathode quality. Depending on the specific situation at each site, the bleed is e
Jan 1, 2007
-
Canadian Mining Credentials ProgramBy Barbara Kirby
Mining Industry HR Challenges Mining industry needs to hire approx. 100,000 workers by 2020 Attraction and retention of talent in all occupations Mobility of skilled workers between mine sites
May 1, 2010