Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Matching laboratory and plant performance - a case study of the Elura lead circuit, Pasminco Australia Limited

    By M. C. Pietrobon

    "A common problem in assessing the applicability of laboratory flotation data is determining how closely conditions during laboratory testing of the ore matches those that occur in a plant. Typical la

    Jan 1, 2002

  • CIM
    Research, Innovation & Reality

    By Richard Burt

    "In seeking to supply the ever increasing needs for raw materials, the mining industry has been required to develop lower grade resources in increasingly remote regions of the world. This has resulted

    Jan 1, 1999

  • CIM
    Z1600 Jameson Cell Test Rig – From Rental to Revenue

    By A. Taylor, M. Blanchette, J. Doucet

    "A Z1600 Jameson Cell Test Rig was rented for test work at Vale’s Clarabelle Mill operation. This paper discusses the evolution of renting the unit for test purposes to owning the unit and operating i

    Jan 1, 2012

  • CIM
    Outreach with Education to Link Mining and Classrooms

    By Maureen E. Lipkewich

    Education builds long term awareness, acceptance and support for responsible mineral resource development. The MABC Education Program is an award winning education partnership with British Columbia cl

    May 1, 2002

  • CIM
    Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part II Underground Transport and Stope Placement

    By Jamie Archibald

    The Department of Mining Engineering at Queen?s University conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview pote

    May 1, 2009

  • CIM
    Treatment of Non-Magnetics at Falconbridge

    By C. H. Dionne, J. A. Holmes, B. J. Huls

    "Falconbridge Limited is presently developing flowsheet alternatives for implementation at the Strathcona Mill. The main thrust for change arises from the need to reject more pyrrhotite from the conce

    Jan 1, 1991

  • CIM
    Stratified Sampling of Drill Core

    By Norman O. Lotter

    Drill core is preferred as the sample material for metallurgical and mineralogical characterisation and flowsheeting of an orebody. The question arises as to how to do this at the economic optimum, si

    Jan 1, 2010

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • CIM
    Ore Handling for the McArthur River and Cigar Lake Projects

    By Chuck Edwards

    "The development of two large, high-grade uranium projects has been proposed for northern Saskatchewan. The projects are now under review by a joint federal/provincial panel. The McArthur River projec

    Jan 1, 1997

  • CIM
    Centrifuge Units for Gravity Separation - An Update

    By André R. Laplante

    "This presentation reviews three continuous centrifuge separators, the Falcon-C, Kelsey Jig and Multi-Gravity Separator, two units with possible synergies with centrifuges, the In-Line Pressure Jig an

    Jan 1, 2000

  • CIM
    LNG Fuelling for Mine Trucks

    By Brad E. Melanson

    Because mine haul trucks consume considerable quantities of fuel, they are ideal candidates for the adoption of cleaner and cheaper fuels like natural gas. Impressive fuel cost savings will be realize

    May 1, 2006

  • CIM
    Real Time Analysis of Conveyed Bulk Materials for Optimized Plant Performance

    By H. Powell

    "This paper discusses how elemental analysis of conveyed bulk flows in real time using PGNAA (Prompt Gamma Neutron Activation Analysis) technology has resulted in significant improvements in advancing

    Jan 1, 2014

  • CIM
    Operating Experience and Developments of G-Rex and Aurix100 Resin Exchange Technology

    By Peter Richards, Alexander Lewis-Gray, Mark Davies, Nicholas Katsikaros

    "Gekko Systems developed the Gekko Resin Exchange Column (G-REX) in order to optimise the recovery of gold in complex leach-to-electrowinning processes, as an intermediate step using a highly gold-sel

    Jan 1, 2016

  • CIM
    Tribological factual data base for the mining industry

    By J. Molgaard, J. Masounave, J. Prinsen, P. Beaulieu, G. Huard

    "A study carried out on behalf of the National Research Council (NRC) indicates that economic losses due to wear in the Canadian mining industry are in excess of $700 million annually. Severe wear, ma

    Jan 1, 1987

  • CIM
    Analysis of the Influence of the Mining Sequence on a Remnant Pillar with FLAC3D

    By Shahé Shnorhokian

    Remnant pillars evolve towards the latter stages of mining in an orebody and act as repositories of mining-induced stress. It is therefore crucial to plan ahead as to their dimensions and location wit

    Jun 1, 2012

  • CIM
    All-Hydraulic Bucket-Wheel Excavators (A Synopsis)

    By Walter Durst

    On October 16, 1978, the Harnback open cut of Rheinische Braunkohlenwerke, the largest open cut ever planned, was officially put into operation. It will outperform all of the large open cuts known at

    Jan 1, 1979

  • CIM
    Data integration for information technology infrastructure in mining

    By S. Dessureault, J. Porter, M. Woodhall

    Information and communication technology (ICT) is seen as a key source of future productivity improvements in mines. The information technology infrastructure (ITI) necessary to achieve these producti

    Jan 1, 2004

  • CIM
    Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold Recovery

    By Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante

    Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c

    Jan 1, 2005

  • CIM
    Throughput and Recovery Improvements Following Commissioning of the Mount Milligan Mine

    By P. Miranda, K. Le, G. Maes, R. Peters

    "The Mount Milligan Mine, owned by Thompson Creek Metals Company Inc. (TCM), started operations in September of 2013. It is located between the communities of Fort St. James and Mackenzie and is the f

    Jan 1, 2015

  • CIM
    Mitigating Brown Field Project Risks Using Advanced Simulations

    By S. Bellec, A. Berton

    "Usually, steady state mass balances are used for the design of mineral processing plants. However, this tool does not take into account the impact of process inputs variability nor does it evaluate p

    Jan 1, 2015