Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Preston East Dome MineBy J. E. Hawley, R. C. Hart
"The Preston East Dome gold mine is in the southeastern part of Porcupine district, Ontario, 5 miles southeast of Timmins, and immediately south of the property of Dome Mines, Limited.The claims now o
Jan 1, 1954
-
The Use of Mathematical Modeling in Developing Advanced Control Systems for Mining Industry ProcessesBy J. H. C. Scrimgeour, T. Toong, R. E. Hamilton
"The principles involved in the use and application of mathematical models as an aid to the development of advanced process control computer systems are described briefly. This is followed by a brief
Jan 1, 1970
-
A Study of Operating Data from Ball Mills Operating in Quebec, Ontario, Manitoba, and British ColumbiaBy L. E. Djingheuzian
IN 1953, Lewis (1) published an article which brought forth a great amount of discussion by grinding engineers. In his contribution to discussion the present writer (2) suggested that, for the most ef
Jan 1, 1957
-
Overview of the Agrium Kapuskasing phosphate operationBy R. Pressacco
"IntroductionAgrium’s history in fertilizer production and marketing goes back to 1931. Today, Agrium Inc. is a world leader in the production, distribution, and marketing of fertilizers and related p
Jan 1, 2001
-
Sodium and Magnesium Salts of Western CanadaBy L. Heber Cole
The search for potash in western Canada during the years of the great war led to the staking of claims on many of the "alkali lakes" and sloughs which occur in numerous localities in the morainic area
Jan 1, 1924
-
The Canada Tungsten Property, Flat River Area, Northwest TerritoriesBy L G. White
During 1958, prospecting parties working for the Mackenzie Syndicate in the Flat River area of the Mackenzie mountains, Northwest Territories, identified tungsten mineralization and located the proper
Jan 1, 1963
-
Processing Practice at Central Canada PotashBy W. Hrynewich
"The Central Canada Potash facility, a division of Noranda Metal Industries Limited, is located 3 kilometres south of the junction of Highways 16 and 2, about 75 kilometres south-east of Saskatoon, Sa
Jan 1, 1982
-
Criticality-Based Model for Rehabilitating Subway StationsBy M. Abouhamad
According to the Canadian Urban Transit Association (CUTA), 140 Billion CAD is required to maintain, rehabilitate, and replace subway infrastructure between 2010 and 2014. The current practice adopted
Aug 1, 2013
-
Vision Zero ? The New Global Strategy for Safe MiningBy Helmut Ehnes
Over 330 million accidents at work happen world wide every year, only counting those leading to more than four days absence. More than 350,000 end fatal. Two million people more die every year due to
Aug 1, 2013
-
The Bullmoose Mille ProjectBy R. Drozd
"The Bullmoose Mine is currently under construction in the North East Coal area of British Columbia, and approximately $300 million will be spent to bring this 2.3 million-tonnes-per-year metallurgica
Jan 1, 1983
-
The influence of a delaminated layer on the impedance spectrum of an operating solid oxide fuel cellBy J. I. Gazzarri
A model of solid oxide fuel cell AC impedance behaviour has been developed and is used to simulate the frequency response of a single cell with and without mechanical damage. The results indicate that
Jan 1, 2005
-
The Geology and Ore Deposits of the No. 8 Shaft Area, Dome MineBy Dean S. Rogers
"In February 1980, Dome Mines Limited announced a $50 million expansion program which would result in a 50% increase in mill capacity from the present 1,815 tonnes per day to an eventual production ra
Jan 1, 1982
-
Reagent Selection at the Gibraltar Mine for Improved Process PerformanceBy F. Chachula, A. Molinaro
"Sulphide mineral flotation operations continuously strive for a balance between mineralogy, mineral liberation, circuit conditions and reagent solutions to maximize the production rate and recovery o
Jan 1, 2018
-
Investigation into Long-Term Strength of Brittle Rocks Based on MicromechanicsBy Z. S. Shao, X. Z. Li
"Sub-critical crack growth plays an important role in long-term creep failure in brittle rock. Based on micromechanics established by using relationship between micromechanical wing crack growth model
Jan 1, 2015
-
Estimating Loading on Rebar Bolts Using Distributed Optical Sensing TechnologyBy D. Beneteau, L. Feldman, D. Milne, A. Hyett, G. Snell
"Behaviour of rebar bolts subjected to combined shear and bending in underground potash mining applications is not well understood. An experimental investigation compared load applied to resin-grouted
Jan 1, 2019
-
A Discussion of Deep Drilling In the Blind River AreaBy D. S. Robertson
More than 700,000 feet of diamond drilling was completed in the Blind River area between 1953 and 1958. Much of this drilling was at depths which are still not usual in North America. However, as the
Jan 1, 1962
-
Borehole hoisting at Sherritt's Fox MineBy J. G. Kelly, C. P. Brown
"In June 1983 a new borehole hoisting system was commissioned at Sherritt Gordon's Fox Mine. Twelve hundred tons-per-day of ore from the 2600 and 2800 levels are being hoisted to the 2000 level t
Jan 1, 1985
-
The use of Aircraft in Mineral Exploration and DevelopmentBy G. C. Mackenzie
At the last Annual Meeting of the Institute, Dr. C. V. Corless sketched the potential mineral wealth of Canada so clearly, graphically and with-all so entertainingly that one's imagination was fi
Jan 1, 1924
-
Diamond drilling as an aid in ore definition at the Dome MineBy D. S. Rogers
"Throughout the history of mining at the Dome, gold has been found in a number of different rock types and in association with a number of different structural settings. Diamond drilling plays an impo
Jan 1, 1982
-
Aur Resources Inc. Session Introduction (CIM 105th Annual General Meeting Montreal, May 5 - 7, 2003)By Robert Hamilton
Aur Resources is Canada's leading copper mining company with producing mines and development projects in North, Central, and South America. Copper production from Louvicourt Mine in Quebec, Quebr
May 1, 2003