Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Case History of Lost Circulation Jobs Leduc-Woodbend Field, Alberta

    By H. F. Naldrett

    "AbstractAt the end of May, 1950, Imperial Oil, Limited, had completed a total of 192 D-3 wells in the Leduc-Woodbend field, 62 of which lost circulation in the D-3 zone for periods ranging from two h

    Jan 1, 1950

  • CIM
    Rope Maintenance on Friction Hoists

    By George Delorme

    "AbstractThe basic intention of this paper is to present, from a practical viewpoint, a thorough outline of all the sound and accepted principles connected with attaining satisfactory rope performance

    Jan 1, 1977

  • CIM
    Best Practices in Sustainability Reporting in the Global Mining Industry

    By Andrew Gillam

    Outline of Presentation ? AMEC overview ? Benchmarked companies ? GRI 3.1 Guidelines ? Best practice examples ? Report content and boundary ? Strategy and profile ? Environmental ? Social GRI

    Aug 1, 2013

  • CIM
    Lateritization as a Major Process of Ore Deposit Formation in the Amazon Region

    By Marcondes Lima Costa

    Abstract-The Amazon region is characterized by the development of deep chemical weathering represented by widespread lateritic covers and soils. Two distinct periods of laterite formation can be disti

    Jan 1, 1997

  • CIM
    Lateritization as a Major Process of Ore Deposit Formation in the Amazon Region (5b5e5ff1-6b6d-4fad-a9e8-f2a546f4af00)

    By Marcondes Lima Costa

    The Amazon region is characterized by the development of deep chemical weathering represented by widespread lateritic covers and soils. Two distinct periods of laterite formation can be distinguished:

    Jan 1, 1997

  • CIM
    Exploration techniques for sand and gravel

    By D. F. VanDine

    The phases of a typical exploration program for sand and gravel resources include: (1) collection and assessment of existing information; (2) air photo interpretation and remote sensing; (3) ground in

    Jan 1, 1984

  • CIM
    An Intelligent System for Monitoring Tower Cranes on Construction Sites

    By M. A. Nadar

    Harsh and dynamic construction sites are generally equipped with cranes in order to rapidly and conveniently move heavy loads from one location to the other. If not properly inspected and managed, thi

    Aug 1, 2013

  • CIM
    Systems Analysis of the Efficiency of Technological Solutions for Opening up an Orefield

    By G. Mihaylov

    The basic principles of systems analysis are presented. A model has been designed to determine the location of the Main opening in the presence of three or more stock orebodies. The necessary conditio

    Aug 1, 2013

  • CIM
    Case Study - Ventilation Duct Criteria Pros and Cons How to Effectively Lower Operating Costs during the Tender Process

    By J. Holtzhausen

    "An analysis of operating costs for underground mining operations in the current global economic climate considers the financial burden for a ventilation system to be in vicinity of 30–50%. These oper

    Jan 1, 2019

  • CIM
    Harnessing a Global Workforce - Best Practice from the Oil and Gas Sector Capability Development and Competence Assurance (CDCA)

    By Alyson Morley

    The mining sector in Canada is facing significant challenges to develop a competent workforce, including increased technical and logistical operational demands, and the imperative to promote local con

    May 1, 2007

  • CIM
    From Exploration to Production

    One Data Set for the Lifecycle Complete data captured at the logging stage benefits the entire life cycle Exploration Technical Studies Production and Milling Visible Light Spectrum Hyperspectra

    May 1, 2013

  • CIM
    Meeting the Challenge of the 80's Cost Reduction Measures at the Iron Ore Company of Canada's Carol Project 1980-85

    By I. A. Tinto

    "Labrador City is located in the southwestern portion of Newfoundland-Labrador, approximately 965 kilometers north-east of Montreal. The mine and beneficiation complex of the Iron Ore Company of Canad

    Jan 1, 1986

  • CIM
    Iron and Steel Plants Based on Modern Pre-and Direct Reduction Processes

    By Horst Konig

    This paper illustrates that, with the application of new processes, smaller steel plants using local raw materials can be economical and advisable. It also introduces the problems connected with the d

    Jan 1, 1970

  • CIM
    Environnement Minier: Gestion des Résidius Miniers et Restauration des Sites

    By Isabelle Demers, Audrey Jalce

    L’industrie minière génère chaque année une quantité considérable de rejets miniers, principalement sous forme de stériles ou de résidus de l’usine de traitement. Les stériles sont des roches sans val

    May 2, 2024

  • CIM
    Hybrid Power at Remote Mining Sites to Reduce Electricity Costs

    By Michel Carreau

    Renewable assets have large upfront capital costs but minimal operating expenses over their lifetimes. In some instances, deals can be structured so that direct capital investment is feasible, with pa

    Aug 1, 2013

  • CIM
    The Collection and Management of Environmental Data at Mine Sites

    By Paul J. Beck

    The impact of mining development on the environment can be minimized through comp careful construction and accurate monitoring. Key to meeting these objectives is t information at all stages of design

    May 1, 2004

  • CIM
    Geological Setting of Volcanogenic Massive Sulphide Deposits and Active Hydrothermal Systems: Some Implications for Exploration

    By C. Jay Hodgson

    Hydrothermal systems form on land where and when an impermeable cap-rock unit ( either natural or self-sealed) , a permeable aquifer. and permeable discharge and recharge channels (cross-stratal perme

    Jan 1, 1977

  • CIM
    Sustainability in Plant Design

    By Ben C. McLellan, Philip J. Bangerter, Andrew Murphy, Glen D. Corder, Damien Giurco

    Sustainability now forms a critical part of metallurgical plant design. In addition to compliance with requirements and corporate principles, design engineers must also consider how community and soci

    Jan 1, 2015

  • CIM
    Innovations In Hydrometallurgical Performance Management: Heap Leaching Solvent Extraction And Electrowinning Plants

    By O. A. Bascur

    Several new hydrometallurgical plants have been built in the past years, new processes and equipment as well as advanced process control systems are being used to deal with the increasing requirements

    Jan 1, 2007

  • CIM
    Evolution in Texture and its Through-Thickness Variations in Al-Mg-Si-Extrusions: Experiments and Modelling

    By Antonio Segatori, Bjørn Holmedal, Kai Zhang, Trond Aukrust, Knut Marthinsen

    "The visual appearance and mechanical properties of aluminium alloy extrusions are strongly dependent on the microstructure and texture of the extruded profiles, where the desired microstructure and t

    Jan 1, 2018