Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The AMBS Flotation Process for Copper and Copper-Gold Ores: Bench to Plant ApplicationsBy B. K. Gorain
"The Air-Metabisulfite (AMBS) process has been developed to treat complex copper, molybdenum and precious metals (gold, silver) bearing ores using brackish and sea water. This process was able to prod
Jan 1, 2016
-
Gaining Insights into Mentorship Initiatives in the Canadian Mining IndustryBy S. Espley, T. Nyabeze, D. Beneteau
"Many mentorship programs are available to Canadian mining industry employees. Some are company-led initiatives, whereas others are provided through educational institutions or nonprofit organizations
Jan 1, 2018
-
Mount Milligan Mine Performance UpdateBy B. Simonian
"The Mount Milligan mine, located in central British Columbia, began operation in September 2013 with a design nameplate capacity of 62,500 dry metric tonnes per day, using a conventional SABC grindin
Jan 1, 2019
-
Innovations and Breakthroughs in Mineral processing that have shaped the Existing Mining IndustryBy B. K. Gorain
"As mining has evolved over a century, so are the challenges associated with mining. Mining of complex ore bodies at greater depths is a major challenge requiring high capital and operating costs due
Jan 1, 2016
-
Determining Fill Fence Stability During Increased Backfill Rates at an Underground Hard Rock MineBy K. K. Dehn
This study focused on determining the stability of thin shotcrete fill fences at a hard rock mine in northwestern Ontario during increased pour rates of paste backfill. Determination of the stability
May 1, 2007
-
Drillhole Placement Subject to Constraints for Improved Resource ClassificationBy J. B. Boisvert, D. S. Silva
"Drillhole placement involves benefits, costs, and constraints. Benefits are related to the drilling campaign value, which includes maximizing “indicated” and “measured” resources. Costs include drill
Jan 1, 2018
-
Insurability of Unknown Postclosure LiabilitiesBy C. Kunze
ABSTRACT Although closure sureties cover works that are carried out during the existence of a mining company, certain liabilities are not known when the surety is established and become apparent only
Jan 1, 2013
-
The choice of rockbreakers at Sherritt's Fox MineBy John G. Kelly
"In 1982 an extensive study was carried out to determine the best means of size reduction for the ore to be hoisted through the borehole hoisting system at Sherritt Gordon's Fox Mine.The study ex
Jan 1, 1986
-
The Noranda Process after six years of operationBy A. G. Storey, J. B. W. Bailey
"The Noranda Process at the Horne Division ofNoranda Mines Limited now smelts approximately 350,000 short dry tons of concentrate a year, which is 40% of the total smelter throughput. Campaigns are av
Jan 1, 1980
-
A preliminary assessment of unconsolidated mineral resources in the Canadian offshoreBy Patrick Mclaren, Peter B. Hale
Canada, with one of the largest continental shelf areas in the world, has done little to evaluate its offshore unconsolidated mineral resources which include heavy minerals (gold, chromite, rutile etc
Jan 1, 1984
-
Application of water covers, remote monitoring and data management systems to environmental management at uranium tailings sites in the Serpent River WatershedBy M. Courtin, D. Berthelot, M. Haggis, D. McClarty, R. Payne
Over forty years of uranium mining in the Elliot Lake region of Ontario (1956–1996) has resulted in the production of over 300 million pounds of uranium. With the completion of mining activity, Rio Al
Jan 1, 1999
-
Odor Sensors for Ore Sorting and Mill Feed ControlBy Michael G. Nelson
Control of the feed provided to mineral processing facilities is a continuing challenge. Much effort is currently being devoted to overcoming these problems. These projects are usually described under
May 1, 2004
-
Kinross Mine Planning Best PracticeBy C. Turek, R. Henderson
Mine planning is the foundation of value for a mining company. Good mine planning requires solid understanding of the ore body, rigorous standards and processes, robust and useful information technolo
Jan 1, 2011
-
Human resources for a global companyBy N. Bédard
"This paper highlights Cambior’s initial approach for recruiting and retaining its international employees, the importance of proper preparation and the support needed to ensure a competent and stable
Jan 1, 2004
-
APC at Laronde: The Progressive Control ApproachBy T. Banerjee, Y. Dumais, R. Lemire
"Agnico Eagle LaRonde produces over 300,000 ounces of gold annually, along with silver, zinc and copper by-products. The LaRonde plant consists of a conventional SAG and Ball mill circuit, followed by
Jan 1, 2018
-
Late Proterozoic and Early Paleozoic Metasediment-hosted Tungsten Mineralization in Central Namibia: Recent Advances in Exploration and ResearchBy N. M. Steven, J. M. Moore, J. L. Kuyper
Abstract - Mineral exploration and research has led to the identification of four types of tungsten mineralization in the NE-trending, largely ensialic, inland branch of the late Proterozoic/early Pal
Jan 1, 1994
-
Mining Methods and Costs at the Josephine MineBy Alan E. Gallie
One of the requirements for the successful waging of war is an unlimited supply of iron ore. In the spring of 1941 the demand for iron ore was expected to exceed the supply. This was particularly so i
Jan 1, 1947
-
Process control and instrumentation in mineral processing plantsBy A. L. Mular
"IntroductionThe mining industry has made slow but steady progress toward the automation of mineral processing plants over the last 35 years. The stimulus to automate is associated with important econ
Jan 1, 1989
-
Non-Oxidative Nickel Leach Capacity Review through Isothermal Modelling Of Mineralogical and Chemical Concentration ProfilesBy E. Engelbrecht
"A pressure non-oxidative leach is employed at Anglo American Platinum Base Metal Refiners to extract nickel from a slow cooled matte. The design base requires two 80 m3 autoclaves in parallel to achi
Jan 1, 2017
-
Preparing a Long-Lasting Environmental Impact StatementBy Glen A. White
The level of impact and mitigating measures that are forecast in an environmental assessment (EA) for a new, or significantly modified, metallurgical processing facility or mine are taking on increasi
May 1, 2004