Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Leaching Practice at Denison Mines an Historical Review

    By E. LaRocque

    "Denison Mines Limited has been processing uranium ore in the Elliot Lake area since May of 1957. The ore body is located i11 the Huronion sediments on the north limb of the Quirke Lake syncline. Mine

    Jan 1, 1979

  • CIM
    Simulation of Closed Circuit Mineral Processing Operations Using Limn® ?Flowsheet Processing Software.

    By Donald Leroux, Colin Hardie

    "New or improved mathematical models of mineral processing machines are published almost on a monthly basis. Often, these models can be calibrated from bench-scale test results and programmed using sp

    Jan 1, 2003

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • CIM
    Considerations Regarding the Development of an Economic Mathematical Model for Optimizing the Technological Variants in the Coal Mine Faces

    By Dolea Gabriel Gheorghe

    In the present paperwork is proposed an economical-mathematical model (fuzzy) that aims optimize the technological variants of the mechanized coal face. By fuzzification, the issues to solve become mo

    Oct 1, 2009

  • CIM
    Mineralogical Tracing of Metallurgical Results - The Sarcheshmeh Copper Mine Case

    By S. Banisi, H. R. Iran-Manesh, M. R. Shayestefar, H. Shekarchyan

    "Flotation circuit of the Sarcheshmeh copper mine processes 41,000 t/d of ore at 0.9% Cu. Chalcopyrite and chalcocite are the main copper bearing minerals which are concentrated in three stages of rou

    Jan 1, 2003

  • CIM
    Functional Performance of Ball Milling

    By K. Wood, R. McIvor, P. Blythe, M. Lavallee

    A new analytical approach for characterizing and improving the performance of ball milling is presented. Individual ball mill circuit design and operating variables can be related to overall circuit p

    Jan 1, 1990

  • CIM
    The Aurora Super-Pump, a Large Diameter Slurry Pump for Aurora North

    By D. Wolfe, R. Cleminson

    "The Aurora North mine has been operating for more than ten years, and is the source of over half of Syncrude’s bitumen production. The slurry systems at Aurora experience high rates of wear, and miss

    Jan 1, 2013

  • CIM
    Cluff Lake Mill - Phase 2 Expansion

    By H. A. Schnell

    "The Phase I Mill at Cluff Lake in northern Saskatchewan was designed to accommodate a very specific high grade uranium ore. As this high grade ore was depleted, construction was undertaken on a new m

    Jan 1, 1985

  • CIM
    Transforming Flow Sheet Design with Inert Grinding – the IsaMill

    By K. E. Barnes

    "The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin

    Jan 1, 2006

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • CIM
    Including In-Process Inventories in the Metal Accounting of Flotation Plants

    "Increasing demand for timely and accurate information about flotation plant performance requires metal accountants to increase the scope and reporting frequency of plant production. This trend has br

    Jan 1, 2014

  • CIM
    Mineralization and Metallurgy of the Samatosum Project

    By P. J. Gron

    "The Samatosum Project is a base and precious metal deposit located in south central British Columbia. A dilute ore reserve of 766, 682 tonnes grading an average 1.1% copper, 3.0% zinc, 1.4% lead, 833

    Jan 1, 1990

  • CIM
    Residual Effects of Lognormality in Concentrator Data

    By Norman O. Lotter, André R. Laplante

    "The pursuit of concentrator surveying for purposes of metal accounting or process optimization has not yet connected with the well-published realm of geostatistics. The reality of lognormality in tim

    Jan 1, 2005

  • CIM
    The Economics of Individually Motorized Rail Cars in Block Caving Operations

    By Scott A. Stebbins

    Cost evaluation models constructed specifically to evaluate the economic potential of an individually motorized railcar system of ore and waste transport demonstrate that the approach may be considera

    Nov 1, 2011

  • CIM
    Geometallurgical Mapping: A New Approach That Reduces Technical Risk

    By Jean M. Richardson, Steven R. Williams

    "Geometallurgical mapping is a new team-based approach that documents variability within an orebody and quantifies the impact of geology (host rocks, alteration and structure) and mineralogy on grindi

    Jan 1, 2004

  • CIM
    Accounting for Dilution in Ore Resource Estimation

    By Mario E. Rossi

    The full economic evaluation of a mining project requires a block model that provides an estimate of the tons and grades of available resources. The model must be representative of the mineralization

    May 1, 2009

  • CIM
    Problem Identification for Low Gold Recovery and Application of Treatment at Somita Plant

    By B. Roy

    The Somita plant processes low sulphide gold ore in Burkina Faso with a CIL process. After experiencing recurrent low gold recoveries, Somita undertook an investigation on the source of the problem. C

    Jan 1, 2014

  • CIM
    Commissioning and Testing of Thickener Feed De-Aeration Cyclones at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Simon Pelletier, Rakan Rhabani, Guy Comeau

    "In order to improve the nickel concentrate thickener operation at Raglan Mine, two pulp deaeration cyclones were installed. These units obtained from Outotec Pty Ltd, also called the FrothBuster®, ha

    Jan 1, 2008

  • CIM
    Silica Flotation and the Use of Fine Screening in Iron Ore Beneficiation

    By G. Major-Marothy

    "INTRODUCTIONA beneficiation plant to upgrade earthy iron ores is being installed by the Iron Ore Company of Canada in Sept-Iles, Quebec.The crude ore for the plant will come from the Knob Lake area,

    Jan 1, 1972