Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Quantifying the effect of climate and surface materials on post-mining landscape erosion – a risk approach using landscape evolution models

    By D C. Verdon-Kidd, G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard

    Designing post-mining landscapes requires quantifying the short and long-term risks. In recent years, computer based landscape evolution models (LEMs) have been used to provide insight into both erosi

    Jul 25, 2018

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • AUSIMM
    Peak Gold Mine - A Different Approach to Underground Mining

    By R H DAVIES

    Peak Gold Mine is a new gold and base metal mining project being developed by Enterprise Metals (a 100 per cent subsidiary of CRA) at Cobar in the centre of New South Wales. The Cobar district has a

    Jan 1, 1992

  • AUSIMM
    Spaceborne Radar Interferometry for Mine Subsidence Monitoring in Australia

    By C Rizos, A Ng

    Land surface deformation can be caused by underground mining activities. The maximum subsidence normally occurs directly above the location of the excavation of the coal seam. In the case where the lo

    Jan 1, 2008

  • AUSIMM
    Shifting post-mining land use planning from mine site to regional scale

    By C M. Côte, S Worden, K Svobodova

    Mines in Queensland are transitioning to the progressive rehabilitation and closure plan (PRCP) framework. Mine operators are required to select and justify appropriate and viable post-mining land use

    Aug 2, 2023

  • AUSIMM
    Optimisation of surface tailings storage and tailings backfill – a case study

    By B P. Wrench, N R. Steward, C Wu

    A gold mine in southern China has transitioned from an open pit operation to a fully underground mine. An overhand mining method is used which requires the mined stopes to be filled with backfill havi

    Jul 23, 2018

  • AUSIMM
    The Success of Fly-in-Fly-out Australian Mining Operations

    By Wu H. W, Just G. D

    Australia's mineral resources boom in the two decades up to 1980 saw the establishment of about 25 new mining towns across the continent Quality housing and a high standard of community service

    Jan 1, 1991

  • AUSIMM
    Mechanisms of Metal Release From Subaqueous Mine Waste at Circum-Neutral pH ù Examples From Four Case Studies

    By J J. McNee and, J Crusius, T F. Pedersen

    The use of water covers is a globally-applied method for minimising acid rock drainage (ARD) and metal leaching. Although the subaqueous disposal of potentially acid-generating materials has been show

    Jan 1, 2003

  • AUSIMM
    Environmental Geotechnics in Spoil Dump Design for Erosion Management - A Probabilistic Approach

    By J S. Kuszmaul, T O. Aspinall

    The applicability of environmental geotechnics for erosion management is increasing in importance worldwide. The environmental impact of mining and evolving environmental legislation has been receivin

    Jan 1, 1998

  • AUSIMM
    Making Design and Construction Work

    By S Porter

    The Melbourne City Link Project is a privately funded road infrastructure project linking three significant existing freeways in the vicinity of the Central Business District. The State Government, th

    Jan 1, 1999

  • AUSIMM
    Safety at home – this is where mine safety starts

    By K Biegaj

    During the author’s 25+ year career in mine management in various parts of the world (mostly in Australia), the author has been privileged to live and work in mining towns (not FIFO) for more than 20

    May 5, 2022

  • AUSIMM
    How economics drive the application of ore sorting

    By W Kendall

    Ore sorting has the potential to reduce the feed to wet plants and in the case of complex orebodies that can significantly reduce the water, energy and reagent consumptions and resulting operating cos

    Nov 21, 2018

  • AUSIMM
    The Development and Application of Health, Safety, Environment and Community Management Standards in BHP Billiton

    Prior to the merger of BHP and Billiton, both companies had a keenfocus on improving their performance in health, safety, environment and community (HSEC) matters. This shared intent, albeit executed

    Jan 1, 2002

  • AUSIMM
    Do We Need to Change the Way We Set Up the Stage?

    By A Datar, D Mulligan

    The extractive phase of broad-scale mining can have major impacts on landscapes and associated ecosystems. Post-mining ecological rehabilitation typically starts with reconstructing topography. A fair

    Jul 16, 2014

  • AUSIMM
    Estimating Mineralogy in Bulk Samples

    By R Berry

    This paper looks at two ways to estimate the bulk mineralogy of the rocks for assay intervals. The aim is to find an efficient indicator of the most common minerals in the rock. Phase (modal) analysis

    Sep 5, 2011

  • AUSIMM
    Obtaining a Representative RCSample ù The Cone Splitter Versus the Tiered Riffle Splitter

    By P Church

    What is the best method of splitting a sample from a reverse circulation drill rig? How important is it to obtain a correctly split sample? What is the impact of an incorrectly split sample? These are

    Jan 1, 2003

  • AUSIMM
    Selection of Ore from Multiple Pits

    By J E. Everett

    When ore is being selected from a regularised block model, a common procedure is to accept as ore any block whose iron content exceeds a cut-off value, and whose content in each contaminant analyte is

    Aug 12, 2013

  • AUSIMM
    LPG Storage Cavern Blasting Techniques in Sydney Sandstone

    The project is undertaken by Elgas Pty Ltd, a 50 per cent joint venture between AGL and BOC, to store 65 000 t of LPG in underground storage at Port Botany, NSW. The contractor, Concrete Constructions

    Jan 1, 1999

  • AUSIMM
    Traversing the Valley of Death – upscaling the REFLUX™ flotation cell

    By M J. Cole, J Zhou, D J. Borrow, S M. Iveson, K P. Galvin, J L. Sutherland

    New technologies can easily take around ten years to commercialise. Strong research support is needed in parallel with the process of innovation and commercialisation, in building a deeper understandi

    Aug 24, 2022

  • AUSIMM
    Mine Hoists for the Nickel Rim South Project

    By T Gartner

    This paper describes the design, manufacture and site services associated with the supply of mine hoists for the new mine under construction by Falconbridge Limited in Ontario, Canada. Two new shafts

    Jan 1, 2005