Selection of Ore from Multiple Pits

The Australasian Institute of Mining and Metallurgy
J E. Everett
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
7
File Size:
2009 KB
Publication Date:
Aug 12, 2013

Abstract

When ore is being selected from a regularised block model, a common procedure is to accept as ore any block whose iron content exceeds a cut-off value, and whose content in each contaminant analyte is below an appropriate cut-off value. This method defines a quadrant within the multidimensional analyte space, such that any block lying within the quadrant is accepted as ore and any block lying outside the quadrant is rejected as waste. The cut-off levels can be adjusted to maximise ore tonnage at a target grade (or analyte vector). When the method is applied to a project comprising multiple pits with systematically differing grades, it is found that ore tonnage at target grade is maximised if different cut-off quadrants are used for the different pits. This is apparently illogical, because it implies that an ore block from one pit may be accepted as ore, but an identical block from another pit is rejected as waste, even when ore from both pits is to be blended into the same product and there are no production cost differences between the pits. The paradox is an example of the ætheory of the second bestÆ: if there are multiple conditions for optimality and one condition is broken, then obeying the other conditions may not be the best policy. The problem lies with the quadrant cut-off method, which is shown to be inconsistent even for selecting ore from a single pit. A criterion that is inconsistent cannot be optimal. It is shown that a linear composite cut-off function provides maximum ore tonnage, and that a single composite cut-off criterion is consistent and optimal over multiple pits. Further, it is shown that a composite cut-off function not only maximises ore tonnage at a specified composition, but also can be used to select ore so as to maximise project value, if marginal costs and values are available.CITATION:Everett, J E, 2013. Selection of ore from multiple pits, in Proceedings Iron Ore 2013 , pp 185-192 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Citation

APA: J E. Everett  (2013)  Selection of Ore from Multiple Pits

MLA: J E. Everett Selection of Ore from Multiple Pits. The Australasian Institute of Mining and Metallurgy, 2013.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account