Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Delay Variability: Effect and Design to Minimise these Effects

    The statistical nature of the variability in detonation times of pyrotechnic delays is discussed, and how to evaluate the probability of required detonation intervals is shown. Some methods (analytica

    Jan 1, 1992

  • AUSIMM
    The Structural and Tectonic Development of the Frieda River Mineral District, NW Papua New Guinea

    By Hill KC, Foster DA

    Methods for ore reserve estimation are classified. The amount of information needed to asses ore reserves is analysed. Reference is made to gold sampling. Consideration is given to nugget effects a

    Jan 1, 1997

  • AUSIMM
    Methods and Approach to Exploration for Hard Rock and Alluvial Gold in Indonesia

    By Dods G. H, Hewitt W. V

    Ashton Mining Limited is currently one of the active companies undertaking gold exploration in Indonesia. Presently 7 Contract of Work areas are being explored for hard rock and alluvial gold. Hard

    Jan 1, 1991

  • AUSIMM
    Case Study on the Remediation of a Remote Acid Mine Drainage Site in South Africa With Emphasis on Low Cost Measures and Cost Benefit Assessments

    By N Swiegelaar

    Loubert Witbank is a defunct coal mine situated near Ermelo in South Africa. Mining ceased in 1992, and within a short period acidic decant occurred, with a significant impact on the regional catchmen

    Jan 1, 2003

  • AUSIMM
    Potential for Future Developments Outside of Existing Fields in the Gippsland Basin

    By MacLean L

    In 1975 the Commonwealth Government established import parity pricing for all liquid hydrocarbons discovered after the 16th September, 1975. These discoveries were termed "new oil" to differentiate

    Jan 1, 1982

  • AUSIMM
    Reduction of Geological Hazards along the Pacific Rim: And IDNDR Challenge

    The international scientific and engineer-ing community is being challenged to take advantage of the opportunity offered by the U.N. International Decade for Natural Disaster Reduction (IDNDR) program

    Jan 1, 1990

  • AUSIMM
    Cap Rock Blasting Improvement at Worsley Alumina

    By L Neems

    In conjunction with Orica Explosives, Worsley Alumina have managed a program of continuous improvement to their cap rock blasting over the last two years. Blasting conditions are challenging because o

    Jan 1, 1999

  • AUSIMM
    A Review ù Pillar Stability Issues at DOZ Block Cave Mine

    By D Flint, O Rindriatmoko

    PT FreeportÆs Deep Ore Zone (DOZ) Mine is the latest block cave mine within the East Ertsberg Skarn System (EESS).Issues with undercutting and stress concentrations at the extraction level were experi

    Jan 1, 2005

  • AUSIMM
    Mine Rehabilitation: An Economic Perspective on a Technical Activity

    By Cox A

    A key concern both in public perceptions of the environmental performance of the mining industry and in the development of policy relating to mining activities is the state in which the areas may be l

    Jan 1, 1992

  • AUSIMM
    Blasting in Sydney Sandstone to Speed-Up Tunnelling in the Northside Storage Tunnel

    By R Williams, P Kohout, J Comins

    The Northside Storage Tunnel (NST) is the largest tunnelling project ever undertaken in Sydney. The tunnel extends deep underground from the western bank of the Lane Cove river to the North Head sewag

    Jan 1, 2001

  • AUSIMM
    Paper No. 162. The Refining of Base Bullion at Port Pirie, and Treatment of By-Products.

    The article, as written, represents a short account of the treatment of the base bullion from the Broken Hill ores, as carried on at Port Pirie, for the recovery of lead, silver, and gold, and for the

    Jan 1, 1907

  • AUSIMM
    Tasmania's Mining Heritage

    The region we call the West Coast is acknowledged as one of the richest and most diverse mineral provinces in the world. It's the most rugged part of Tasmania and our island is one of the most ru

    Jan 1, 1993

  • AUSIMM
    No. 3 Shaft Winders and Winder House

    The sinking of the new No. 3 Shaft being mainly concerned with providing for the continuation of mining operations north of the existing workings, requirements for the shaft and haulage equipment were

    Jan 1, 1957

  • AUSIMM
    Characterisation of Coal Micro-Structure Using Scanning Electron Microscopy

    By Beamish B. B

    In this study, a systematic examination of the scale and variety of micro-structures in coal using Scanning Electron Microscopy (SEM) has been carried out, using coal samples of differing stages of

    Jan 1, 1991

  • AUSIMM
    Tube Making in Australia

    The title of this paper suggests rather a comprehensive survey of the industry, but since it is not possible to do justice to this in a short paper, and, as the bulk of the Australian trade consists o

    Jan 1, 1935

  • AUSIMM
    Evaluation of Gravity Spirals for Beneficiation of Banded Haematite Jasper Iron Ore of India

    By D R. Venkatesulu, N K. Nanda

    Due to increased production of steel in India, the thrust is now on iron ore producers not only to enhance productivity from existing mines, but to look also into alternative resources, like lean grad

    Jan 1, 2009

  • AUSIMM
    Olympic Dam Operation - An Overview of Underground Design and Planning

    Olympic Dam Operation is located in the Stuart Shelf Geological Province approximately 520 km north-north-west of Adelaide in South Australia. It is estimated to be one of the worldÆs top five copper

    Jan 1, 1999

  • AUSIMM
    Direct Estimation of Sampling Variance From Time Series Measurements ù Comparison to Variographic Analysis

    By M Paakkunainen

    Sampling is often the most critical part in process analysis. When the mean of a continuous lot, such as a process stream within a given time interval, is estimated by calculating the mean of several

    Jan 1, 2005

  • AUSIMM
    Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)

    By Medhurst TP, Trueman R, Hutchinson IN

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed

    Jan 1, 1992

  • AUSIMM
    Red mud to green iron – proposed pathway for iron elution via bioleaching of bauxite residue

    By A Tolley

    Bauxite residue or ‘red mud’ is a by-product of the Bayer Process, the primary process of alumina refining. Due to its high alkalinity and variable composition, its storage and disposal poses high env

    Sep 18, 2023