Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure

    By D J. Robinson, L L. Kuhar

    "Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to

    Nov 15, 2016

  • AUSIMM
    Excavation by Tunnel Boring Machine in Headrace Tunnel of Small Cross Section

    By Hori M, Komatsu T

    In Japan, a small-diameter tunnel boring machine (TBM) of diameter 2.6 m applicable to a wide range of geology from hard rock to soft strata was developed with the purpose of reducing construction

    Jan 1, 1987

  • AUSIMM
    Driving Mine Performance through Communication

    By S Jeffrey, S Mundell, F Arboleda

    In the current cycle of low commodity prices and rising costs, mine managers continue to focus on optimising mine performance and productivity. A critical component of strengthening performance and pr

    Jun 22, 2016

  • AUSIMM
    Savage River Mines The World's First Long Distance Iron Ore Slurry Pipeline

    By Davis RA, Wasp EJ, Cowper NT

    The transportation of solids by pipeline is not new. In 1891 a United States patent broadly covering a method of pumping coal with water was granted to W. C. Andrews. His pilot plant was constructed

    Jan 1, 1969

  • AUSIMM
    Improving fine sulfide mineral recovery in Independence Group’s Jaguar Mine zinc circuit

    By B Lumsden, R Smiles

    Independence Group’s Jaguar Mine treats a polymetallic ore producing a copper concentrate and zinc concentrate. Effective separation of the sulfides requires relatively fine grinding with flotation fe

    Aug 29, 2018

  • AUSIMM
    Bio-oxidation Heaps and AMD from Waste Rock Dumps - The Importance of the Intrinsic Oxidation Rate

    By A I M Ritchie

    The pyrite oxidation rate is a process central to both the performance of bio-oxidation heaps, used in the pre-treatment of some refractory gold ores, and to the levels of pollution in acid rock dra

    Jan 1, 1994

  • AUSIMM
    A New Method for Sampling from High Capacity Screens

    By B W. Atkinson

    Full-stream mechanised sampling apparatus, that collect a full cross-sectional increment from the complete screen discharge, will always be the preferred option for sampling screen overflows. However,

    Aug 21, 2012

  • AUSIMM
    Measurement and Assessment of Bulk Explosive Products

    By G Cavanough, A Olsson, J Rock, A C. Torrance

    There are various methods currently in use to determine detonation performance of bulk explosive products including velocity of detonation (VOD), high speed photographic analysis, fragmentation analys

    Aug 24, 2015

  • AUSIMM
    Integration of the Beneficiation Process into Iron Ore Resource Utilisation

    This paper describes the technical development of the Newman beneficiation plant over its 23 years of operation and how this development relates to the mine ore reserves of high-grade and low-grade or

    Jan 1, 2002

  • AUSIMM
    Importance of the simple shear loading direction to the stability of tailings storage facilities

    By D Reid

    The engineering properties of soils and tailings often exhibit significant anisotropy. One area where this has been well documents is undrained shear strength. Materials sheared in directions close

    Jul 23, 2018

  • AUSIMM
    Exploring Optimised Delay Timing for Fragmentation

    By C K. McKenzie

    As more and more mining operations around the world either switch to, or trial, electronic initiation systems, the breadth of knowledge and experience regarding their effective application has widened

    Nov 8, 2011

  • AUSIMM
    A Logical Approach to Determination of Density and Porosity Values for Iron Ore Deposits

    The importance of the accurate determination and interpretation of the bulk density and porosity of a given iron ore deposit is very often disregarded or neglected. Large amounts of time and money are

    Jan 1, 2007

  • AUSIMM
    Issues Confronting Major Expansions and New Developments

    The mining industry has expanded significantly in the Pacific Region over the past two decades through a mix of new developments and brownfields expansions of existing operations. Despite this overall

    Jan 1, 2004

  • AUSIMM
    Importance of Effective Sampling and Test Work Protocols for Process Plant Design

    By N Guresin, A Cooper, L Lorenzen, H Muller, S C. Dominy

    Sampling and metallurgical test work during various phases of engineering?studies?is of?paramount importance for a robust processing plant design. When developing a process flow sheet, risks in achiev

    Aug 21, 2012

  • AUSIMM
    A Multi-year Assessment of Landform Evolution Model Predictions for a Trial Rehabilitated Landform

    By G Hancock, J Lowry, T Coulthard, W Erskine, M Saynor

    An important part of planning for the rehabilitation of uranium mine sites is the ability to assess the geomorphic stability of the final landform, over time frames ranging from decades to millenia. D

    Jul 16, 2014

  • AUSIMM
    Microseismic Monitoring of Shear Zones and Related Seismic Activity at Broken Hill

    By G C. Reed, J M. Murray

    During more than 100 years continuous mining of the lead-zinc orebody at Broken Hill, an immense amount of geological data has been collected about shear zones related to the orebody. The challenge to

    Jan 1, 2000

  • AUSIMM
    Quantitative Clay Mineralogy for a Calcrete-Hosted Uranium Deposit – Innovative Application of Existing Technology on an Unprecedented Scale

    By C Lower

    An unprecedented, quantitative, deposit-scale understanding of major clay mineral distribution throughout the Yeelirrie uranium deposit has been achieved by adapting the existing HyLogger™/HyChips™ an

    Sep 5, 2011

  • AUSIMM
    Comparing Energy Efficiency in Grinding Mills

    By E Niva

    The IsaMillÖ is challenging the way that plants are designed and operated. This paper challenges existing designs of concentrator flow sheets, particularly focusing on magnetite circuits.   From

    Jan 1, 2008

  • AUSIMM
    Effect of -1 mm particle size fraction on JPU permeability and granulation characterisation

    By O A. Aladejebi, S Mitra, T Singh, D O’Dea, S, T Honey

    Granulation of the iron ore blend and the additives is the foremost step in the agglomeration of iron ore fines to achieve a permeable bed during sintering, which is crucial for sinter productivity. T

    Sep 18, 2023

  • AUSIMM
    Contract Commissioning and Operation of Western Areas’ Cosmic Boy Concentrator

    By C Dick

    Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm

    Aug 8, 2011